June 2025
𝐃𝐨 𝐲𝐨𝐮 𝐭𝐡𝐢𝐧𝐤 𝐯𝐚𝐥𝐮𝐞 𝐬𝐭𝐫𝐞𝐚𝐦 𝐦𝐚𝐩𝐬 𝐚𝐫𝐞 𝐭𝐡𝐞 𝐬𝐚𝐦𝐞 𝐚𝐬 𝐓𝐨𝐲𝐨𝐭𝐚'𝐬 𝐦𝐚𝐭𝐞𝐫𝐢𝐚𝐥 𝐚𝐧𝐝 𝐢𝐧𝐟𝐨𝐫𝐦𝐚𝐭𝐢𝐨𝐧 𝐟𝐥𝐨𝐰 𝐜𝐡𝐚𝐫𝐭𝐬? 𝐓𝐡𝐢𝐧𝐤 𝐚𝐠𝐚𝐢𝐧.
Pdf file - https://lnkd.in/d5pWsXwQ
Time measurement is not time study. Time reduction is the objective of time study. Time taken for each element has to be studied for time reduction opportunities.
CASE STUDY OF SIX SIGMA METHODOLOGY IN WELDING PROCESS VARIATION REDUCTION
https://www.linkedin.com/posts/raj-sanne-a016a5_reduction-of-variation-in-welding-process-ugcPost-7340754510379704321-J9R3
Latest publication on advancing Zero Defect Manufacturing (ZDM) entited "A Capability Maturity Model (CMM) for Long-Term Management of Zero Defect Manufacturing (ZDM) Implementations – ZDM-CMM" presented at the 58th CIRP Conference on Manufacturing Systems.
https://www.linkedin.com/posts/foivos-psarommatis-b0a72893_a-capability-maturity-model-cmm-for-long-term-activity-7340652512988790786-FA7t
System impact principle of industrial engineering.
You have to find impact of your improvement idea on the system.
https://www.linkedin.com/posts/narayana-rao-kvss-b608007_toc-theoryofconstraints-goldratt-activity-7340372035400830978-33dT
ISE Day. 15 September.
https://www.linkedin.com/posts/narayana-rao-kvss-b608007_iseday-iseday2025-isye-activity-7340286592462307329-QoO3
No comments:
Post a Comment