Saturday, December 7, 2013

GS Productivity Solutions Limited - Bristol, UK - CNC Productivity Consultants



http://www.gspsltd.co.uk/


What can GS Productivity Solutions provide?
When you are looking for innovation to help improve efficiency and quality, GSPS are able to offer cutting edge solutions, all the nescessary training and the technical job knowledge and back up to ensure that your manufacturing facility is always running at peak performance.

Our team specialise in the sale (at the right price!), the installation (at the right time!) and the training (to right level!) of only the products we consider will fit your company and your job.  If we don’t cover what you need, we’ll  probably know someone who does -

Probing
Machining
Production Management
Microsoft Excel
CAD/CAM systems
Siemens controllers
Data Collection
Haas controllers
Fanuc Controllers

GS Productivity Solutions Ltd

37 Baileys Mead Road

Stapleton

Bristol

BS16 1AE

England

Trainor and Associates - IE Consultants - Bartlett, TN, USA



http://industrialengineeringconsultingfirm.com/


Trainor and Associates
Process Improvement Specialists
4285 Wind Tree Cove
Bartlett, TN 38135

bobtrainor@bellsouth.net
Phone: 901-373-8940

10 Industrial Engineering Services
http://industrialengineeringconsultingfirm.com/structured-processimprovements

SMED - YouTube Videos



Seeing believing. Recently in a class, I was describing the SMED procedure and a participant said, it is impossible. He would have believed it, if I showed him this video which I found it on 5.12.2013. The incident occurred some time in November 2013


Shanley Enterprises - Clamps - Die change video
______________

______________

In the above video the old die is removed, the new die is inserted and some bolts were tightened in 5.26 minutes.

A large stamping press die change over using an air cart and our mechanical die change clamps

http://DieChangeClamp.com


Atlas Technologies Automatic Die Change System - Video
_______________

_______________


Vidoe Published on 20 Aug 2012
Atlas Technologies fully automatic, domino die change utilizes one additional cart to the number of presses in the line. The line shown above exchanges die sets in less than 5 minutes.
________________________________________________________________________________
________________________________________________________________________________

Removing the Old Die in 5.39 minutes
_______________

_______________


Fitting the New Die in 7.42 minutes
______________

______________


_____________ ______________

Sipe Engineering - York, Pennsylvania - Industrial Enginering Consultancy Services

call us at (717)-881-3145

Plant Layout
Plant Transformation
Operation Excellence
Lean Manufacturing
Facilities Engineering
Standard Data
Work Measurement Studies
Value and Non Value-Added Activities
Cellular Layout
Work Cell Designtire-building-factory-floor
AutoCad Layout
Work Flow
Process Improvement
Value Stream Mapping (VSM)
Setup Reduction


http://www.sipeengineering.com/services/

http://www.sipeengineering.com/contact/

Thursday, December 5, 2013

Sunday, December 1, 2013

Takeshi Kawase - Industrial Engineering - Definition


Takeshi Kawase is one of Japan’s foremost authorities on Industrial Engineering.



Definition of Industrial Engineering

Kawase defines IE as dealing with the efficiency of systems that include humans.


Compare with definition of Narayana Rao K.V.S.S.
Industrial Engineering is Human Effort Engineering and System Efficiency Engineering.



Believing that IE lies between science and the humanities, he draws from both approaches. Thus, Kawase insists that manufacturing must be automated to the fullest, while never losing sight of the fact that people are not machines. As he clearly shows, above all else people make value judgments, and it is these judgments that will lead to effective problem solving.


Although well versed in the theories and techniques of IE, Takeshi Kawase focuses on the philosophy of problem solving. The keystones of his philosophy lie in the ideas that every problem has an owner and that a problem’s owner is the person best equipped to solve the problem, as long as the techniques are straightforward and the necessary support is provided. The goal therefore is to come up with a solution that matches the owner’s needs and that will enhance rather than diminish job satisfaction and pride. To this end, Human-Centered Problem Solving advocates the implementation of the line-centered model of problem solving as the most effective way to achieve this goal.


Human-Centered Problem Solving: The Management of Improvements   -  Book by Kawase

Human-Centered Problem Solving: The Management of Improvements presents problem solving as an on-going process. Thus, a problem is never entirely solved. It changes, evolves, and points to new goals, for a system without problems is static and therefore unproductive. Without problems, there can be no innovation. As Kawase reminds his readers, kaizen was a relatively unused word when it was chosen to translate the term “improvement” imported from the United States.

Human-Centered Problem Solving: The Management of Improvements does not offer a quick fix. Rather, it calls for a long-term perspective that allows for the democratization of problem solving. Only by avoiding the common mistake of delegating problem solving to “specialist” will every member of an organization become a problem-solving specialist. Only then will the organization become vibrant, innovative, and successful.

Human-Centered Problem Solving: The Management of Improvements is must reading for harried corporate staff overwhelmed by seemingly impossible problems. For students of IE, it will shape their thinking now and throughout their careers. Human-Centered Problem Solving: The Management of Improvements’ approach to problem solving points to a future when problems are seen as opportunities, not barriers.

http://www.apo-tokyo.org/catalogue/3library.pub.htm


About Gemba
http://andresugiyono.edublogs.org/2006/11/24/about-genba/



Japanese Leaders in Efficiency - Productivity Movement - Industrial Engineering.

Yoichi Ueno - Japanese Leader in Efficiency - Productivity Movement
#IndustrialEngineering #Productivity #CostReduction #Japanese
https://nraoiekc.blogspot.com/2016/06/yoichi-ueno-japanese-leader-in.html

Rear Admiral Takuo Godo - Productivity Promoter in Japan
#IndustrialEngineering #Productivity #CostReduction #Japanese
https://nraoiekc.blogspot.com/2016/06/rear-admiral-takuo-godo-productivity.html


Shigeo Shingo - The Japanese Industrial Engineer - Contribution to Industrial Engineering
#IndustrialEngineering #Productivity #CostReduction #Shingo #Japanese
https://nraoiekc.blogspot.com/2012/03/shigeo-shingo-japanese-industrial_20.html

Taiichi Ohno on Industrial Engineering - Toyota Style Industrial Engineering
#IndustrialEngineering #Productivity #CostReduction #Japanese
https://nraoiekc.blogspot.com/2013/11/taiichi-ohno-on-industrial-engineering.html


Takeshi Kawase - Industrial Engineering - Definition. IE  deals  with the efficiency of systems that include humans.
#IndustrialEngineering #Productivity #CostReduction #Japanese
https://nraoiekc.blogspot.com/2013/12/takeshi-kawase-industrial-engineering.html

Cost Estimating and Estimator's Job - A Description




Job Shop Estimating


Estimator’s job -  dozen tasks. In reality, these tasks may overlap or evolve in different sequences.

1. Process identification
2. History retrieval
3. Compatibility check
4. Work order prep
5. Time study
6. Material planning
7. Fixtures/special handling
8. Costing
9. Pricing
10. Presentation
11. Review
12. Optimization

Job shop estimating: A business process examined in 12 steps


The estimator is expected to know how to dissect a product design into a manufacturing sequence.

An estimator might review the documentation provided with a request for quote (RFQ)  in several passes or stages. Experienced estimators, in reality, are able to perform almost all of these modes of analysis simultaneously.

An early pass through the design is made to identify which features of the product can be manufactured in-house as well as those that must be subcontracted. The next stage might be to plan a sequence of manufacturing, starting with cutting raw material, progressing through each stage of fabrication, and ending with the product ready for shipment and invoicing. With the general work sequence outlined, the estimator will need to obtain bids for the subcontracted fabrication steps. While waiting for those bids to come in, the estimator refines each of the in-house manufacturing steps in terms of material condition on input, material condition on output, labor, machinery, tooling, fixtures, software, quality control, yield, and queue time.


Clearly, a detailed cost estimate can require a significant amount of effort on the part of the estimator. To minimize wasted effort, perhaps the first-pass evaluation is to determine compatibility. If the project is not a good fit with the shop, the shop shouldn’t waste time quoting it.

Subtleties involved in determining compatibility. This is essentially a measure of the degree of difficulty of the project. Part of the strategic vision for the shop is to define what the ideal project entails.
It is a matter of company policy to decide what to do about jobs that deviate from the “ideal” project. For example, the shop’s machinery capabilities allow it to hold tolerances that differentiate it from the competition. As a result, the shop’s mission might call for targeting high-precision work that demands rigorous quality control procedures to eliminate defects.

In this setting, the estimator may look at a project that has very coarse tolerances as if it required the precision capability available in-house. This decision is likely to result in a very high price quote relative to the competition’s with less capital overhead—essentially turning away the super-easy in favor of the ideal.

That same estimator might come across a project that requires more than the normal degree of precision. Perhaps the parts will have to be 100 percent inspected and sorted to achieve the desired consistency in a delivered batch of parts. The tactic is to quote the hypercritical project as if it were “routine.” This will result in a low price quote relative to the competition’s, which passes on all anticipated manufacturing expenses to the customer.

This “hard-is-easy” approach will attract work aggressively at the extreme level of difficulty for the shop. This is not a sustainable business model. Giving good work away for no gain is nonsense. With experience based on its performance, the shop can adjust its pricing tactics over time to establish both the ideal customer margin as well as the ideal mix of manufacturing projects.

Specifically, what is an estimator looking for while trying to determine how well a project fits with the shop?

Verifying the Capabilities

The estimator uses retrieval tools to pull the previous history of the project when updating a price quote.In the context of a compatibility check, the estimator attempts to verify that the project can be built “same as last time.”
Given that the design of the project has not changed, the estimator needs to verify that all of the machinery, tooling, fixtures, and skill set remain available. If there is a deficiency in capacity, then the estimator might consider subcontracting or some alternative response to the RFQ.

In terms of tooling, the considerations are very trade-specific. The goal is to identify tooling expenses that must be included in the price quotation. As an example of a tooling compatibility issue, imagine working in a sheet metal shop that operates a CNC turret press for punching and profiling the flat blank. To punch a rectangular hole, punch and die tooling can be manufactured to the perfect dimension. On the other hand, a smaller punch—either square or rectangular—can be used with several strokes to carve out the desired rectangular cutout.

The estimator will need to balance the expense of obtaining the perfect tooling—in this case, the rectangular punch and die tooling—with the extra machine time, cosmetic appearance, and deburring requirements of carving the hole with several strokes using on-hand tooling. If the production batch size is large enough, dedicated tooling is a cost advantage. For small batches or quick-turn jobs, using on-hand tooling in a less-than-ideal way might be the most cost-effective solution.

In addition to tooling, basic compatibility with the machinery is a vital consideration. If the part won’t fit in the machine, the estimator shouldn’t quote the project. In the sheet metal trade, the press brake equipment presents several constraints on what is buildable. These constraints are not always intuitive to the designer. A frequent problem is sheet metal that crashes into the machine during the final folding operation. Part designers often don’t take that into consideration.

Not the least important is compatibility with the raw material. There are the obvious errors and oversights, such as calling for anodize on steel parts or tapped holes in thin sheet metal. Some materials will not flow in an injection mold given the required cross section and distance. Many metal alloys are difficult to bend in a press brake—without the proper inside bend radius the part would crack at the bend. If the estimator fails to note these pitfalls, the shop will be doomed to less-than-stellar performance by either failing to produce the promised product or by producing the project at a loss.

Each manufacturing process has limitations. These include tolerance and precision, compatibility with raw materials, weight and size range of the raw billet, and schedule availability. Trade-specific considerations include details like minimum hole size, distance from hole to bend, and depth of the hole.

Establishing a Dialogue

When the estimator is confronted with designs that violate some manufacturing constraint, the project obviously cannot be built as designed. The shop’s strategic policy will govern what the estimator is to do. It might be productive to have the estimator make design suggestions to improve the manufacturability of the project. For example, if the issue is with a hole specification that is too small, the estimator could quote it based on the hole being changed to an acceptable size and noting that deviation on the price quotation.
Sometimes the customer will welcome these helpful suggestions. This cost-savings suggestion dialogue is an additional service that adds value to the business relationship between the customer and the job shop. However, the suggestion also can be offensive to some. The customer’s response might be, How dare you question my design?

Making an Operational Impact

One of the joys of being a job shop is being a shared resource. Over time the estimator may see a trend developing in the variety of projects that successfully pass through the shop. Perhaps that trapezoidal cutout that has been made with several machine cycles—for several different customers—should be converted to a dedicated tool or workcell. This would be an investment in tooling that the shop would make to improve its prevailing internal operating costs.

This overall review of trends in project compatibility might lead the estimator to make internal recommendations for upgrades in machinery as well as in tooling. “Designed for manufacturing” applies to the product as well as to the production line. If you find yourself subcontracting a lot of the same thing, why not do it in-house if it would improve scheduling, expense, or quality control? The review of how compatible the shop is with the target market is not always part of the estimator’s job responsibilities. However, if suggestions are solicited, the estimator has access to a gold mine of information.

Reviewing the performance history of the shop’s bids is a powerful tool. Company management can find out how compatible the estimator’s quotes are with the shop’s business goal. Again, the metrics and policies for reviewing an estimator’s performance will be specific to each firm. We will generalize by saying that a gross profit can be calculated for each project completed in the shop. A target gross profit could be established and used as one of the measures of the estimator’s compatibility with the shop.

Regular review and focused adjustments in behavior should result in harmony. Sometimes the behavioral adjustments happen on the production line, either as a result of improved work order instructions, setup procedures, or improved training.

The estimator’s performance is a function of vision. Knowing what the shop’s internal capabilities are is a vital contributor to excellent cost estimating. An occasional sabbatical as a shop worker can help the estimator to complete better time-and-motion studies and predictions for manufacturing operations.
Attending tradeshows gives the estimator a chance to investigate state-of-the-art equipment, which might be needed in the future.

Visiting the customer enables the estimator to understand the context of the project. These visits can help refine packaging, inspection, and cosmetic handling procedures.

Tours of subcontractors’ facilities are another great way to expand the estimator’s skill set. Businesses change and evolve. Keeping up with the best in the shop’s business network gives the estimator a definite competitive advantage.

Adopted from the source:



Articles on Steps of Job Estimating


Step 3: Evaluate the fit of the product being quoted
Step 4: Preparing the "work order"
Step 5: Preparing the "time study"
Step 6: Anticipating the costs of material inventory
Step 7: Dealing with the nonrecurring onetime expenses
Job shop estimating: Programming, fixtures, and special handling
Step 8: Feedback from completed work history
Step 9: Anticipating the needs of the marketing effort
Step 10: Documentation for the marketing effort
Step 11: Review with an eye on improvement