Fahad Hantool
Production Engineer at Al Sad Modern Beverage Factory | Certified By the SCE
Saudi Arabia
https://www.linkedin.com/in/fahad-hantool-558602158/
Industrial Engineering is System Efficiency Engineering. It is Machine Effort and Human Effort IE. 4 Million Page View Blog. 200,000+ visitors. (36,000+ pv, 25,500+ visitors in 2025.)------------------ Blog Provides Industrial Engineering Knowledge: Articles, Books, Case Studies, Course Pages and Materials, Lecture Notes, Project Reviews, Research Papers Study Materials, and Video Lectures. 2025 - New Project - Effective Industrial Engineering and Productivity Management.
Fahad Hantool
Production Engineer at Al Sad Modern Beverage Factory | Certified By the SCE
Saudi Arabia
https://www.linkedin.com/in/fahad-hantool-558602158/
I would like to state the philosophy of industrial engineering as engineering systems can be redesigned or improved and installed periodically for productivity increase or improvement. The primary drivers of productivity improvement are developments in basic engineering disciplines and developments in industrial engineering (developments in productivity science, productivity engineering and productivity management). The additional drivers are developments in related disciplines, for example, economics, mathematics, statistics, optimization techniques, ergonomics, psychology and sociology etc. - Narayana Rao, 1 April 2021.
Industrial Engineering - History
https://nraoiekc.blogspot.com/2013/10/industrial-engineering-history.html
Industrial engineers and productivity managers can study Coca-Cola’s journey to learn from its experience the successful implementation of system level total productivity management.
"A case study of total productivity management" BY K.V.S.S. NARAYANA RAO, Industrial Management, March/April 2021 pp. 10 to 15.
https://www.iise.org/Details.aspx?id=652
Coca-Cola (KO) Q2 2020 Earnings Call Transcript for the period ending June 30, 2020.
Using our productivity mindset, we are continuing to uncover cost-saving opportunities across the supply chain and operating expenses.
2019
Plan to realize cumulative savings of $4.3 billion in 2019.
21 October 2014
Coca Coal is expanding its current successful productivity program by targeting annualized savings of $3 billion per year by 2019.
15 October 2013
As a combined productivity and reinvestment program, the company anticipates generating annualized savings of $550M-$650M which will be phased in over time. Coke said it expects to begin fully realizing the annual benefits of these savings in 2015, the final year of the program.
https://nraoiekc.blogspot.com/2019/10/productivity-success-story-coca-cola.html
1000s of industrial engineers are working in various organizations in countries of the world. What activities are being carried out by them and what are their achievements? This collection of blog posts is assembling the details of some of these industrial engineers. This data collection will enable us to understand the issue better over a period of time.
Yunus Emre Özdemir
Industrial Engineer
Samsun, Turkey
https://www.linkedin.com/in/yeozdemir/
EMRE İNAN
Industrial Engineer
Bursa, Turkey
https://www.linkedin.com/in/einan/
Enas Esh
Professional Industrial Engineer, PE
Egypt
https://www.linkedin.com/in/enasesh/
Nagnath Eklare
Industrial Engineer at Shenzhen Topband Co.,Ltd
Pune, Maharashtra, India
https://www.linkedin.com/in/nagnath-eklare-92626153/
Edward Price
Industrial Engineer at JBS USA
Grand Island, Nebraska, United States
https://www.linkedin.com/in/edward-price-316165a5/
Industrial Engineers, Benchmark your productivity improvement achievement with
Brian Hong, Group Director, Productivity Center of Excellence at The Coca-Cola Company
I would like to state the philosophy of industrial engineering as engineering systems can be redesigned or improved and installed periodically for productivity increase or improvement. The primary drivers of productivity improvement are developments in basic engineering disciplines and developments in industrial engineering (developments in productivity science, productivity engineering and productivity management). The additional drivers are developments in related disciplines, for example, economics, mathematics, statistics, optimization techniques, ergonomics, psychology and sociology etc. - Narayana Rao, 1 April 2021.
Industrial Engineering - History
https://nraoiekc.blogspot.com/2013/10/industrial-engineering-history.html
Industrial engineers and productivity managers can study Coca-Cola’s journey to learn from its experience the successful implementation of system level total productivity management.
"A case study of total productivity management" BY K.V.S.S. NARAYANA RAO, Industrial Management, March/April 2021 pp. 10 to 15.
https://www.iise.org/Details.aspx?id=652
Coca-Cola (KO) Q2 2020 Earnings Call Transcript for the period ending June 30, 2020.
Using our productivity mindset, we are continuing to uncover cost-saving opportunities across the supply chain and operating expenses.
2019
Plan to realize cumulative savings of $4.3 billion in 2019.
21 October 2014
Coca Coal is expanding its current successful productivity program by targeting annualized savings of $3 billion per year by 2019.
15 October 2013
As a combined productivity and reinvestment program, the company anticipates generating annualized savings of $550M-$650M which will be phased in over time. Coke said it expects to begin fully realizing the annual benefits of these savings in 2015, the final year of the program.
https://nraoiekc.blogspot.com/2019/10/productivity-success-story-coca-cola.html
2018-19 Annual Report Presentation
TPS/Cost Reduction
Cost Reduction Efforts: +80
Decrease in Expenses: -165
https://nraoiekc.blogspot.com/2020/04/toyota-industrial-engineering.html
Sridhar Dhondi
Industrial Engineer / Sr Manufacturing Engineer
Hyderabad, Telangana, India
https://www.linkedin.com/in/sridhar-dhondi-9592a921/
AVIRAT Dhanal
Industrial Engineer | IoT | Business Development Manager | Industry 4.0| Health 4.0 | Pharma 4.0 | Layout Design |Lean | process simulation
Kolhapur, Maharashtra, India
https://www.linkedin.com/in/aviratdhanal/
Vinoth kumar Devadoss
Associate Team Lead - Industrial engineer - Expleo Group - PCA automobiles
Greater Chennai Area
https://www.linkedin.com/in/vinoth-kumar-devadoss-7a227b89/
Muralee Dharan
M.E Industrial Engineering @ KUMARAGURU COLLEGE OF TECHNOLOGY
Tamil Nadu, India
https://www.linkedin.com/in/muralee-dharan-76233544/
Girija Shankar Das
Senior Industrial Engineer - FedEx Express
Mumbai, Maharashtra, India
https://www.linkedin.com/in/girija-shankar-das-a9145898/
https://academia.edu/103626052/INTRODUCTION_TO_MODERN_INDUSTRIAL_ENGINEERING_Version_3_0
Industrial Engineers, Benchmark your productivity improvement achievement with
Brian Hong, Group Director, Productivity Center of Excellence at The Coca-Cola Company
I would like to state the philosophy of industrial engineering as engineering systems can be redesigned or improved and installed periodically for productivity increase or improvement. The primary drivers of productivity improvement are developments in basic engineering disciplines and developments in industrial engineering (developments in productivity science, productivity engineering and productivity management). The additional drivers are developments in related disciplines, for example, economics, mathematics, statistics, optimization techniques, ergonomics, psychology and sociology etc. - Narayana Rao, 1 April 2021.
Industrial Engineering - History
https://nraoiekc.blogspot.com/2013/10/industrial-engineering-history.html
Industrial engineers and productivity managers can study Coca-Cola’s journey to learn from its experience the successful implementation of system level total productivity management.
"A case study of total productivity management" BY K.V.S.S. NARAYANA RAO, Industrial Management, March/April 2021 pp. 10 to 15.
https://www.iise.org/Details.aspx?id=652
Coca-Cola (KO) Q2 2020 Earnings Call Transcript for the period ending June 30, 2020.
Using our productivity mindset, we are continuing to uncover cost-saving opportunities across the supply chain and operating expenses.
2019
Plan to realize cumulative savings of $4.3 billion in 2019.
21 October 2014
Coca Coal is expanding its current successful productivity program by targeting annualized savings of $3 billion per year by 2019.
15 October 2013
As a combined productivity and reinvestment program, the company anticipates generating annualized savings of $550M-$650M which will be phased in over time. Coke said it expects to begin fully realizing the annual benefits of these savings in 2015, the final year of the program.
https://nraoiekc.blogspot.com/2019/10/productivity-success-story-coca-cola.html
2018-19 Annual Report Presentation
TPS/Cost Reduction
Cost Reduction Efforts: +80
Decrease in Expenses: -165
https://nraoiekc.blogspot.com/2020/04/toyota-industrial-engineering.html
Industrial/Manufacturing Engineer at Bharat Forge Ltd with 7 Years of experience
Pune, Maharashtra, India
Since Sep 2013
1. Autocad.
2. Catia
3. Design knowledge of Jigs & Fixtures for assembly & Fabrication processes.
4. Documentation knowledge of Standard Operating Process (SOP), Process Failure Mode Effect Analysis (PFMEA) etc.
5. Good knowledge of Microsoft Excel and other office suit tools.
6. Exposure to Proving out Toolings, Jigs & Fixtures for assembly & fabrication shops.
7.Tooling and tackle design
8.Plant layout design
9.Project aim to enhance productivity
https://www.linkedin.com/in/dattatray-chandam-462b6945/
Kuldeep Chavda
Industrial engineer
Ahmedabad, Gujarat, India
https://www.linkedin.com/in/kuldeep-chavda-a28a76133/
Mahesh chavan
Industrial Engineer at Endress+ Hauser Flowtech Pvt. Ltd. Aurangabad.
Aurangabad, Maharashtra, India
https://www.linkedin.com/in/mahesh-chavan-919a13123/
BUBAI CHOWDHURY
Senior Industrial Engineer at TOSHIBA Transmission & Distribution Systems (India) Pvt. Ltd.
Hyderabad, Telangana, India
https://www.linkedin.com/in/bubai-chowdhury-68140490/
Leading Manufacturing Engineering Function, Lean Manufacturing, Industrial Engineering, Six sigma ,MOST certified
Pune, Maharashtra, India
Manager Industrial engineering
Lear Corporation
Since Oct 2015
• Lead the implementation of a continuous improvement culture, which will impact customers, internal processes and supplier base.
• Through collaboration with multiple teams, integrate lean, six sigma and continuous improvement techniques and tools into daily business processes that focuses on waste elimination, cost reduction and process improvements for a successful transformation.
• Translate high level strategy into tactical business actions and forge real improvements. Lead Process Improvement Teams and direct timely completion of projects that support critical goals.
• Lead the Lean steering committee discussions to track progress of identified/implemented projects and to prioritize future events. Provides support in the development of value stream maps, process mapping and analyzing business processes.
• Develop enterprise-level goals and metrics that encourage and promote Lean thinking. Ensure all improvement activities are identified, tracked and clearly communicated. Identifies core areas of improvement which forward the overall business strategy.
• Develop internal processes to reduce non-value added activities and provide improved business results. Facilitate process improvement teams and Kaizen events involving value streams core to the business.
• Develop and implement a balanced score card methodology. Ensure procedures, policies and standards are fully documented and kept up-to-date.
Responsible for MOST Implementation at Indian 10 plants, monitoring productivity & line efficiency. Established daily efficiency monitoring system through tracking HC vs Output. Support for ASIAN & chines lear plant for MOST implementation through Training and line balancing implementation. Productivity increased through MOST by 15%.
✓ Line balancing as per work content, MOP & manpower calculations, capacity analysis & work balancing of all areas including Indirect areas.
https://www.linkedin.com/in/divakar-chaudhari-34768190/
Prasad Chaskar
Industrial and Process Engineer at Jabil
Pune, Maharashtra, India
https://www.linkedin.com/in/prasad-chaskar/
https://www.linkedin.com/in/kanak-roy-chowdhury-a5286515/
https://www.linkedin.com/in/sankar-c-18397b128/
I would like to state the philosophy of industrial engineering as engineering systems can be redesigned or improved and installed periodically for productivity increase or improvement. The primary drivers of productivity improvement are developments in basic engineering disciplines and developments in industrial engineering (developments in productivity science, productivity engineering and productivity management). The additional drivers are developments in related disciplines, for example, economics, mathematics, statistics, optimization techniques, ergonomics, psychology and sociology etc. - Narayana Rao, 1 April 2021.
Industrial Engineering - History
https://nraoiekc.blogspot.com/2013/10/industrial-engineering-history.html
Industrial engineers and productivity managers can study Coca-Cola’s journey to learn from its experience the successful implementation of system level total productivity management.
"A case study of total productivity management" BY K.V.S.S. NARAYANA RAO, Industrial Management, March/April 2021 pp. 10 to 15.
https://www.iise.org/Details.aspx?id=652
Coca-Cola (KO) Q2 2020 Earnings Call Transcript for the period ending June 30, 2020.
Using our productivity mindset, we are continuing to uncover cost-saving opportunities across the supply chain and operating expenses.
2019
Plan to realize cumulative savings of $4.3 billion in 2019.
21 October 2014
Coca Coal is expanding its current successful productivity program by targeting annualized savings of $3 billion per year by 2019.
15 October 2013
As a combined productivity and reinvestment program, the company anticipates generating annualized savings of $550M-$650M which will be phased in over time. Coke said it expects to begin fully realizing the annual benefits of these savings in 2015, the final year of the program.
https://nraoiekc.blogspot.com/2019/10/productivity-success-story-coca-cola.html
2018-19 Annual Report Presentation
TPS/Cost Reduction
Cost Reduction Efforts: +80
Decrease in Expenses: -165
https://nraoiekc.blogspot.com/2020/04/toyota-industrial-engineering.html
Sr. Engineer Industrial Engineering at Molex India pvt. ltd.
Bangalore Urban, Karnataka, India
Senior Industrial Engineer
Company: Molex
Since Jun 2016
Responsible for Industrial engineering activities for cable harness plant. Layout planning, productivity improvement projects, VSM, line balancing, lean implementation, Kaizen, SAP routings, MII implementation for plant are some key activities.
https://www.linkedin.com/in/prashant-bagal-55047556/
Nilesh Borate
Executive-Industrial Engineer at SkillTelligent Solutions Pvt. Ltd.
Pune, Maharashtra, India
https://www.linkedin.com/in/nilesh-borate-19a9a8b1/
Mangesh Bahure
Sr Industrial Engineer with expertise in Time & Motion analysis, WCM tools, Lean manufacturing techniques.logistics.MTM
Pune, Maharashtra, India
https://www.linkedin.com/in/mangesh-bahure-079186102/
Rupesh Bhoi
Industrial Engineer
Chourasia, Gujarat, India
https://www.linkedin.com/in/rupesh-bhoi-4245a444/
Suraj Bankar
Senior Industrial Engineer at Havells India Ltd.
Pune, Maharashtra, India
https://www.linkedin.com/in/suraj-bankar-402b63104/
Industrial Engineer at Rheinmetall Automotive
Pune, Maharashtra, India
Maintain and develop Machine FMEAs and Process FMEAs
Develop and implement new engineering processes into production cells
Support Divisional Advanced Manufacturing studies for capacity analysis and new technologies including automation
Identify process inefficiencies or improvements
Assembly process flow development to meet efficiency and quality goals
Assembly line workstation layout and design
RFQ Preparation, process & equipment planning for the new model, installation & commissioning, process sheet preparation, PFMEA preparation, OEE improvement, FTQ improvement, Measurement system analysis, process validation, PPAP, capacity proving, process capability, Design of experiment, SOP, welding, CFT, Process validation, Plant layout
Demonstrate the ability to understand the source of variation by applying Six Sigma methodologies.
Knowledge of Gage R&R, SPC, Six Sigma, and PPAPs
https://www.linkedin.com/in/shivkumar-bidve-153556101/
Mohith Buxani
Industrial Engineer at Murakami Manufacturing U.S.A.
Since August 2019
Louisville, Kentucky, United States
3D DESIGN
•3D Design and print of jigs using Creo design software.
LAYOUT & LOCATION
•Designed a CAD Layout of the entire facility.
•Optimized layout & location of processes and set buffer stock to 50% demand, eliminating muda.
PRODUCTION & INVENTORY CONTROL
•Implementation of a "Make To Order" (Pull) production system integrated with an E-Kanban software to monitor part movement/requirements real time.
AUTOMATION
•Implementation of real-time part counting modules for parts by the presses.
SIX SIGMA
•Conducted various capacity studies, time studies, and six sigma tools to decrease non-value added time, with implementations of new routing systems.
PACKAGING
•Implementation of optimized dunnage designs for the components of new programs.
https://www.linkedin.com/in/mohith-buxani-profile/
https://www.linkedin.com/in/onkar-bhosale-0033188b/
https://www.linkedin.com/in/giriraj-bondhare-2b937b55/