Monday, February 22, 2021

Aa to Az - Industrial Engineers and Their Achievements - Productivity Improvement

 

Alejandro Arroyo

Senior Industrial Engineer

Mexico 


Electrolux

Title: Senior Industrial Engineer

Dates Employed: From Sep 2017 

Location: Juarez, Chih. Mexico


Accountability of industrial engineering department in charge of three engineers, eight process technician and six welding technician.

Responsible of labor productivity, efficiency and utilization, budget, cost reduction projects and over time (KPI’s).

Head count calculation according to the customers demand to guarantee the safety, quality, cost and deliveries metrics.

Supporting the production lines where there are 600 direct labors and 4 lines call washer, dryer, fabrication and painting.

Following up and implementation of engineering change notice (ECN’s).

Working directly with maintenance, facilities, quality, materials, safety and production to solve problems in the production lines.

Equipment and machinery installation assistance and purchasing.

Knowledge and development of continuous improvement methodology and six sigma tools.


Industrial Engineer

Full-time

Dates Employed: Oct 2016 – Aug 2017

LocationJuarez Chihuahua Mexico

Support to the production line with 400 employees like an Industrial Engineer with two industrial technician and four welders in charge.

Responsible of the 3K metal cars and rack to maintenance in optimal condition to move the raw material.

Implemented & developed the lean manufacturing tools such as PDCA, 5 S’s, 7 wastes, standard work, visual factory, problem solving, 5D build in Quality, KPI’s, Data analysis, Line balance, SMED, PFEP, Process mapping, Leveling production system, KAIZEN workshop to continuously improve upon our own records.

Implemented & developed manufacturing tools such as time study, PFMEA, MOST, Poka yoke design, Flow Diagram, Ergonomic analysis, labor map, Poka Yokes design.

Production tooling purchasing order placing. Cost reduction projects leading. Pilot run & new models launch introduction.

Facility design as work station, static rack, dynamic rack, gravity conveyors, production lines, isolations areas and utility carts with Pipe Racking System.

https://www.linkedin.com/in/alejandro-arroyo-91b66256/

https://www.linkedin.com/in/mudassir-ali-57920217a/


https://www.linkedin.com/in/alan-reyes-869297163/


https://www.linkedin.com/in/amit-pangerkar-542b8810/


https://www.linkedin.com/in/avinash-gudmewar-1b97a596/

No comments:

Post a Comment