Showing posts with label Lean systems. Show all posts
Showing posts with label Lean systems. Show all posts

Thursday, November 5, 2026

Lean Software Development and IT Enabled Services


New



AI - Generative AI - LLMs - Applications in Software Development for Productivity and Quality Improvement - Industrial Engineering. 




Cost reduction through Productivity improvement is industrial engineering.

Ubiquity of Industrial Engineering Principle of  Industrial Engineering

Illustration: Google's  Engineering Productivity Department - Evolution of the Department through Automation of Testing. Emergence of Software Engineering Productivity Engineer & Specialist. 

2024 BEST E-Book on #IndustrialEngineering. 

INTRODUCTION TO MODERN INDUSTRIAL ENGINEERING.  Free Download.

https://academia.edu/103626052/INTRODUCTION_TO_MODERN_INDUSTRIAL_ENGINEERING_Version_3_0 

Industrial engineering is done in products, facilities and processes. Improvements or redesigns are done in products, facilities and processes to reduce the quantities of inputs to produce outputs with the designed effectiveness. Effectiveness first. Efficiency next.


Software Development Operation Process Chart - Analysis of Software Writing (Development) Operations - Industrial Engineering in Software Development

https://nraoiekc.blogspot.com/2023/11/software-development-operation-process.html


2023
The authoritative guide to Lean software development

Brad Hipps

10-31-2023

2021


Lean and Agile Software Development
5th International Conference, LASD 2021, Virtual Event, January 23, 2021, Proceedings
Editors (view affiliations)
Adam Przybyłek, Jakub Miler,Alexander Poth, Andreas Riel




2020

Lean Software Development Practices and Principles in Terms of Observations and Evolution Methods to increase work environment productivity
September 2020
DOI:10.13140/RG.2.2.27514.72648
Authors:
Llahm Omar Ben Dalla
Sebha University
Lean Software Development (LSD) is one of the influential Agile Software Development (ASD) methods. Furthermore, the main aim and objective of this essential method is creating customer value as well as swift delivery in time within the required budget. Moreover, the lean methodology can enhance the business domain via adopting the usage of lean principles (LPs) according to the business requirements in diverse domains. This observational paper provides observations on the evolution of lean software development practices as well as principles. This study is a significant in terms of three important contributions: the first stage of the contribution is defined as lean as well as lean principles in terms of powerful as well as weaknesses. In addition, the second contribution studied the relationship between ASD as well as LSD. Further, the study contributes the comprehensive understanding of LSD principles and practices during the recent decade. Additionally, the results of this beneficial study are important for several domains such as the industrial world, the educational world, the manufacturing world as well as the scientific world in addition to researchers who aimed for some investigations outcome based on LSD practices besides principles in manufacturing domain.




___________________


Alliance Software - See for more videos
___________________


2018


Benefits adding lean to agile software development

1) Reduced lead time:
2) Improved flow:
3) Continuous improvement:
4) Improved defect fix rate:

Agile to Lean Software Development Transformation: a Systematic Literature Review
Filip Kisˇs and Bruno Rossi
Proceedings of the Federated Conference on Computer Science and Information Systems, 2018 pp. 969–973
DOI: 10.15439/2018F53
ISSN 2300-5963 ACSIS, Vol. 15, IEEE Catalog Number: CFP1885N-ART c  2018, PTI

2017

What is DevOps


IBM Developer
Published on 1 Mar 2017
http://ibm.biz/ibmdev-newsletter
Get the Developer Webcast Calendar newsletter to learn about new  videos and upcoming webcasts from IBM Developer.

IBM Distinguished Engineer and Solutions Architect Sanjeev Sharma delivers a basic, comprehensive overview of the DevOps.

Productivity of the software development and deployment process is usually improved in two ways:
 - Reduce the amount of rework that needs to be done for the specific project
 - Reduce the amount of overhead in the process in general

Download Sanjeev Sharma's eBook  "DevOps For Dummies": http://ibm.co/devopsfordummies


2014


Lean Engineering: Applying Lean Startup Principles at Paypal
by Bill Scott on Aug 25, 2013
http://www.infoq.com/presentations/paypal-stack


2013

The Lean India Summit - Nov 15-16, 2013
Taj Vivanta Hotel, Trinity Circle, Bangalore
Organized by Knowledge Works
http://www.knowledgeworksindia.com/download/LIS.html

http://leanindiasummit.com/moreinfo/320/

When you agile, you get lean
http://www.solutionsiq.com/confirmation-pages/When-you-are-Agile-you-get-Lean-SolutionsIQ-Charlie-Rudd-white-paper/


Kaizen Principles for Creating Great Agile Teams
http://www.slideshare.net/Leanindiasummit/kaizen-and-fish-28375236



2012
Invisible Waste and Hidden Opportunities in IT
TBMCG article
http://www.tbmcg.com/misc_assets/newsletter/OpEx_0612_TechMatters_IT_Remy.pdf


How to Advance Lean Software Development (Beyond the ‘Toyota Way’)
How-To
May 21, 2012
9 mins

Matthew Heusser is a consulting software tester and self-described software process naturalist who develops, tests and manages software projects. Matt is a contributing editor for Software Test & Quality Assurance Magazine and his blog “Creative Chaos” focuses on software writing. An elected member of the Board of Directors of the Association for Software Testing, Matt recently served as lead editor for “How to Reduce the Cost of Software Testing” (Taylor and Francis, 2011). You can follow Matt on Twitter @mheusser or email him.


Interesting article on What Wipro, a software company learned from Toyota.

A blog on agile development and Kanban

Books on Lean Software Development

Implementing Lean Software Development: From Concept to Cash (Addison-Wesley Signature Series)
by Mary Poppendieck
Lean software development: an agile toolkit By Mary Poppendieck, Tom Poppendieck
2003

Lean software strategies: proven techniques for managers and developers
Peter Middleton, James Sutton

2005
Implementing lean software development: from concept to cash
By Mary Poppendieck, Tom Poppendieck
2007
Leading Lean Software Development: Results Are Not the Point
By Mary Poppendieck, Tom Poppendieck
2009

The Poppendiecks are authors of Lean Software Development, winner of the 2004 Jolt Software Development Productivity Award

The Art of Lean Software Development: A Practical and Incremental Approach


Curt Hibbs, Steve Jewett, Mike Sullivan
"O'Reilly Media, Inc.", 15-Jan-2009 - Computers - 142 pages

This succinct book explains how you can apply the practices of Lean software development to dramatically increase productivity and quality. Based on techniques that revolutionized Japanese manufacturing, Lean principles are being applied successfully to product design, engineering, the supply chain, and now software development. With The Art of Lean Software Development, you'll learn how to adopt Lean practices one at a time rather than taking on the entire methodology at once. As you master each practice, you'll see significant, measurable results. With this book, you will:

Understand Lean's origins from Japanese industries and how it applies to software development
Learn the Lean software development principles and the five most important practices in detail
Distinguish between the Lean and Agile methodologies and understand their similarities and differences
Determine which Lean principles you should adopt first, and how you can gradually incorporate more of the methodology into your process
Review hands-on practices, including descriptions, benefits, trade-offs, and roadblocks
Learn how to sell these principles to management
The Art of Lean Software Development is ideal for busy people who want to improve the development process but can't afford the disruption of a sudden and complete transformation. The Lean approach has been yielding dramatic results for decades, and with this book, you can make incremental changes that will produce immediate benefits.

"This book presents Lean practices in a clear and concise manner so readers are motivated to make their software more reliable and less costly to maintain. I recommend it to anyone looking for an easy-to-follow guide to transform how the developer views the process of writing good software."-- Bryan Wells, Boeing Intelligence & Security Sytems Mission System

"If you're new to Lean software development and you're not quite sure where to start, this book will help get your development process going in the right direction, one step at a time."-- John McClenning, software development lead, Aclara
https://books.google.co.in/books?id=sBy4OrfZyYsC


Lean IT: Enabling and Sustaining Your Lean Transformation 2010 book
http://books.google.co.in/books?id=3Si41XmQlXAC


Lean Enterprise Software and Systems
LESS 2013, Ireland
Conference Proceeding
Preview from Google Books
https://books.google.co.in/books?id=ACm5BQAAQBAJ&printsec=frontcover#v=onepage&q&f=false





Lean Software Development - Tutorial Slides by the Poppendiecks
http://xpday3.xpday.org/slides/LeanTutorial.pdf

Lean Essays
by Poppendieck LLC

Podcast with Mary and Tom Poppendieck
__________________
__________________
Google Video on Competing on Speed
Mary Poppendieck



Research Papers - Lean Software Development

----------------------

Agile to Lean Software Development Transformation: A Systematic Literature Review
Filip Kišš; Bruno Rossi
Abstract:
We wanted to better understand the “agile-to-lean” transformation, in terms of: i) reported benefits, ii) challenges faced, iii) metrics used. Method: we performed a Systematic Literature Review (SLR) about “agile-to-lean” transformations. Results: reduced lead time, improved flow, continuous improvement, and improved defect fix rate were the main reported benefits. Adaptation to lean thinking, teaching the lean mindset, identification of the concept of waste, and scaling flexibility were the main challenges. Lead time was the most reported metric.
Published in: 2018 Federated Conference on Computer Science and Information Systems (FedCSIS)

A selection of articles



The lean gap: A review of lean approaches to large-scale software systems development
J. Pernstål , R. Feldt , T. Gorschek 
Journal of Systems and Software
Volume 86, Issue 11, November 2013, Pages 2797-2821







Updated on 11.3.2024, 27.11.2023, 16 Oct 2021, 28 August 2020,  22 June 2019, 13 March 2015





Original Knol - Knol no. 4309 by NRao - http://knol.google.com/k/narayana-rao/lean-software-development-and-it/ 2utb2lsm2k7a/ 4309




Saturday, September 5, 2026

Industrial Engineering - Foundation of Toyota Production System

New. Popular E-Book on IE,

Introduction to Modern Industrial Engineering.  #FREE #Download.

In 0.1% on Academia.edu. 12750 Downloads so far.

https://academia.edu/103626052/INTRODUCTION_TO_MODERN_INDUSTRIAL_ENGINEERING_Version_3_0



Lesson 40 - Taiichi Ohno on Industrial Engineering. Toyota style Industrial Engineering - Waste Elimination 


Video Presentation by Prof. N.Rao
____________________


https://www.youtube.com/watch?v=xUDpFpNKuKQ
____________________




Taiichi Ohno repeats what Taylor said. Improve every element of an operation/process for total cost reduction.


Improve machining processes,  install autonomous systems, improve tools,  rearrange machines,  improve  transportation methods. Examine available resources and  the materials at hand for manufacturing. optimize their use.

Prevent the recurrence of defective products, operational mistakes, and accidents, and by incorporate  workers' ideas."  


Toyota Industrial Engineering that is Ohno's Industrial Engineering is improving every element of the process and reducing every delay, defect and machine breakdown (Naryana Rao)


Toyota style Industrial Engineering - Ohno


"We have eliminated waste by examining available resources, rearranging machines, improving machining processes, installing autonomous systems, improving tools, analyzing transportation methods and optimizing the materials at hand for manufacturing. High production efficiency has also been maintained by preventing the recurrence of defective products, operational mistakes, and accidents, and by incorporating workers' ideas." Taiichi Ohno (P. 21)

Source: Taiichi Ohno, Toyota Production System: Beyond Large Scale Production, pp. 21-22.

Taiichi Ohno on Industrial Engineering. Toyota style Industrial Engineering - Waste Elimination
https://nraoiekc.blogspot.com/2013/11/taiichi-ohno-on-industrial-engineering.html

Toyota Production System Industrial Engineering (TPS IE) Part 1


Toyota Production System - Main Objectives

Elimination of Waste
Low Inventory
Low Order to Delivery Period using low cycle time
.


Toyota Production System - Tools or Techniques


SMED
Poka Yoke

Now popular

TIE - Total Industrial Engineering.
TQM – Zero defects
TPM – High OEE
TPMgmt – Annual Planned Cost Reduction

Shigeo Shingo

A Study of Toyota Production System from an Industrial Engineering Viewpoint by Shigeo Shingo

Book published by Productivity Press

Two Pillars of TPS - Jidoka - JIT


Toyota Production System

A production system based on the philosophy of achieving the complete elimination of all waste in pursuit of the most efficient methods.
Toyota Motor Corporation's vehicle production system is a way of making things that is sometimes referred to as a "lean manufacturing system," or a "Just-in-Time (JIT) system," and has come to be well known and studied worldwide.

This production control system was established based on many years of continuous improvements, with the objective of making the vehicles ordered by customers in the quickest and most efficient way, in order to deliver the vehicles as swiftly as possible. The Toyota Production System (TPS) was established based on two concepts: "jidoka" (which can be loosely translated as "automation with a human touch"), as when a problem occurs, the equipment stops immediately, preventing defective products from being produced; and the "Just-in-Time" concept, in which each process produces only what is needed for the next process in a continuous flow.

Based on the basic philosophies of jidoka and Just-in-Time, TPS can efficiently and quickly produce vehicles of sound quality, one at a time, that fully satisfy customer requirements.


Shigeo Shingo said
80% of the TPS is waste elimination in facilities, processes and inventory, that is industrial engineering (facilities and processes improvement, Jidoka)),
15% - production management (production batch quantities planning, JIT material and production planning) and
5% - kanban (sign board) communications

What is Industrial Engineering?

Industrial Engineering is eliminating Muda, Muri and Mura (Japanese explanation).

IE is developing science that explains productivity (Productivity Science development)

IE is improving technical processes  for cost reduction (Machines and Men) (Fundamental - Productivity Engineering).

IE is improving management processes of planning, organizing, resourcing, executing (accepting and releasing orders, leading, directing, communicating) and controlling (associated activity - Productivity Management).

IE is improving business processes (Augmented).

For some more details visit:  Functions of Industrial Engineering



In Preface to the Japanese Edition

Shigeo Shingo had written that management consultants were not allowed to disclose any confidential or proprietary information. Taiichi Ohno authored two books describing Toyota Production System (TPS).  That allowed Shigeo Shingo, to use the published material as the basis to explain industrial engineering principles behind TPS.

Shigeo had as his objectives in writing the book:

1. Explaining the principles of the Toyota Production System based on Industrial Engineering Theory.
2. Explanation of the system of practicing these principles.
3. Description of the practical application of the methods following these principles.

Chapter 1 Introduction


Production is a network of processes and operations.
Process – transforming material into product is accomplished through a series of operations.
Process – flow of material in time and space.
Process analysis examines the flow of material or product.

In an operation a transformation occurs.
Process analysis questions whether that transformation is required.

Operation Analysis
Operation analysis examines the work performed on products by workers, machines and tools.
Process analysis, operation analysis, motion study and time study form part of methods efficiency engineering.
Process analysis and operation analysis are engineering activities specific to each branch of engineering.
http://nraoiekc.blogspot.in/2012/04/method-study-methods-efficiency.html

Shingo wrote "When we look at operations, we see the work performed to accomplish the transformation of the material - the interaction and flow of equipment and operators in time and space."

I keep insisting that after a process chart is made, for each operation in the process chart, the machine effort and human effort are to be recorded in detail. Motion study, provides two handed operator chart for recording work of every operator involved. For machine effort, for each machine a machine effort sheet has to be prepared to improve machine work.

Chapter 2 Improving Process

Improve process before improving individual operations.
Process is flow of material through operations.

Process Chart - Gilbreth

Processing operation
Inspection operation
Transport operation
Storage operation – Temporary, Permanent (Delay operation)

Process Improvement
Process can be improved in two ways.
The first improves the product itself through design efficiency engineering (value engineering, design for manufacture, design for assembly, and design optimization techniques).
The second improves manufacturing method through methods efficiency engineering, motion studies and production optimization and variability reduction methods.

ECR Method of Process Improvement

Eliminate the operation – sometimes it is found to be not necessary or sometimes it is due to improvement of earlier operation.
Combine operations with earlier one or latter one.
Rearrange the sequence of operations


Processing Operations Analysis

Examples in the book
Manufacturing operations can be improved by alternatives related to proper melting or forging temperatures, cutting speeds or tool selection.
Examples related to vacuum molding, plating and plastic resin drying are given in the book.
Eliminating Flashing in Castings (Die)
Flashing in die castings occurs due to escape of air.
Removing the air in mould with a vacuum pump eliminated flashing.
Removing Foam in High-Speed Plating
Spraying or showering the surface to be painted resulted in a 75% reduction.
Drying Plastic Resin
Letting the resin dry a little at a time by allowing it to float to the surface resulted in a 75% reduction of electric power consumption.


Analysis of Inspection Operations

Shingo said normal inspection is judgment inspection.
It separates good and defective items.
Rework done on defective items if possible
Informative inspection asks for process improvement.
It is like medical examination that leads to treatment.
Statistical Process Control
SPC is sampling based informative inspection.
But Shingo says even it is not sufficient to assure zero defects.
To assure zero defects we need to inspect every item but at low cost per item.
Shingo’s Suggestions
Informative Inspections

Self Inspection
Successive Inspection
Enhanced Self Inspection – Inspection enhanced with devices  - poka-yoke

Example 2.4 – Vacuum Cleaner Packing
Cleaner along with attachments and leaflets to be packed.
When a leaflet is taken from the pile,  a limit switch is operated.
When attachments are taken from the container, a limit switch is operated.
Then only, the full package is allowed to be sealed.
Principle
The purpose of inspection is prevention of the defect.
Quality can be assured when it is built in at the process and when inspection provides immediate and accurate feedback at the source to prevent the defective item to go further.
Self Inspection
It provides the most immediate feedback to the operator.
He can improve the process and also rework on the item.
Disadvantage inherent.
There is potential for lack of objectivity.
He may accept items that ought to be rejected.
Successive Inspection
The operator inspects the item for any defect in the previous operation before processing it.
Shingo says, when this was introduced defects dropped to 0.016% in Moriguchi Electric Company in television production
Inspection enhanced by Poka Yoke
Human operation and inspection can still make errors unintentionally.
Poka Yoke will take care of such errors.
Ex: Left and right covers are to be made from similar components with a hole in different places.
The press was fitted with a poka yoke which does right cover pressing only when the hole is in proper place.
Source Inspection
This is answering the question: What is the source of the defect in the process/operation?
Two types proposed.
Vertical
Horizontal
Source Inspection – Vertical, Horizontal
Vertical source inspection traces problems back through the process flow to identify and control conditions external to the operation that affect quality.
Horizontal source inspection identifies and controls conditions within an operation that affect quality.
Poka-yoke Inspection Methods
Poka-yoke achieves 100% inspection through mechanical or physical control.
Poka-yoke can either be used as a control or a warning.
As a control it stops the process so the problem can be corrected.
As a warning, a buzzer or flashing lamp alerts the worker to a problem that is occurring.

Three types of control poka-yoke
Contact method - identify defects by whether or not contact is established between the device and some feature of the product's shape or dimension
Fixed value method - determines whether a given number of movements have been made


Motion step method - determines whether the established steps or motions of a procedure are followed

Choosing/Designing  Poka Yoke
First decide stage of inspection – Self or Successive
Second – Type of regulation
Control or warning.
Third decide Error Sensing type – Contact, fixed number or motion step


Analysis of Transport Operations

Transport within the plant is a cost that does not add value.
Hence real improvement of the process eliminates the transport function as much as possible.
This involves improving the layout of process.

Ex – 7. Transport Improvement
Tokai Iron Works – process layout -  presses, bending machines, embossing
Layout Change: Flow based layout.
A 60 cm wide belt conveyor with ten presses on either side.
WIP reduced. Production time shortened. Delays disappeared.
200% increase in productivity.
Principle
Only after opportunities for layout improvement have been exhausted should the unavoidable transport work that remains be improved through mechanization.

Eliminating - Storage Operations (Delay)


Process Delay – Permanent storage – Whole lot is waiting
Lot Delays – Temporary storage – One item is being processed. Other items in the lot waiting.
Another classification is storage on the factory floor and storage in a controlled store.
Eliminating - Storage Operations (Delay)
There are three types of accumulations between processes:

E storage - resulting from unbalanced flow between processes  (engineering)
C storage - buffer or cushion stock to avoid delay in subsequent processes due to machine breakdowns or rejects (control)
S storage - safety stock; overproduction beyond what is required for current control purposes

Eliminating E-Storage

E-storage is due to engineering/planning/design of the production-distribution  system
This can be eliminated through leveling quantities, which refers to balancing flow between high and low capacity processes and synchronization.

Leveling would mean running high-capacity machines at less than 100% capacity, in order to match flow with lower capacity machines that are already running at 100% on short interval basis.
At Toyota, the quantity to be produced is determined solely by order requirements (Takt time).

Principle
Presence of high capacity machines should not be used to justify large lot processing and resulting inventory.
Process capacity should serve customer requirements/production requirements and should not determine them
synchronization.
The lots especially one piece lot is processed without delay in a flow.
It is efficient production scheduling that ensures that once quantities are leveled (output is matched), inventories do not pile at any stage due to scheduling conflicts.
Synchronize the entire process flow.


Eliminating C storage - Cushion

Cushion stocks compensate for:
machine breakdowns,
defective products,
downtime for tool and die changes and
sudden changes in production scheduling.

Eliminate Cushion Storage
Prevent machine breakdowns:
Determining the cause of machine failure at the time it occurs, even if it means shutting down the line temporarily.
Total Productive Maintenance movement.

Eliminate Cushion Storage
Zero Defect Movement.
Total quality management.
Use better inspection processes:
Self Inspection.
Successive Inspection.
Enhancement to inspection through Poka Yoke
Eliminate Cushion Storage
Eliminate Lengthy setups and tool changes
Implement SMED to eliminate long set-up times and tool changes
Running smaller batch sizes to allow for quick changes in production plans

Eliminate Cushion Storage
Absorb Change in Production Plan
Running smaller batch sizes allows for quick changes in production plans without disturbing flow production to significant extent.

Eliminating Safety (S) storage

Safety stock is kept not to take care of any predicted problem but to provide additional security
It may guard against delivery delays, scheduling errors, indefinite production schedules, etc.
Ex. 10 Delivery to stores
In example 2.10 Shingo mentions a company wherein vendors supply to store and from store components are supplied to assembly line.
Shingo suggested that vendors should directly supply the day’s requirements to assembly floor and in case of any problem, components in the store can be used.
Less Need for Safety Stock Observed
That practice led to the observation that very less safety stock is needed in the store.

Shingo recommends keeping a small controlled stock that is only used when the daily or hourly scheduled delivery fails or falls behind.
In case of unexpected defects also it can be used.


The safety stock can then be replenished when the scheduled materials arrive, but the supply of materials due for the process go directly to the line, rather than normally going into storage first.
This is the essence of the just-in-time supply method.


Eliminating lot delays
While lots are processed, the entire lot, except for the one piece being processed, is in storage (is idle).
The greatest reduction in production time can be achieved when transport lot sizes are reduced to just one; the piece that was just worked on.

SMED
Using SMED (single-minute exchange of dies), set up time is decreased so large lot sizes are no longer necessary to achieve machine operating efficiencies.
SMED facilitates one item lot sizes.




Layout Improvement - Flow
Transportation changes can be accomplished through flow  layout and using gravity feed Chutes which result in shorter production cycles and decreases in transport man-hours.

Reducing Cycle Time
Generally, semi-processed parts are held between processes 80% of the time in a production cycle time.
It quantity leveling is used and synchronization of flow is created, the cycle time can be reduced by 80%.
By shifting to small lot sizes will further reduce cycle time.


TPS – Reduction of Delays or Storage
Methods of reducing production time delays (JIT) is the foundation of Toyota Production System.
It clearly brings down production cycle time and thereby offers small order to delivery time.

Process Improvements in Toyota
Mixed model small lot production was attempted in Toyota to compete with American manufacturers.
First, inefficiencies in processing operations, inspection operations and transport operations were removed.
Then storage operations were attacked and inventories eliminated.
Toyota surpassed American manufacturers.

Now TPS is promoted as Lean System



Chapter 2 End

Ch. 3 Improving Operations

Operation may be classified as follows:

Set up operations - preparation
Principal operations - performance
Margin allowances - machine breaks
Personal allowances - worker breaks


Improving Setup
SMED

Improving principal operations
The easiest way to improve principal operations is to separate the worker from the machine.
Reduce involvement of man in machine running and production.
This involves the "one worker, many process" theory.
One worker attends 5-6 machines,
The principle is that cost reduction is more important than high machine operating rates.
Machines should not unnecessarily function and produce excess inventory.
But the operable time of the machine should be high.
Whenever needed machine must be ready for production.

Autonomation
Machine detects problem and stops.
Workers correct the problem.
The next step is to make the machine correct the problem

Improving margin allowances

Main operations are automated by marginal activities like removing chips, feeding materials and stocking products are still done by hand by men.
They also need to be automated.
Lubrication: Consider automatic lubrication, use of oil impregnated metals etc.
Cutting oil – Consider automatic oiling or cutting without oil.
Chip removal – Consider powdering chips or automatic lubrication and chip removal.

Workshop allowances

Automate the following:
Automate feeding for materials.
Automate product storage.
By adopting the SMED system, Toyota achieved dramatic reductions in setup time and inventory cost.
Adding multi-machine handling and autonomation further increased productivity.

Chapters 2 & 3 to be used in analysis of value stream map (VSM)

Toyota Production System Industrial Engineering (TPS IE) Part 2

Summary of Remaining Chapters of the Book

http://nraoiekc.blogspot.com/2013/12/toyota-production-system-industrial.html

Updated 11.7.2024,  11.9.2022,  16.2.2022,  11 July 2021,  14 June 2020,   21 August 2019,  22 August 2017,  9 Sep 2015
First published 9 Sep 2014

Friday, March 27, 2026

Lean Construction - The Toyota Industrial Engineering of Construction


Welcome to Lean Design & Construction!

Lean Construction Institute (LCI) is a non-profit organization, founded in 1997.
http://www.leanconstruction.org/
The Institute operates as a catalyst to transform the industry through lean project delivery using an operating system centered on a common language, fundamental principles, and basic practices. We have these broad goals:

Create Industry Demand for Lean
Grow and Sustain Members
Develop Lean Knowledge
Develop Lean Capacity
Develop Collaboration and Distribution Channels

Tact Planning in Construction




PhD Thesis 2019







2014
Lean Construction Institute - Chicago
Community of Practice Events
http://www.leanconstruction.org/communities/chicago/

2013
Institute of Lean Construction of Excellence (ILCE). India
Indian engineers, managers and industry leaders are aware of lean construction and taking steps to implement it.
ILCE was established in India in 2008 as a partnership between construction industry leaders and academia.  

Lean construction has  answers to complete projects early, get business benefits without compromising on clients’ satisfaction, according to Dr. Subhash Rastogi, Executive Chairman of BT&BT.


2012 Address in Lean Construction Institute Conference
________________

________________


Lean Construction Journal
http://www.leanconstruction.org/lcj/

AIMS

Published by the Lean Construction Institute since 2003, the Lean Construction Journal (LCJ) is an international refereed journal devoted to Lean Construction practice and research.


2004 paper
http://www.constructingexcellence.org.uk/pdf/fact_sheet/lean.pdf


1999
CONSIDERATIONS ON APPLICATION OF LEAN CONSTRUCTION PRINCIPLES TO
DESIGN MANAGEMENT
Patricia Tzortzopoulos1  and Carlos Torres Formoso2
Proceedings of IGLC 7
http://www.ce.berkeley.edu/~tommelein/IGLC-7/PDF/Tzortzopoulos%26Formoso.pdf




Ud. 27.3.2026
Pub. 10.9.2014

Sunday, March 22, 2026

Lean Product Development Resource Center


IISE


Trends and Future Research Direction of Lean Product Development
by Ivana Cukor Kirinić D andMiro Hegedić 
Department of Industrial Engineering, Faculty of Mechanical Engineering and Naval Architecture, University of Zagreb, 10000 Zagreb, Croatia
Sustainability 2023, 15(24), 16721; https://doi.org/10.3390/su152416721

Applying Lean to New Product Development
November 1, 2011
By Marc Hafer
CEO,
Simpler Consulting


Making the Transition to Lean Product Development
Rebentisch, Eric
A case study-based research effort will be discussed that is currently following one PD enterprise through its multi-year transition to more lean, high-performance PD, and understanding the steps along the way, as well as the organizational, management, and workforce issues that enable or inhibit that transition. These and other studies currently underway at LAI seek to expand our understanding of how PD system leaders might implement and benefit from lean principles and practices in their PD systems.
Date issued
2009-01-21


Over 100 Knowledge Briefs - short articles that drill into one aspect of lean product development, written in the form of Knowledge Capture A3 Reports. These articles make the best available knowledge about lean product development accessible, actionable and easy to read.

http://leantechnologydevelopment.com/  - Not working now.


Ud. 22.3.2026
Pub. 8.3.2014





Sunday, March 15, 2026

Seven Wastes Model of Taiichi Ohno and Flow Process Chart - Industrial Engineering

Waste Elimination is part of industrial engineering since the discipline began. Waste elimination is part of productivity improvement. Productivity of inputs will increase when their waste is eliminated.

Taiichi Ohno in Toyota Industrial Engineering practice, has identified certain types of waste for particular attention and doubled the productivity of Toyota in comparison to US companies of that day. Thus best practices of tackling these 7 wastes were developed in the Toyota Motors. Shigeo Shingo of JMA was a teacher and consultant to Toyota in this endeavor.

In strategic management text of Thompson and Strickland, best practices implementation in value chain activities is an important step in strategy execution process. Companies world over are trying implement waste elimination practices developed in Toyota in their companies.

Seven Wastes - Taiichi Ohno - page 19 - Toyota Production System


   Waste                          -                   Methods to prevent it.

Waste of overproduction - One cannot produce without a production Kanban. Managing demand 
                                           variability. Reducing time between order receipt and starting of production.

Waste of time on hand (waiting)  - Multiple machines to an operator, all producing as per tact time.

Waste in transportation - Machines in line or flow placed close together

Waste of processing itself - Standardized Methods (plan the process well - process planning)

Waste of stock on hand (inventories) - JIT system - low inventory - SMED - Poka-Yoke

Waste of movement (of workers) - Machine layout changes so that an operator handling multiple machines does not waste movement. Can there be control unit for all the machines at one place only?

Waste of making defective products - Problem solving approach to produce zero defects. 5 Why approach to find where the problem or defect occurred in the earliest stage. Educating and training operators by other team members and management.



Seven Waste Model is also expressed as TIMWOOD

T – Transport – Movement of material, people
I – Inventory – Stock of materials, parts, and finished items
M – Motion – movement of hands and other body parts in operating machines of hand tools
W – Waiting – Men and machines waiting for parts or instructions
O – Over production – Making more than is IMMEDIATELY required
O – Over processing – Tighter tolerances or higher grade materials than are necessary
D – Defects – Items scrapped and rework


Compare the seven waste model with flow process chart


Flow process chart recommends recording and examining 5 items.

Process -   will examine  1.Waste of processing itself,  2. Waste of overproduction

Inspection -  3. Waste of making defective products  - The inspection is only shown as a stage in flow process chart, It needs to be augmented with a record of defects or defectives found during inspection.

Transport - 4. Waste in transportation, 5. Waste of movement (of workers)

Temporary delay - 6. Waste of time on hand (waiting)

Permanent storage - 7. Waste of stock on hand (inventories)

Thus we can see, flow process charts has provided the foundation for analyzing the seven wastes proposed by Taiichi Ohno.

But subsequent persons have indicated Eighth Waste.

Wastage of physical and mental skills of people.

Alan Mogensen identfied this gap in industrial engineering theory and introduced work simplication workshops to involve operators and supervisors in productivity improvement. Subsequently, suggestions scheme became popular. Japanese managers brought more improvements and made operators given large number of suggestions and provided forums for participation.

Please think over this statement of Taylor.

Respect for People - F.W.Taylor -  The Principles of Scientific Management.
Under scientific management the "initiative" of the workmen (their ingenuity) is obtained ...  to a greater extent than is possible under the old system; and in addition to this improvement on the part of the men, the managers assume ... new duties. 



Narayana Rao proposed Ninth waste.

9th Waste - Wastage of Machine Potential, Capability and Power - Wasting Machine's Potential Productivity

Industrial engineering has ignored wastage of potential of machines and equipment even though Taylor has advocated right from his piece rate system paper that for productivity improvement both machine and man are to be analyzed and improved.

Wastage of potential of the machine is recognized in the OEE calculation. Still IEs are yet to develop the area.

9th Waste - Wasting Machine's Potential Productivity -- Elimination - Essential Industrial Engineering Activity


An Interesting exchange of LinkedIn comments regarding Overprocessing


Basant Pandole
Production Engineer | Injection Moulding Specialist | Manufacturing Excellence | Lean Six Sigma | Team Leadership As a Production Engineer at Ganesh Gouri Industries Pvt Ltd, I bring extensive expertise in inj. moulding




In modern manufacturing, data-driven decisions and process efficiency play a critical role in achieving operational excellence.

Process Cycle Efficiency (PCE) = [value-added time/total lead time]*100 

My comment

So is reducing value added time a bad thing?



Reply by Shahrukh Irani
I help any high-mix low-volume (HMLV) manufacturer customize their implementation of Lean

Good point Professor. Reducing VAT corresponds to reduction of the waste of over-processing (one of O's in TIMWOODS). 

Reply be me.
Shahrukh Irani,   Thank you professor - Each processing operation is subjected the question - eliminate? If the processing is required it is to be simplified - means machine time reduction and man time reduction are to be attempted. I have written these two points in a post of mine.

Waste of processing itself - Standardized Methods (plan the process well - process planning)

Over processing in TIMWOODS - O – Over processing – Tighter tolerances or higher grade materials than are necessary.

Seven Wastes Model of Taiichi Ohno and Flow Process Chart - Industrial Engineering
https://nraoiekc.blogspot.com/2013/01/chapter-seven-wastes-model-2013-edition.html


Reply by Basant Pandole


Narayana Rao KVSS,  Great question. In Lean, the goal isn’t to reduce value-added work but to eliminate waste around it so the process flows faster and the ratio of value-added time within total lead time improves.

Reply be me.

Basant Pandole,  Lean is also under criticism. Most of the operations management books now say Lean and TQM are not delivering results as promised and hyped. Totally neglecting value added operations and focusing remaining activities was beneficial for Toyota at that time because Ohno said their value adding steps are no worse than American competitors. So they are creating waste or unnecessary expenditures in other activities. The lean brigade simply generalises it to all companies and in all countries and at all times.

I support Shahrukh Irani's explanation and thank him.



Bibliography

Seven Wastes
http://accountability.wa.gov/leadership/lean/documents/2012_Lean_Conference/Thinking_Tools_Techniques/24/The%207%20Wastes.pdf

Seven Wastes Tool
http://www.gcu.ac.uk/media/gcalwebv2/theuniversity/supportservices/pace/documents/Seven%20Wastes.pdf

Lean for Government: Eliminating the seven wastes
http://ntrs.nasa.gov/search.jsp?R=20120016881

Lean in Government
http://www.epa.gov/lean/government/

Seven Wastes in Preventive Maintenanee Programs
http://www.techcorr.com/news/Articles/Article.cfm?ID=2450


Updated 15.3.2026, 25.3.2022, 18.10.2021, 23 August 2017, 15 November 2013


Sunday, December 7, 2025

Lean - Losers and Winners

 


More and more LinkedIn posts keep appearing that talk of failure of lean implementations.


70% try.

24% see meaningful results

2% achieve full results.

See for more details


https://www.linkedin.com/feed/update/urn:li:activity:7403225589375291392/














Friday, August 22, 2025

Knowledge for Becoming a Lean Enterprise

Interesting topic. To be updated.


9.3.2014
Top misconceptions of the Lean movement, according to founder Jim Womack
http://business.financialpost.com/2013/10/24/top-misconceptions-of-the-lean-movement-according-to-founder-jim-womack/

MIT 16.660 / 16.853 / ESD.62J Introduction to Lean Six Sigma Methods



7.3.2014
Lean Leadership – Fundamental Principles and their Application
U. Dombrowski, T. Mielke
Procedia CIRP
Volume 7, 2013, Pages 569–574
Forty Sixth CIRP Conference on Manufacturing Systems 2013

Hoshin Kanri - Policy Deployment or Implementation - Customer Focus, Aligned goals on levels.
Importance of Gemba - Shop Floor or Work Place - Shop floor based management - Decisions based on first hand knowledge
Qualification - Long Term Development of Employees - Continuous learning
Improvement Culture - Striving to perfection, Accepting  failure as a possibility to improve
Self Development of the Leader - Lean leaders are role models - New leadership skills are necessary and they have to acquire them

6.3.2014
9 Ways Leaders' Actions Can Sustain Lean Progress

There is a possibility that the momentum gained during the implementation phase of lean manufacturing become slack subsequently. If managers adhere to the twin objectives of effectiveness and efficiency every day this does not happen. But, we have a long period in the history of modern management (1895-2013), wherein productivity and efficiency improvement has not gone in parallel with product and service innovation to increase customer satisfaction. The Toyota managers brought out the importance of efficiency, a fact first advocated by F.W. Taylor in a dramatic fashion and now the productivity movement has taken the name lean thinking or lean management. Joe Panebianco and Mike Noonan, consultants of TBM Consulting Group suggest the following nine steps by leaders to keep the organization do continuous improvement.

1. Communicate the vision: This needs to be done managers periodically. They have to communicate long term and medium term and short term goals to their team. Productivity, efficiency and cost reduction goals also have to be part of the company plans.
2. Always update standard work: Toyota management lays great stress on standard work process which is the theme of industrial engineering basically. Every process must have a standard procedure. Managers have to make sure that standard procedures are visually available. Of course, continuous improvement demands that the processes are improved every month.
3.Go on Gemba walks: Gemba refers to the work place. Managers have to go on work place improvement walks to find opportunities for improvement. Standard Maintenance walks are different from improvement walks.
4. Build a Continuous Improvement Culture:
5. Foster a respectful, team driven organization - Team working to complete the flow operation is essential.  Respect for the people is essentially emphasized in the Toyota system. Toyota system says the same thing as Gilbreth said. The operator must first use the standard procedure and them come up with suggestions to improve it. But once Toyota's practice is a great example.
6. Continue to motivate employees.
7. Maintain regular training: Keep updating knowledge about both product innnovation and process innovation in the organization.
8. Reinforce Performance and Progress with Metrics and Visual Management Tools.
9. Post Continuous Improvement Score Cards
TBMCG Management Briefing March 2013





5.3.2014
Leaning Lean: Don't Implement Lean, Become Lean
Michael Balle and Peter Handlinger
Reflections, Vol 12, Number 1, Pp.17-31.

Toyota, the inventor of lean, never sought to implement lean per se, it strives to become leaner every day. Actually in terms of Taiichi Ohno it becomes more productive every day, or reduces waste every day or reduces the cost of creating value for the customer every day.

Four lessons for the leaders given by the authors
1. Lean is a system of related learning activities
2. Performance is driven by people, not systems.
3. Learning must occur on the Job everyday for everybody
4. The organization's design must support on-the-job learning

Toyota has reinvented job by changing:

JOB  =  WORK   to
JOB = WORK + KAIZEN or WORK + PROCESS IMPROVEMENT


Ud. 22.8.2025
Pub. 7.3.2014

Tuesday, June 3, 2025

Toyota Motors - Industrial Engineering - Result Toyota Production System - Taiichi Ohno Books

 Taiichi Ohno Book - Toyota Production System


Quotes from Above.


Japanese businesses carefully studied industrial engineering (IE), a company-wide manufacturing technology directly tied to management that was developed and applied in the United States.


When first introduced, it was pointed out that the Toyota production system was method engineering (ME), not IE.


TPS is Industrial Engineering System of Toyota Motors.

IE is a system and the Toyota production system may be regarded as Toyota style IE.


Toyota style IE is mekeru or profitmaking IE, known as MIE. 
Unless IE results in cost reductions and profit increases, I think it is meaningless.


Essentially, an industrial engineer studies systematic approaches to improvements.


It is my wish that the Toyota production system born and raised at Toyota Motor Company be comparable or superior to the American IE's business management and manufacturing system.


Industrial engineering (IE), a company-wide manufacturing technology directly tied to management that was developed and applied in the United States.

We are very happy that the Toyota production system has become, as I intended, a company-wide manufacturing technology directly tied to management.

--------------------------------


Industrial Engineering Theory and Practice is the foundation for development of Toyota Production Sysem. Taiichi Ohno, the engineering manager responsible for complete development of TPS clearly stated the importance of industrial engineering.

Advocating Profit-Making Industrial Engineering  



After World War II, in the world of industry, America was, without dispute, the leader. Catching up with and surpassing America was not a job to be done in a day. To catch up, the shortest route was to buy advanced American technology. So, aggressive Japanese businesses imported and adopted America's high-level production and manufacturing technology. In academia and business, a great number of American business management techniques were also studied and discussed. In that endeavor, Japanese businesses carefully studied industrial engineering (IE), a company-wide manufacturing technology directly tied to management that was developed and applied in the United States.

Defining industrial engineering seems to be fairly difficult. When first introduced, it was pointed out that the Toyota production system was method engineering (ME), not IE. 

To me, IE is not a partial production technology but rather a total manufacturing technology reaching the whole business organization. In other words, IE is a system and the Toyota production system may be regarded as Toyotastyle IE.

What is the difference between traditional IE and the Toyota system? 

In brief, Toyotastyle IE is mokeru or profitmaking IE, known as MIE. Unless IE results in cost reductions and profit increases, I think it is meaningless. In Toyota, industrial engineering is done to register a decreased in cost and increase in profit of the enterprise.

There are various definitions of IE. A former head of the American Steel Workers' Union defined its function as that of entering a plant to improve methods and procedures and to reduce costs. And this is exactly so.

"IE is the use of techniques and systems to improve the method of manufacturing. In scope it: ranges from work simplification to large-scale capital investment plans."'

"IE has two meanings. One aims at improving work methods in the plant or in a particular work activity. The other one means the specialized study of time and action. However, this is the work of a technician. Essentially, an industrial engineer studies systematic approaches to improvements. "

I would like to add a definition from the Society for Advancement of Management (SAM), an organization that succeeded the Taylor Society:

Industrial engineering applies engineering knowledge and techniques for the study, improvement, planning, and iniplementation of the following:

1. method and system,

2. qualitative and quantitative planning and various standards including the various procedures in the organization of work,

3. measuring actual results under the standards and taking suitable actions.


This is all done to exercise better management with special consideration for employee welfare, and it does not restrict business to lowering the cost of improved products and services.'

I have listed various IE definitions, each saying good things, because they are useful references. However, in private business, implementing IE effectively is not easy.

I call Toyota's industrial engineering profitmaking IE and it is my wish that the Toyota production system born and raised at Toyota Motor Company be comparable or superior to the American IE's business management and manufacturing system.

We are very happy that the Toyota production system has become, as I intended, a company-wide manufacturing technology directly tied to management. And, fortunately, it is extending to the outside cooperating firms as well.

In the book, Ohno spent considerable space to explain what is IE and how it is being made use of in Toyota Motors to identify and reduce waste and decrease cost and increase profit.

Toyota used all theories and practices of industrial engineering in its cost reduction effort. But its innovations standout as pillars. They are unique to Toyota and from their use at Toyota only, they spread to others companies.


Cost Reduction through Productivity Improvement - Objective and Slogan of Industrial Engineering.


Productivity Improvement through Waste Elimination - Means and Slogan of Toyota Industrial Engineering (TPS).


The themes presented in the first three chapters


1. Starting from Need - Page 24


► "Catch Up with America"

► Just-In-Time

► Using a Common-Sense Idea

► Give the Machine Intelligence

► The Power of Individual Skill and Teamwork

► Cost Reduction Is the Goal

► The Illusion of Japanese Industry

► Establishing a Production Flow

► Production Leveling

► In the Beginning, There Was Need

► A Revolution in Consciousness Is Indispensable    


2. Evolution of the Toyota Production System


Repeating Why Five Times

► Complete Analysis of Waste

► My Plant-First Principle

► Writing the Standard Work Sheet Yourself

► Teamwork Is Everything

► The Skill of Passing the Baton

► An Idea from the U. S. Supermarket

► What Is Kanban?

► Incorrect Use Causes Problems

► Establishing the Flow Is the Basic Condition

► Use Your Authority to Encourage Them

► Mountains Should Be Low and Valleys Should Be

Shallow

► Challenge to Production Leveling

► Production Leveling and Market Diversification

► Kanban Accelerates Improvements

► Carrying Carts as Kanban

► The Elastic Nature of Kanban


Chapter 3 . Further Development 


An Autonomic Nervous System in the Business Organization


► Provide Necessary Information When Needed

► The Toyota-Style Information System

► Fine Adjustment

► Coping with Changes

► What Is True Economy?

► Re-Examining the Wrongs of Waste

► Generate Excess Capacity

► The Significance of Understanding

► Utilizing the Full Work System

► Do Not Make a False Show

► Required Numbers Are All-Important

► The Tortoise and the Hare

► Take Good Care of Old Equipment

► Look Straight at the Reality

► 0. 1 Worker Is Still One Worker

► Management by Ninjutsu

► In an Art Form, Action Is Required

► Advocating ProfitMaking Industrial Engineering

► Surviving the Slow-Growth Economy



I. Starting From Need

► "Catch Up with America"



The Toyota production system evolved out of need. Certain restrictions in the marketplace required the production of small quantities of many varieties under conditions of low demand, a fate the Japanese automobile industry had faced in the postwar period. These restrictions served as a touchstone to test whether Japanese car manufacturers could establish themselves and survive in competition with the mass production and mass sales systems of an industry already established in Europe and the United States.

All kinds of wastes occur when we try to produce the same product in large, homogeneous quantities. In the end, costs rise. It is much more economical to make each item one at a time. The former method is the Ford production system and the latter is the Toyota production system.

We kept reminding ourselves, however, that careless imitation of the American system could be dangerous. Making many models in small numbers cheaply -wasn't this some thing we could develop? And we kept thinking that a Japanese production system like this might even surpass the conventional mass production system. Thus, the principal objective of the Toyota production system was to produce many models in small quantities.

America has generated wonderful production management techniques, business management techniques such as quality control (QC) and total quality control (TQC), and industrial engineering (IE) methods. Japan imported these ideas and put them into practice. The Japanese should never forget that these techniques were born in America and generated by American
efforts.


15 August 1945 . Japan lost the war. Toyoda Kiichiro, President of the Toyota Motor Company said, "Catch up with America in three years. Otherwise, the automobile industry of Japan will not survive"


President Toyoda was saying that we should catch up in three years, but it would be very difficult to raise productivity by eight or nine times in such a time period to equal labor productivity of US.. It meant that a job then being done by 100 workers had to be done by 10 workers.  But could an American really exert ten times more physical effort to give more productivity? Not, possible.  Surely, in  Japanese systems, we are wasting something (not using right equipment, right way of using equipment etc.) If we could eliminate the waste, productivity should rise by a factor of ten. This idea marked the start of the present Toyota production system. Waste elimination became a dominant objective and slogan.


Cost Reduction is the Goal


Frequently we use the word "efficiency" when talking about production, management, and business. "Efficiency" means cost reduction. At Toyota, profit can be obtained only by reducing costs.  We cannot set prices based on our costs.  Consumer sets the price and if the manufacturer sets a higher price due to his high manufacturing cost, the consumer will simply turn away. Cost reduction has to be the goal of manufacturers. The management has to develop human resources ability to its fullest capacity to best enhance creativity, and fruitfulness, to utilize facilities and machines well, and to eliminate all waste.


Cost Reduction through Productivity Improvement - Objective and Slogan of Industrial Engineering.


Productivity Improvement through Waste Elimination - Means and Slogan of Toyota Industrial Engineering (TPS).




Developments in Toyota Motors in the Initial Years

Restatement in chronological order  (Under Progress)



In 1911, Toyoda Sakichi toured Europe and the United States. Prior to that, under adverse and complicated circumstances, he quit the Toyoda Spinning and Weaving Company. But in America, when he saw the Northrop and Ideal System automatic loons, deemed the period's outstanding achievements, he recognized the superiority of his own inventions. Thus, after traveling abroad, he reestablished himself and again demonstrated his unyielding spirit.

At that time in America, he also saw cars. He decided at once to go into automobile manufacturing after the automatic loom. In his mind, his looms and the automobile were strongly connected.


Toyoda Sakichi's mission in life, business, and the world was to cultivate and train the natural intellect of the Japanese people, sell original Japanese products produced by this intellect, and increase the national wealth of Japan.


Before his involvement with automobiles, Toyoda Kiichiro worked with weaving machines. In the early days, Toyoda Kiichiro worked busily at Toyoda Sakichi's feet developing and commercializing the automatic looms, selling them to foreign businesses, and negotiating contracts, and so forth.

Although interested in automobiles from the start, it was perhaps during his tour of Europe and America in 1930, when he went to England to negotiate with Platt Brothers, that he was most strongly influenced. New York especially must have shocked him with its flood of cars.

When Toyoda Kiichiro returned home,  Toyoda Sakichi instructed him to spend the Y I million from Platt Brothers on automobile research, an amazing act of courage and foresight. Toyoda Kiichiro must have been filled with  a sense of responsibility when he received the instructions.


In 1933, Toyoda Kiichiro announced the goal to develop domestically produced cars for the general public:


"We shall learn production techniques from the American method of mass production. But we will not copy it as is. We shall use our own research and creativity to develop a production method that suits our own country's situation."


I believe this was the origin of Toyoda Kiichiro's idea of just-in-time.


Toyoda Kiichiro had to narrow the gap between the Japanese and American automobile industries and create a domestic production system, he had to explore ways to learn the basic technology, master the different production technologies, organize the production system, and find a uniquely Japanese production technology.


Toyoda Kiichiro recognized that the market always demands reasonably priced products. Today's problem, however, is that, regardless of how good a car we make, it will mean nothing unless we make it economically. This problem eventually relates to price. 


Toyoda Kiichiro must have clearly envisioned Justin-time as the first step in the evolution of a Japanese production system. It is, in fact, the starting point of the Toyota production system, constituting its skeletal structure.



Pursuit of a Japanese-Style Production Technique

Toyoda Kiichiro's mission, while laying the foundation of the automobile business, was to develop a Japanese production technique. This required intelligence.


► Toyotaism with a Scientific and Rational Nature

"Toyotaism" was established by Toyoda Kiichiro. He placed the following conditions on the automobile business:

• To provide cars for the general public

• To perfect the passenger car industry

• To make reasonably priced cars

• To recognize the importance of sales in manufacturing

• To establish the basic material industry

Toyoda Kiichiro wrote an article, published in September 1936, entitled "Toyota to the Present" that provides a good description of Toyotaism. In the following excerpt, he makes some provocative points:


At last, Toyota cars are out on the market. The cars were born from the intense research of numerous people, a synthesis of ideas from different fields, and from dedicated efforts and countless failures over a long period of time.


We started work early on engine design and research. Most preparation was finished in 1933, and on September 1,  we formally became an automobile production company


Since formally deciding to go into car manufacturing, what have we done? ... I will describe some of our preparations of the past three years.


Is it even possible for Japan to make the materials required?  Professor Honda Kotaro said that, at present, Japan did have the capability and that there was no need to hire foreigners. Greatly relieved, I immediately set out to build a steel mill.


Some visitors to our company ask what percentage of our cast products pass the quality test. To sustain the business, 95 percent must pass. We failed many times before successfully blowing cylinders into the dies using die presses with a pass ratio of over 90 percent. We eventually succeeded.

After making 1,000 pieces of an item, most workers become fairly skilled and defect-free. But the first several 100 pieces will contain some good and some bad. Until skills are established, we have to be prepared to discard anything borderline. This is how materials problems are satisfactorily solved.


In 1933, Toyoda Kiichiro announced the goal to develop domestically produced cars for the general public:


"We shall learn production techniques from the American method of mass production. But we will not copy it as is. We shall use our own research and creativity to develop a production method that suits our own country's situation."



Toyoda Kiichiro once told Toyoda Eiji that the best way to work in an automobile assembly plant would to have all parts for assembly at side of the line just in time for their use. The words "just-in-time" attracted many managers of Toyota and Ohno was also attracted by those words.


Evolution of the Production System in Toyota Based on Japanese Thinking and American Thinking -Toyota Production System


Cost Reduction is the Goal


Frequently we use the word "efficiency" when talking about production, management, and business. "Efficiency" means cost reduction. At Toyota, profit can be obtained only by reducing costs.  We cannot set prices based on our costs.  Consumer sets the price and if the manufacturer sets a higher price due to his high manufacturing cost, the consumer will simply turn away. Cost reduction has to be the goal of manufacturers. The management has to develop human resources ability to its fullest capacity to best enhance creativity, and fruitfulness, to utilize facilities and machines well, and to eliminate all waste.

The evolution of the production system in Toyota right from the beginning was guided two special ideas termed  as pillars by Ohno. One is JIT and the other is Autonomation.

Idea of production flow in reverse:


A later process goes to an earlier process to pick up only the right part in the quantity needed at the exact time needed. It will indicate what and how many are needed when they come next. 


We will call this means of indication kanhan (sign board) and circulate it between each of the processes to control the amount of production - that is, the amount needed. This was the beginning of the idea.

We experimented with this and finally decided on a system. The final assembly line is taken as the starting point. On this basis, the production plan, indicating the desired types of cars with their quantity and due date, goes to the final assembly line. To supply parts used in assembly, a later process goes to an earlier process to withdraw only the number of parts needed when they are needed. In this reverse way, the manufacturing process goes from finished product back to the earliest materialsforming department.


1945 - JIT - Just in Time was identified as the need. Every body was thinking how to do it. Ohno is also a manager thinking about it.


1945 - 71 - Setup Time Reduction

1945 - 55 -  Set ups on Die Presses were taking 2 to 3 hours.

1962 - Main plant set up 15 minutes

1971 - Main plant and Motomachi setups 3 minutes.


Supply of Parts and Withdrawal - Warehousing

1948 - Withdrawal by subsequent processes started. - Pull

1949 - Intermediate warehouses abolished

1953 - Supermarket system in machine shop

1958 - Warehouse withdrawal slips abolished


----------------------------

Summary of What Taiichi Ohno Shared in His Book


I. Starting From Need


During the 15-year period beginning in 1959-1960, Japan experienced unusually rapid economic growth. As a result, mass production, American style, was still used effectively in many areas.

We kept reminding ourselves, however, that careless imitation of the American system could be dangerous. Making many models in small numbers cheaply -wasn't this some thing we could develop? And we kept thinking that a Japanese production system like this might even surpass the conventional mass production system. Thus, the principal objective of the Toyota production system was to
produce many models in small quantities.

"Catch Up With America" Toyoda Kiichiro (1894-1952)


15 August 1945 . Japan lost the war. Toyoda Kiichiro, President of theToyota Motor Company said, "Catch up with America in three years. Otherwise, the automobile industry of Japan will not survive"


Just-In-Time


The basis of the Toyota production system is the absolute elimination of waste. The two pillars needed to support the system are:

Just in time
Autonomation - Intelligent machine that does not produce defect and also stops on it own. Also intelligent operator that do not produce defective parts and investigate and remove the root cause whenever a defective part is produced.

Just in time system eliminates one of the seven wastes specified by Ohno. In an assembly flow process, the right parts needed reach the appropriate place at the time they are needed, inventories can be reduced drastically even up to zero. But to reach the JIT ideal, many existing conventional management methods have to be changed.

Using a Common-Sense Idea

The common sense idea is making only those components demanded or used by the downstream process.

Ohno said, I am fond of thinking about a problem over and over.  The normal planning and production process is for the component producer to produce as per plan and keep it inventory for the assembly department to draw when needed. But Ohno changed this method. Assembly department will go and take what they want and component department has to replenish that component only. So component department has no independent plan. Only assembly department has the plan. Every link in the production flow process or chain is connected with this method and synchronized. With this practice, the management work force is reduced drastically. This information system is given the name kanban.

Give the Machine Intelligence


At Toyota,  machines automated along with an automatic stopping device in case of a problem
 are utilized. In this way, human intelligence is given to machines. The machine stops in case of a problem and the management will come to know of it. Expanding the rule, even operators are asked to stop the flow, if there is a problem. Rapid counter measures are taken to prevent recurrence of a problem.

The Power of Individual Skill and Teamwork


A champion team must have good teamwork and people with individual skill. Likewise autonomation is individual machine skill and JIT is teamwork.

Cost Reduction is the Goal


Frequently we use the word "efficiency" when talking about production, management, and business. "Efficiency" means cost reduction. At Toyota, profit can be obtained only by reducing costs.  We cannot set prices based on our costs.  Consumer sets the price and if the manufacturer sets a higher price due to his high manufacturing cost, the consumer will simply turn away. Cost reduction has to be the goal of manufacturers. The management has to develop human resources ability to its fullest capacity to best enhance creativity, and fruitfulness, to utilize facilities and machines well, and to eliminate all waste.

The Illusion of Japanese Industry


Japanese industry believed in mass production. Till 1973 oil crisis, Japanese manufacturers had the illusion that this system fits their needs


Establishing a Production Flow


Establishing production flow in machine shop was difficult. But in 1947, Ohno arranged machines in a flow order and tried having one worker operate three or four machines (different machines). Even though working time did not go up, operators did not like the new system. Also Ohno wrote, that many adjustments that an operator has to make to machine created difficulties for the operators.  Hence, Ohno said he became patient to implement the system even though he was convinced that the direction was right.

Production Leveling


We got the idea that we should spread production evenly throughout the workday.  We wanted to get away from having to produce everything around the end of the month.

In the Beginning There was Need.


The key to progress in production improvement, I feel, is letting the plant people feel the need.
Opportunities to take care of the needs are always there. Once a need if felt, we just have to drive ourselves to find the practical opportunities that satisfy the needs.

A Revolution in Consciousness Is Indispensable


A person in business may feel uneasy about survival in this competitive society without keeping some inventories of raw materials, work-in-progress, and products. But Ohno says a revolution in consciousness is needed to realize that overproduction and the consequent inventory is a waste that has to be eliminated rather than accumulated.

2. Evolution of the Toyota Production System


Repeating Why Five Times


By asking why five times and answering it each time, we can get to the real cause of the problem, which is often behind behind more visible symptoms.

May be we can interpret it as  prevention - appraisal - failure model. We see failure. We need to know ways to prevent the event very early in the event sequence.

Complete Analysis of Wastes


Improving efficiency makes sense only when it is tied to cost reduction. The efficiency of each operator has to be improved, each production line has to be improved and efficiency of the entire plant has to be improved due to them.

       Waste of overproduction
       Waste of time on hand (waiting)
       Waste in transportation
       Waste in processing itself
       Waste of stock on hand (inventory)
       Waste of Movement
       Waste of making defective products

Ohno made the statement that eliminating these seven wastes completely can improve the operating efficiency by a large margin. To eliminate these wastes, we must make only the quantity needed, thereby releasing extra manpower. Management has to identify excess manpower and utilize it effectively in other activities. Eliminating wasteful and meaningless jobs and creating useful jobs enhances the value of work for workers.


My Plant-First Principle


A proper work procedure cannot be written from a desk. It must be tried and revised many times in the production plant. Production managers have to be in the plant which is a major source of information.

Writing the Standard Work Sheet Yourself


Standard work sheet is basis for all improvements in Toyota production system. Improving machining processes, improving tools, improving transportation processes, and optimizing the inventory, rearranging machines, all such things are implemented through standard work sheets only. The job of the field supervisor, section chief or group foreman is to train workers in standard work. The trainer must actually take the hand of the worker and teach them. Workers of a team also help their team members.

Teamwork is Everything


Team work is essential in manufacturing also like many of the sports. Assigning responsibility to individuals is not sufficient. Teamwork is essential.

The Skill of Passing the Baton
The work area is like track relay. There is a wide area in which baton can be passed.
       Mutual Assistance Campaign

An Idea from the U.S. Supermarket


The communication system of Toyota is Kanban and Ohno got the idea for it from watching the transactions in Supermarkets of USA. At supermarkets buyers buy what they need.  Supermarkets have to facilitate it.

The idea of supermarket was implemented in Toyota and to avoid a situation wherein large quantity of a component is demanded suddenly, production leveling was also introduced.

What is Kanban?


         Kanban is a method for communicating production and use related messages among the plant personnel. Its most frequently used form is a piece of paper contained in a rectangular vinyl envelope. It contains 1. pickup information 2. transfer information and production information.  The kanban method is used for information flow vertically and laterally within Toyota itself and between Toyota and its supply partners.

Kanban is autonomic nerve of the production line.

(The word Kanban literally means visible record).

Incorrect Use of Kanban Causes Problems


Incorrect use of Kanban system causes problems. Close supervision of the kanban rules is required to derive best results from it.

1. An assembly process (more generally later process) can pick up items only in the quantity specified in the kanban from the earlier process. So the quantity the assembly process can pick up at a time is specified in the kanban system.
2. Earlier processes produce items in the quantity specified in the kanban which is provided by the later process after withdrawing the item from stocks of earlier process.
3. No items are withdrawn or transported or produced without a kanban indicating it.
4. All items have to move with an attached kanban.
5. Defective items cannot be sent ahead from any processing station. The assembly line can be stopped if there are no defect-free components or assembly in process. But a defective item cannot move forward.
6. Reducing the batch quantities indicated in the Kanban would make the system more sensitive and makes the system more synchronized.



The Talent and Courage to Rethink What We Call Common Sense


Productivity improvement ideas may come but implementing them requires understanding by top management. The ideas when they defy the present conventional thinking or common sense, requires much more understanding the by the top management and the greater the commitment of top management, the more successful will be the implementation.

Ohno wrote that he came up with many revolutionary ideas and implemented them. They were sometimes regarded as high handed. But Toyota's top management watched the situation quietly and allowed Ohno to implement them.

In 1963 only JIT was extended to outside suppliers. Till that only internal production was handled on JIT basis.

Establishing the Flow is the Basic Condition


Toyota helped its suppliers or cooperating firms to set up flow systems first. Then Kanban system was introduced.

Kanban is the communication tool for implementing or realizing JIT. This tool works well when all the supporting processes are flow processes. So flow process is a basic condition for realizing JIT through Kanban communication system.  The other important conditions are levelled production (eliminating surprise withdrawals of components) and working using standard work methods

Use Your Authority to Encourage Them,


Ohno said his ideas were not understood and hence not used initially by many. But he applied them in his department and when he was given more departments to manage, or was shifted to other departments, he implemented them there also, till Kanban became a company wide practice.

Mountains Should be Low and Valleys Should be Shallow


There must be efforts to level the production during the year. The mountains should be low and valleys should be shallow as much as possible and sales department has to strive for more uniform sales.

Challenge to Production Leveling


TPS works for production leveling during the year, the month and even a day. If 250 sedans, 125 hardtops, and 125 wagons are made daily, in assembly there are done in the sequence One sedan, one hard top, one sedan and then wagon etc. That gives a lot size of one. But lot size of one was not achieved overnight in various shops. In a die-press, in 1940 changing the die took to two or three hours. With such a die changing time, one cannot make small lots. So a decision was taken to make efforts to decrease the die changing times. During 1950s, the die change time went down to one hour. Then it was further reduced to 15 minutes. By late 1960s, the die changing time was drastically reduced to 3 minutes.

The challenge to production leveling and small lots was high set up times. The need for quick die changes was generated or identified and steps were taken to understand the issue and develop a solution.  This problem was not attempted earlier. To do this, initial solutions were developed and the workers were trained. But subsequently, the enthusiasm spread and everybody chipped in with suggestions and method improved beyond the initial description. The system became the product of the effort of large number of people.

Product Leveling and Market Diversification


Ohno emphasized that production leveling (small batch quantity) is much more advantageous than the planned mass production system (larger batch quantity) in responding to the diverse demands especially of the automobile market.

Product leveling or small batches is more advantageous to respond to the market diversification. But still, leveling becomes more difficult as diversification develops. Toyota copes up with this problem well enough and keeps market diversification and production leveling in harmony.  In this endeavor, it is important to avoid the use of dedicated facilities and equipment and also equipment that has very general utility. It is important to put in effort and develop specialized, and yet versatile production processes through use of machines and jigs that can handle minimal quantities (Lot sizes of one). It is difficult but we must utilize all available knowledge to avoid undermining the benefits of mass production.

Kanban Accelerates Improvements

Carrying Carts as Kanban

The Elastic Nature of Kanban


3. Further Development


An Autonomic Nervous System in the Business Organization


Ohno says that human body has autonomic nerves that work as instant reflux to certain external stimuli and motor nerves that work under the command of the brain.

Similar to that in TPS, worker make some decisions without the involvement of production control or engineering departments. Production control and engineering departments are the brain of the organization.

In TPS workers stop the plant when problem occurs, decide the sequence to follow in making parts and also decide when overtime is necessary. They need not involve brain in reacting to some small changes in plans.

Provide Necessary Information When Needed


Computers should not be bought and used indiscriminately. It should not lead to higher costs. Processing customer orders and information on market needs and wants by computers can be very effective. But  kanban communication system is more effective in production communication.

The Toyota Style Information System


Toyota does production planning like other companies.  It has an annual plan, say for instance making 2 million cars in the year.  Next, there is a monthly plan, announced a month ahead. Based on the monthly plan daily production schedule is established and this is based on production leveling. Each production line is informed of the daily production quantity. But the daily sequence schedule (sequence of models and color) is sent to only one place - the final assembly line.

The production order for a specific car is issued to the process 1 of the assembly line. This production order will have all the information needed for its production and the workers in the following assembly  processes can tell which parts to use by at the car this  production order attached to car. Workers in the subprocesses can know what to do as soon as they see the car in assembly at the first stage. If needed they are sent the information directly.  Toyota makes sure the right information reaches the operators at the right time by letting the products being produced carry the information needed to assemble them.

Fine Adjustment


To cope with a constantly fluctuating market, the production line must be able to respond to schedule changes.  One day, the line may make four Car A's and six Car B's. But on another day, the ratio might turn out be the reverse - six car A's and four car B's. Such reversed ratios are followed the production line as per the information carried by the Kanban

Coping with Changes

Fine adjustment also means that mistakes are corrected immediately.

What Is True Economy?


True economy is tied directly to the survival of business. In Toyota production system, economy or efficiency is thought in terms of manpower reduction and cost reduction for making one car. Manpower reduction is a means for cost reduction, which the most critical condition for the growth of the business and its survival. The criterion for all decision making in Toyota is cost reduction.

Many improvement ideas are to be generated and each idea has to be thorougly investigated. The cost of improvement should not be more than the cost reduction. Unless, the judgment is made carefully, cost increasing improvements may be undertaken.

At Toyota, we still use many old machines, by maintaining them properly and daily, improving work methods and making layout changes. A layout must make worker activities easy and should not impede production flow.

Re-Examining the Wrongs of Waste


TPS is a method to thoroughly eliminate waste and enhance productivity. Waste refers to all activities of production that increase cost but not add any value (No increase in price takes place due to them). For example, excess people, inventory, and equipment.

The primary waste of excess people, inventory and equipment give rise to secondary wastes.  Complete understanding of waste is essential to implement TPS successfully.

Generate  Excess Capacity


If excess capacity is there, we can use it for various purposes. At Toyota, through continuous improvement, we create excess capacity first and then use it profitably.

The Significance of Understanding


Ohno emphasize the importance of thoroughly understanding production and improvement of production methods and organization and the process of manpower reduction and cost reduction.

Understanding needs an approach to examine an objective positively and comprehend its nature. Careful inspection of a production area reveals waste and scope for improvement.  Only a very close observation reveals waste and work. There are work movements which are not processing, and there are processing activities which are a waste. Manpower reduction means raising the ratio value added processing activities to 100 percent of the working time.

Utilizing the Full Work System


All sources of waste have to be detected and crushed. Waste of overproduction is eliminated in TPS by strictly adhering to standard inventory. If the standard inventory is specified as 5, on a day when it becomes 3 only 2 are produced. On a day when it becomes 4 only one is produced. We call it a full work system, when all standard inventories are replenished in a day. We do not want any overproduction in a day.

Tact Time

(Do Not Make a False Show)

Tact is the length of time, in minutes and seconds, allowed by the customer demand to make one piece of the product. Tact is obtained by dividing the operable time per day (of the machine) by the required number of pieces per day.  Operable rate in TPS refers to the time machine is available for production in a day. The ideal operable rate is 100 per cent. To achieve this, maintenance has to be regular to prevent breakdowns and setup times are to be reduced. Operating rate refers to the production per day.

At Toyota, improvements increase the production quantity per day from a group of workers. But, if excess production is not required as per demand, the number of workers are reduced from the team and only required production is made. Unnecessarily producing excess is no efficiency.

Required Numbers Are All-Important


For each production line, numbers or quantity required by the market is important. In Toyota, we do not produce extra above the required quantity in any line. The excess manpower is transferred to other lines where needed. The required number is adhered to in a disciplined way.

The Tortoise and the Hare


At Toyota we produce according to the needs of the market at slow or fast rate everyday. It is the way of tortoise. We do not run very fast some days and then take rest on other days like a hare.

Take Good Care of Old Equipment


Ohno says, the expertise of a worker increases overtime. But in case of machine, the depreciation of the machines is the popular idea. If machines are poorly maintained and driven close to death, enormous costs are incurred in replacement.  Ohno says, with adequate maintenance, machines will have a longer life.

Look Straight at the Reality

When estimating future business, Ohno recommends that one must be realistic and be ready for instant declines in business.

0.1 Worker is Still One Worker


The savings that come from automation should result in saving a full worker. Then only automation will give cost reduction. Ohno says at the design stage of the production system itself, fewer workers are to be employed. One should not employ more workers initially and then remove them when not needed.

Ohno, in this point also stresses that, they form teams of workers and do not allow only one worker to work in isolation.

Management by Ninjutsu

Management by Ninjutsu means acquiring management skills by training.

In an Art Form, Action is Required
An engineer is an artist. Art requires action not speaking.

Profit Making Industrial Engineering at Toyota


Advocating Profit-Making Industrial Engineering

Surviving the Slow-Growth Economy

4. Genealogy of the Toyota Production System


This chapter gives many passages from the thoughts and sayings of Toyota Sakichi and Toyoda Kiichiro.

Toyoda Kiichiro once told Toyoda Eiji that the best way to work in an automobile assembly plant would to have all parts for assembly at side of the line just in time for their use. The words "just-in-time" attracted many managers of Toyota and Ohno was also attracted by those words.

Taiichi Ohno had experience of cost reduction at Toyota Spinning and Weaving also. The company was implementing cost reduction measures  to catch up and surpass  Lancashire and Yorkshire companies. Toyoda Sakichi had world class view. Toyoda Kiichiro also had world class view. In the two pillars of TPS, autonomation came from Toyoda Sakichi and JIT came from Toyoda Kiichiro.

Toyoda Sakichi said that he observed a grand mother hand weaving for a full day and developed interest in developing a machine for it. Ohno likes that idea of observing on the shop floor to understand things. He wrote "Stand on the shop floor all day and watch - you will eventually discover what has to be done."

Toyoda Kiichiro visisted America and he must have thought about how surpass America's highly developed automobile production system and utter the idea of JIT.

Toyoda Sakichi talked of inventions made by Japanese efforts, knowledge and intellect. He made 100 inventions with patents.







A Global World Around Us



Two Extraordinary Characters

Learning from the Unyielding Spirit

I believe just-in-time was Toyoda Kiichiro's dying wish  - Ohno

Toyotaism with a Scientific and Rational Nature

Provide Good Equipment Even If the Factory Is Simple

Pursuity of a Japanese-Style Production Technique

Making Products That Have Value

Toyoda Kiichiro recognized that the market always demands reasonably priced products.  He wrote "We know our cars will not sell unless they are cheaper than foreign models. "We might manage to sell 50 to 100 cars per month by appealing to patriotism. But selling 200 or 500 cars per month would be difficult. In the end, prices must be competitive."

Can we actually produce economical cars domestically? Cars with proper materials and proper quality?

A Chess Player's View

In Search of Something Japanese

Witnessing a Dialectic Evolution

Toyoda Kiichiro  " we shall learn production techniques from the American method of mass production. But we will not copy it as is. We shall use our own research and creativity to develop a production method that suits our own country's situation."

I believe this was the origin of Toyoda Kiichiro's idea of just-in-time.

5. The True Intention of the Ford System


The Ford System and the Toyota System


Ohno acknowledges - Henry Ford without dispute created the automobile production system. Toyota system uses the flow system developed by Ford. But the difference is that at Ford they were concerned about warehousing the parts and moving the chassis past the warehouse. Toyota eliminated the warehouse.

Small Lot Sizes and Quick Setup


The American automobile business has continuously shown that planned mass production has the greatest effect on cost reduction. The Toyota system takes the reverse course. The slogan is "small lot sizes and quick setups." Toyota system works on the premise of totally eliminating the overproduction generated by inventory and costs related to workers, land, and facilitates needed for managing inventory.

Toyota system works on the premise of totally eliminating the overproduction generated by inventory and costs related to workers, land, and facilities needed for managing inventory.

Rapid changeovers are an absolute requirement for the Toyota Production System. Teaching workers to reduce lot sizes and setup times took repeated on-the-job training.

The Foresight of Henry Ford


Ford said what we do have to bother about is the waste of human labor.  Material in our factory represented labor. When we are wasting material we are wasting labor of some body. We will use material more carefully if we think of it as labour.  Our studies and investigations up to date have resulted in the saving of 80,000,000 pounds of steel a year and this amounts to about 3 million dollars a year.


Standard are Something to Set Up Yourself



Prevention Is Better than Healing


Toyota's strength does not come from its healing processes - it comes from preventive maintenance.

Is There a Ford after Ford?


Ohno said "I think the TPS can be applied in America where the market for many types in large quantities is there."

Toyota has learned a lot from the Ford system.

Inverse Conception and Business Spirit


Is cotton the best material we can use here?  (in seats) As an answer to this question Ford came up with flax and methods to handle it mechanically. Ohno said, "I was intrigued by Ford's question. Is cotton the best material we can use here?"  As Ford pointed out, people follow tradition. This might be acceptable in private life, but in industry, outdated customs must be eliminated. This process of aking why represents Ford's business spirit.  Ohno said reading Ford shows many such brilliant inverse conceptions.

Getting Away from Quantity and Speed

Is efficiency in production systems wrecking all the finer things in life?

Efficiency is merely doing the work in the best way you know rather than in the worst way. It is the taking of a trunk up a hill on a truck rather than on one's back. It is training of the worker and the giving to him of power so that he may earn more and have more and live more comfortably.

6. Surviving the Low-Growth Period


The System Raised in the High-Growth Period

Raising Productivity during Low Growth

Learning from the Flexibility of Ancient People

Important Terms Used to Describe Toyota Production System


Andon

Autonomation

Baka-Yoke

Baton Passing Zone

Do NOt Mkae Isolated Islands

Five Why's

Just-in-Time

Kanban

Labor Saving to Worker Saving to Reducing Number of Workers

Moving vs. Working

Multi-Process Operation System

Operating Rate and Operable Rate

Production Leveling

Profit-Making Industrial Engineering

Real Cause

Required Numbers Equal Production Quantity

Small Lot Sizes and Quick Setups

Standard Work Procedures

Stopping the Line

Tact Time

Toyota Production System

Visual Control (Management by Sight)

Waste Recognition and Elimination

Work Flow and Work Forced to Flow


Work Improvement vs. Equipment Improvement
Work productivity improvement is productivity improvement using the existing equipment. Only tools, jigs and fixtures are introduced as required in work productivity improvement.
If equipment improvement comes first, manufacturing processes will never be improved.



Ud. 2.6.2025
Pub. 30.5.2025