Saturday, June 7, 2025

Machine Effort/Performance Improvement

 


https://freedomiot.ai/article/misc/machine-utilization-how-it-works-to-optimize-performance/


https://www.machinemetrics.com/blog/machine-operator-efficiency


https://www.eaton.com/us/en-us/markets/machine-building/optimize-machine-and-system-performance-eaton.html


https://www.secotools.com/article/118458?language=en


https://www.linkedin.com/advice/3/how-can-you-optimize-machinery-performance-s0l6c


https://praxie.com/optimization-in-heavy-machinery-manufacturing/


https://shop.machinemfg.com/10-tips-and-tricks-for-improving-machine-shop-efficiency/


https://limblecmms.com/learn/metrics/machine-efficiency/


https://teeptrak.com/en/2023/03/03/4291/


https://www.libertyprecision.com/blog/maximizing-utilization-with-machine-monitoring

Thursday, June 5, 2025

Principles of Industrial Engineering - IISE - Narayana Rao - Two Major Categories


Principles of Industrial Engineering - Paper by Prof. K.V.S.S. Narayana Rao, presented in 2017 IISE Annual Conference.


Principles of Industrial Engineering - Productivity, Technology, Machines, Optimization and Management.


1. Productivity science

2. Productivity engineering

3. Principles of (machine) utilization economy. Principle of machine productivity. 

4. Industrial engineering optimization

5. Industrial engineering economics

6. Productivity Management

7. Industrial Engineering is applicable to all branches of engineering

8. System level focus for productivity

9. Productivity measurement

10. Work measurement

11. Cost measurement

12. Productivity Project Implementation team membership and leadership

13. Hearty cooperation



Principles of Industrial Engineering - Human Effort Industrial Engineering


1. Human effort engineering for increasing productivity

2. Principle of motion economy 

3. Principle of Operator comfort and health. 

4. Selection of operators

5. Training of operators, supervisors and engineers

6. Productivity training and education to all

7. Employee involvement 

8. Productivity incentives




Principles of Industrial Engineering - Productivity Management.


1. Productivity Management

2. Industrial Engineering is applicable to all branches/activities of engineering

3. System level focus for productivity

4. Productivity measurement

5. Work measurement

6. Cost measurement

7. Productivity Project Implementation team membership and leadership

8. Industrial engineering economics - Return on Investment Principle

9. Hearty cooperation

Wednesday, June 4, 2025

Evolution of Industrial Engineering and Productivity Management - Part 3 - Contribution of Ueno, Ohno and Shingo

 


Industrial Engineering is Improvement Engineering. - Narayana Rao.

We can start the history of industrial engineering, scientific management and productivity improvement in Japan with the study of an article authored by Gilbreth by Yoichi Ueno for translating it into Japanese. No doubt, there were other incidents like some Japanese person listening to Taylor in USA. But Yoichi had done years of writing, teaching and practicing efficiency improvement and established number of organizations including the most famous, Japanese Management Association.





Yoichi Ueno graduated from Tokyo Imperial University in psychology subject in 1903  and joined the same institution. He was given an active part in translation, editing, and writing psychology materials.

However, Ueno did not like working in abstract theory and moved to the study of the application field like experimental psychology, advertisement psychology, aptitude tests and gradually got into efficiency study.

Psychology is study of human behavior, and efficiency is also related to human behavior. He was impressed by the time and motion studies work of American F.B. Gilbreth. Ueno was strongly impressed by the scientific management of Taylor also. 

Ueno emerged as an enlightened  diffuser of this efficiency and he became a management consultant and, author, teacher, and  thinker.

Technique and way of thinking of Ueno developed into  Japanese-style efficiency improvement movement.  Ueno  showed interest for applied study and industry efficiency.  He saw an article on way to study human movement and a  photograph in an  American magazine during university attendance at school in around 1907. He got interested  and  sent a letter to Gilbreth, who is the founder of Motion Study directly. There was repeat correspondence afterward and the friendship deepened. Mrs. Gilbreth was also a psychologist and she sent  many documents to Ueno.  Ueno made full use of it and published  "psychology of person and business efficiency" from  the content in 1919. He introduced time and motion studies of work in that publication.

Furthermore,  Ueno met Gilbreth, when Ueno went for European and American inspection on behalf of the Ministry of Agriculture and Commerce in 1921.

In the meeting of The Society of Industrial Engineers held in Chicago, Gilbreth let Ueno give a talk about "Japanese efficiency exercise" and did not spare praise. He invited Ueno as the  first honorary member of SIE committee.  Yoichi Ueno felt great joy on this honor. Friendship  with Mrs. Gilbreth followed after Gilbreth's death in 1924.

There was Scientific Management special feature in extra edition of the magazine "business world." Ueno was asked by Jujiro Izeki, the chief editor to write on Taylor's administration. The "Secret to omit useless trouble" and  the works of Yukinori Hoshino  (1912 through 1913)  and Toshiro Ikeda published earlier were updated by Ueno (checked the correctness of the translation). 

From Translating  Documents to Introducing Practical Improvement of Factory Efficiency


In a lecture, Ueno was  asked by the manager of Lion Tooth Brushing main office  to come and study factory efficiency for work improvement of bag filling factory of tooth brushing  powder in year 1920. Ueno had experience with reading and writing only and had no practical experience in real efficiency improvement until then. It was written  that he was not able to sleep the previous night. Next day, he has to use stop watches. Ueno observed using stopwatch 15 girl workers, changed the places for the assembly line, established breaks of 15 minutes at 10:00 and 3:00. He reduced the actual working hours of the day by one hour. He succeeded in increasing the amount of production by 20% per  day. Reduced the use of space by  30% and showed savings in work-in-process inventory.

And he emphasized that profit brought about by such an efficiency study has to be distributed into shares for owners, managers, consumers, workers.  Japanese commentators were  right to say a  pioneer figure of management consultancy arrived in Japan.

The example of this Lion Tooth brushing factory was illustrated  in Osaka "factory administration class" hosted by the chamber of commerce in 1921. It impressed Osaka chamber of commerce vice-president Taichi Nakayama and the relationship was established. It resulted in consulting firms, such as Nakayama sun temple (club cosmetics), FUKUSKE tabi  and the results of these studies spread to other firms and they also came forward to seek improvement in factory efficiency. The Osaka success transformed Ueno from a   translator of scientific management knowledge to the stage of scientific management practitioner and consultant. He took charge as temporary efficiency section manager at the Osaka Mint Bureau and he continued this duty for several years spending an average of three days in month from 1925.  Understanding and support of Taichi Nakayama in particular are said to have contributed to the practice and study of industrial efficiency of Ueno very much.

The establishment of cooperation society - industry efficiency research institute


Sakae Shibusawa and  Iesato Tokugawa became promoters to deal with labor movement that developed soon after World War I in 1919. A foundation was established as research engine to plan cooperation and harmony of the labor and management as super hierarchic engine of semi-governmental management.

In fact, ILO (I.L.O.) was established in 1919 and Japan joined it  promptly in the same year. It is also in the same year that cooperation society was established.

Ueno  prepared for the industrial efficiency research institute establishment in cooperation society saying that efficiency improvement of factory included base of union-management cooperation. He was designated unofficially as the director. Cooperation society pushed forward this establishment preparations. In the meanwhile, the Ministry of Agriculture and Commerce deputed  Ueno for European and American factory inspection study.  Ueno was appointed as Director, cooperation society industry efficiency research institute in 1922, at the age of 39 years. The institute worked on the principle that cooperation was a management issue and not a legal issue. (Please remember cooperation between manager and worker is a principle of scientific management of F.W. Taylor. Managers have to strive to establish cooperation between them and workers.)

However, with the Great Kanto Earthquake of 1923, this institute was closed. But a new establishment, Nihon Sangyo efficiency research institute was started in cooperation hall in 1925. Ueno continued his study, publication, lectures, classes, consultation, diagnosis about efficiency and training.

Ueno started Branch of Taylor Society in the Institute of Industrial Efficiency in 1925.  Ueno is the managing director of the society (Bulletin of the Taylor Society, August 1925, p. 202)

Start of Japanese efficiency alliance society


In Osaka, Kanagawa, Hamamatsu, Aichi, Ehime, Hyogo, and Tokyo efficiency meetings and efficiency studies were taking place.  A Japan efficiency alliance society was started as a nationwide coalition of these groups in 1927 and Ueno became its President.  A monthly "industry efficiency" was published.

In 1929, he attended the scientific management international Committee meet (CIOS) as representative of alliance society globally. He organized United States industry inspection team by invitation of the Taylor Association Headquarters in 1930. He thought of the plan of "efficiency handbook" for scientific management for Japan. He planned for the publication of "the Taylor complete works" in the context of  Japanese circumstances. The publication involved laborious work and it needed seven years before completion in 1941.  It was an extremely valuable document in history of management efficiency of Japan. Takuo Godou and Okiie Yamashita sent prefaces to this "efficiency handbook" and praised it.

The Japanese Management Association was established on March 30, 1942 as the sole nationwide private organization for the promotion of technology, after the dissolution and integration of the Japan Management Federation established by Ueno (established in 1927) and the Japan Industry Association (established in 1931). These two were regarded as the leading organizations for the promotion of “noritsu (efficiency)” through scientific management approach in Japan at the time.

However, Ueno established Japanese efficiency school in the ground of Todoroki, Tokyo in April of the year and then started current industrial efficiency junior college, forerunner of Sanno Institute of Management. Japan Management Association was started with  Takuo Godou as chairperson, and President Kakuzo Morikawa  as President. Ueno participated in this as Counselor.

Incarnation of original efficiency concept


In 1935, Ueno launched monthly magazine called "ochibo" from Nihon Sangyo efficiency research institute, and explained his way of thinking about efficiency.
 
(1) What kind of thing is efficiency?
Efficiency means a state that is rational means every thing was done for a purpose. If resource are too big for the purpose, "it is useless (waste)" and "is impossible (to do a job)" if resources are too small for the purpose.

(2) Wrong efficiency concept

It does not force effort without reducing work content. It is not efficiency to do more by working more.

Efficiency should not increase effort. With the same effort more should be accomplished.

(3) Idea of efficiency has the same origin as Orient-like religious morality.
Without "unreasonableness,"

Efficiency means without waste. In other words, basic principle of efficiency accords with teaching of moderation of Buddha and Confucius.

(4) Scientific administration is method to discover the standard way (as standard equipment) and to enforce this standard method in the factory. (standard has the meaning of best possible and planned.)


(5) There are three in order to perform scientific administration

The first stage: Plan……Make standard
The second stage: Enforcement……Carry out (Validate) [Make sure it works in practice.]
The third stage: Control……Control enforcement in the light of standard (Do it repeatedly). Make sure it happens in the planned way every time it is done.

(6) Conquer "waste" and "irregularity" with efficiency study, and that pursuit  discovers right way.


Approach and Efficiency Way Connected to Oriental Thought


Ueno connected way of thinking of Taylor  in scientific administration to sayings of Buddhism and Confucianism.
 
It is said  to be efficiency when "we omit waste, and remove unreasonableness", "we practice  moderation", and "walk moderation". The famous Muda, Mura, Muri. Don't waste, Don't burden, Don't vary output requirements too much.

Postwar Ueno and Creativity Development


In 1946, the results Ueno, showed over  more than 40 years were evaluated from both the United States and Japanese Government. He was 64 years old at that time.

He contributed to efficiency school resumption (1946) in Japan, the establishment (1950) of industrial efficiency junior college, organization (1949) of federation of all-Japan efficiency, the establishment (1951) of Japan management consultant society.

It is about 1955, he published general enlightenment book and technical book "development of originality" in sequence. The theme called creativity development was the last of Ueno's publication and in that he approached issues like "what is human being?", and, "science for solution to the problem."

He prophecied that a time will come,  when we can export views on Japanese efficiency to the United States. Ueno breathed his last in as 74 year old man in October, 1957.

The success of Toyota in cost reduction, productivity improvement, and international competitiveness and its celebrated Toyota Production System, fulfilled the dream of Yoichi Ueno. The success of Toyota is built on the sustained efforts many Japanese persons who understood Taylor and Gilbreth's writings and improvised them in implementing them in Japanese companies.


A new article - Very useful.
"Efficiency Way"  - Discusses Ueno's 5S and 10 Lessons .
Ueno published “Efficiency Way and Lessons” in 1936.  Ueno combined “Scientific Management” and Eastern philosophies in this book. It consists of five ways and ten lessons,

Hide Oba
Toyota Production System Coach | Lean Manufacturing Expert | Kaizen Leader | Operational Excellence | Competitive Advantage in Operations | Global Change Agent | Practical Coach
July 13, 2023


Bibliography

http://www.jma.or.jp.e.is.hp.transer.com/activity/series01-03-01.html

http://www.jma.or.jp.e.is.hp.transer.com/activity/series01-03-02.html

http://www.jma.or.jp.e.is.hp.transer.com/activity/series01-03-04.html

https://www.jstage.jst.go.jp/article/jrbh1984/4/0/4_0_50/_article

http://www.grips.ac.jp/forum-e/pdf_e12/JICA&GDFReport_Ethiopia_phase1/Kaizen_National_Movement/Kaizen_ch2.pdf

http://www.jma.or.jp.e.is.hp.transer.com/activity/series-01.html

Management, Education and Competitiveness: Europe, Japan and the United States
Rolv Petter Amdam
Routledge, 15-Apr-2013 - Business & Economics - 288 pages
https://books.google.co.in/books?id=PQYLQxgG_UQC

Related articles























Evolution of Industrial Engineering and Productivity Management - Part 2 - Contribution of Barnes, Maynard and Mogensen

 

Ralph Barnes was born in Clifton Mills, West Virginia on October 17, 1900.

He went to West Virginia University for his BS (1923) and his ME(1928).  He received his MS (1924) and PhD. (1933) from Cornell University.

Ralph was the first recipient of a PhD  (1933) in Industrial Engineering from Cornell, and also the first in the United States.

He worked in US window Glass (1923), Bausch and Lomb Optical Co, (1924-25), and  Gleason Works (1925-26). He also worked in Eastman Kodak during 1926-30.

He taught at the University of Illinois (1926-28), the University of Iowa (1928-1949), and UCLA from 1949-1968, and was a professor emeritus until the 80s.  He died in Los Angeles November 4, 1984.

Research papers by R.M Barnes - University of Iowa

He wrote the popular text book "Motion and Time Study" which is published  by John Wiley and Sons.

He was awarded the Gilbreth medal.

During World War II,  he did consulting on the layout for the Hanford Nuclear Plant and worked for Armstrong Cork Company which made wings for the Corsair airplane.


http://wf-eng.slerahosting.com/html/barnes.html

Important Ideas Promoted by Barnes

Motion and Time Study is a only part of Industrial Engineering.


Motion and Time Study is not the entire field of industrial engineering. In recent years, there has been a tendency in this direction.  P.6, Third Edition, 1949.

Above statement is very important. Industrial engineering neglected the engineering aspect of IE and focused more on human effort industrial engineering. When workers opposed this exclusive focus on them to increase productivity (they felt uncomfortable and unnecessarily painted as villains) IE has to no ground to defend. Psychologists and sociologists took the side of workers and criticized IE practices. IEs had no answer and beat a retreat. The point indicated by Barnes was not corrected even now in IE discipline. 

--------------------



https://www.youtube.com/watch?v=Z_Hv0JH9OkQ 

For the content in slides
Engineering in Industrial Engineering - Engineering ++ = Industrial Engineering

Presentation in International Conference on Industrial Engineering - 2019, SVNIT Surat
--------------------

Computers in Industrial Engineering Methods


Ralph Barnes, in his seventh edition of Motion and Time Study devoted two chapters to explain the role of computers in industrial engineering. Chapter 25 is titled “computer aided time study.” Chapter 26 is titled “computerized machine and equipment downtime monitoring and reporting” [Barnes]. Time study is an important method in IE and it is important to notice that in 1980 itself, the role of computers was discussed in time study. In the area of layout planning also, computer methods existed during the 70s. 


Industrial Engineering - Role of Engineering, Mechanization and Automation


In process improvement study or projects, to do a task in the most productive manner, the most efficient manual method (best manual method), best mechanized method and best automation method are to be compared and the most productive method has to be employed. This comparison has to be done at element or suboperation level.

Source: Book: Motion and Time Study: Design and Measurement of Work, Ralph M. Barnes, 7th Edition, Chapter 18. Motion Study, Mechanization, and Automation.

Experiments on Principles of Motion Economy


Barnes conducted number of research studies to gather evidence regarding principles of motion economy given by Frank Gilbreth. He devoted three chapters in his book to explain the principles in detail and made motion films also to show examples.

Principles of Motion Economy - Details - R.M. Barnes


















Tuesday, June 3, 2025

Toyota Motors - Industrial Engineering - Result Toyota Production System - Taiichi Ohno Books

 Taiichi Ohno Book - Toyota Production System


Quotes from Above.


Japanese businesses carefully studied industrial engineering (IE), a company-wide manufacturing technology directly tied to management that was developed and applied in the United States.


When first introduced, it was pointed out that the Toyota production system was method engineering (ME), not IE.


TPS is Industrial Engineering System of Toyota Motors.

IE is a system and the Toyota production system may be regarded as Toyota style IE.


Toyota style IE is mekeru or profitmaking IE, known as MIE. 
Unless IE results in cost reductions and profit increases, I think it is meaningless.


Essentially, an industrial engineer studies systematic approaches to improvements.


It is my wish that the Toyota production system born and raised at Toyota Motor Company be comparable or superior to the American IE's business management and manufacturing system.


Industrial engineering (IE), a company-wide manufacturing technology directly tied to management that was developed and applied in the United States.

We are very happy that the Toyota production system has become, as I intended, a company-wide manufacturing technology directly tied to management.

--------------------------------


Industrial Engineering Theory and Practice is the foundation for development of Toyota Production Sysem. Taiichi Ohno, the engineering manager responsible for complete development of TPS clearly stated the importance of industrial engineering.

Advocating Profit-Making Industrial Engineering  



After World War II, in the world of industry, America was, without dispute, the leader. Catching up with and surpassing America was not a job to be done in a day. To catch up, the shortest route was to buy advanced American technology. So, aggressive Japanese businesses imported and adopted America's high-level production and manufacturing technology. In academia and business, a great number of American business management techniques were also studied and discussed. In that endeavor, Japanese businesses carefully studied industrial engineering (IE), a company-wide manufacturing technology directly tied to management that was developed and applied in the United States.

Defining industrial engineering seems to be fairly difficult. When first introduced, it was pointed out that the Toyota production system was method engineering (ME), not IE. 

To me, IE is not a partial production technology but rather a total manufacturing technology reaching the whole business organization. In other words, IE is a system and the Toyota production system may be regarded as Toyotastyle IE.

What is the difference between traditional IE and the Toyota system? 

In brief, Toyotastyle IE is mokeru or profitmaking IE, known as MIE. Unless IE results in cost reductions and profit increases, I think it is meaningless. In Toyota, industrial engineering is done to register a decreased in cost and increase in profit of the enterprise.

There are various definitions of IE. A former head of the American Steel Workers' Union defined its function as that of entering a plant to improve methods and procedures and to reduce costs. And this is exactly so.

"IE is the use of techniques and systems to improve the method of manufacturing. In scope it: ranges from work simplification to large-scale capital investment plans."'

"IE has two meanings. One aims at improving work methods in the plant or in a particular work activity. The other one means the specialized study of time and action. However, this is the work of a technician. Essentially, an industrial engineer studies systematic approaches to improvements. "

I would like to add a definition from the Society for Advancement of Management (SAM), an organization that succeeded the Taylor Society:

Industrial engineering applies engineering knowledge and techniques for the study, improvement, planning, and iniplementation of the following:

1. method and system,

2. qualitative and quantitative planning and various standards including the various procedures in the organization of work,

3. measuring actual results under the standards and taking suitable actions.


This is all done to exercise better management with special consideration for employee welfare, and it does not restrict business to lowering the cost of improved products and services.'

I have listed various IE definitions, each saying good things, because they are useful references. However, in private business, implementing IE effectively is not easy.

I call Toyota's industrial engineering profitmaking IE and it is my wish that the Toyota production system born and raised at Toyota Motor Company be comparable or superior to the American IE's business management and manufacturing system.

We are very happy that the Toyota production system has become, as I intended, a company-wide manufacturing technology directly tied to management. And, fortunately, it is extending to the outside cooperating firms as well.

In the book, Ohno spent considerable space to explain what is IE and how it is being made use of in Toyota Motors to identify and reduce waste and decrease cost and increase profit.

Toyota used all theories and practices of industrial engineering in its cost reduction effort. But its innovations standout as pillars. They are unique to Toyota and from their use at Toyota only, they spread to others companies.


Cost Reduction through Productivity Improvement - Objective and Slogan of Industrial Engineering.


Productivity Improvement through Waste Elimination - Means and Slogan of Toyota Industrial Engineering (TPS).


The themes presented in the first three chapters


1. Starting from Need - Page 24


► "Catch Up with America"

► Just-In-Time

► Using a Common-Sense Idea

► Give the Machine Intelligence

► The Power of Individual Skill and Teamwork

► Cost Reduction Is the Goal

► The Illusion of Japanese Industry

► Establishing a Production Flow

► Production Leveling

► In the Beginning, There Was Need

► A Revolution in Consciousness Is Indispensable    


2. Evolution of the Toyota Production System


Repeating Why Five Times

► Complete Analysis of Waste

► My Plant-First Principle

► Writing the Standard Work Sheet Yourself

► Teamwork Is Everything

► The Skill of Passing the Baton

► An Idea from the U. S. Supermarket

► What Is Kanban?

► Incorrect Use Causes Problems

► Establishing the Flow Is the Basic Condition

► Use Your Authority to Encourage Them

► Mountains Should Be Low and Valleys Should Be

Shallow

► Challenge to Production Leveling

► Production Leveling and Market Diversification

► Kanban Accelerates Improvements

► Carrying Carts as Kanban

► The Elastic Nature of Kanban


Chapter 3 . Further Development 


An Autonomic Nervous System in the Business Organization


► Provide Necessary Information When Needed

► The Toyota-Style Information System

► Fine Adjustment

► Coping with Changes

► What Is True Economy?

► Re-Examining the Wrongs of Waste

► Generate Excess Capacity

► The Significance of Understanding

► Utilizing the Full Work System

► Do Not Make a False Show

► Required Numbers Are All-Important

► The Tortoise and the Hare

► Take Good Care of Old Equipment

► Look Straight at the Reality

► 0. 1 Worker Is Still One Worker

► Management by Ninjutsu

► In an Art Form, Action Is Required

► Advocating ProfitMaking Industrial Engineering

► Surviving the Slow-Growth Economy



I. Starting From Need

► "Catch Up with America"



The Toyota production system evolved out of need. Certain restrictions in the marketplace required the production of small quantities of many varieties under conditions of low demand, a fate the Japanese automobile industry had faced in the postwar period. These restrictions served as a touchstone to test whether Japanese car manufacturers could establish themselves and survive in competition with the mass production and mass sales systems of an industry already established in Europe and the United States.

All kinds of wastes occur when we try to produce the same product in large, homogeneous quantities. In the end, costs rise. It is much more economical to make each item one at a time. The former method is the Ford production system and the latter is the Toyota production system.

We kept reminding ourselves, however, that careless imitation of the American system could be dangerous. Making many models in small numbers cheaply -wasn't this some thing we could develop? And we kept thinking that a Japanese production system like this might even surpass the conventional mass production system. Thus, the principal objective of the Toyota production system was to produce many models in small quantities.

America has generated wonderful production management techniques, business management techniques such as quality control (QC) and total quality control (TQC), and industrial engineering (IE) methods. Japan imported these ideas and put them into practice. The Japanese should never forget that these techniques were born in America and generated by American
efforts.


15 August 1945 . Japan lost the war. Toyoda Kiichiro, President of the Toyota Motor Company said, "Catch up with America in three years. Otherwise, the automobile industry of Japan will not survive"


President Toyoda was saying that we should catch up in three years, but it would be very difficult to raise productivity by eight or nine times in such a time period to equal labor productivity of US.. It meant that a job then being done by 100 workers had to be done by 10 workers.  But could an American really exert ten times more physical effort to give more productivity? Not, possible.  Surely, in  Japanese systems, we are wasting something (not using right equipment, right way of using equipment etc.) If we could eliminate the waste, productivity should rise by a factor of ten. This idea marked the start of the present Toyota production system. Waste elimination became a dominant objective and slogan.


Cost Reduction is the Goal


Frequently we use the word "efficiency" when talking about production, management, and business. "Efficiency" means cost reduction. At Toyota, profit can be obtained only by reducing costs.  We cannot set prices based on our costs.  Consumer sets the price and if the manufacturer sets a higher price due to his high manufacturing cost, the consumer will simply turn away. Cost reduction has to be the goal of manufacturers. The management has to develop human resources ability to its fullest capacity to best enhance creativity, and fruitfulness, to utilize facilities and machines well, and to eliminate all waste.


Cost Reduction through Productivity Improvement - Objective and Slogan of Industrial Engineering.


Productivity Improvement through Waste Elimination - Means and Slogan of Toyota Industrial Engineering (TPS).




Developments in Toyota Motors in the Initial Years

Restatement in chronological order  (Under Progress)



In 1911, Toyoda Sakichi toured Europe and the United States. Prior to that, under adverse and complicated circumstances, he quit the Toyoda Spinning and Weaving Company. But in America, when he saw the Northrop and Ideal System automatic loons, deemed the period's outstanding achievements, he recognized the superiority of his own inventions. Thus, after traveling abroad, he reestablished himself and again demonstrated his unyielding spirit.

At that time in America, he also saw cars. He decided at once to go into automobile manufacturing after the automatic loom. In his mind, his looms and the automobile were strongly connected.


Toyoda Sakichi's mission in life, business, and the world was to cultivate and train the natural intellect of the Japanese people, sell original Japanese products produced by this intellect, and increase the national wealth of Japan.


Before his involvement with automobiles, Toyoda Kiichiro worked with weaving machines. In the early days, Toyoda Kiichiro worked busily at Toyoda Sakichi's feet developing and commercializing the automatic looms, selling them to foreign businesses, and negotiating contracts, and so forth.

Although interested in automobiles from the start, it was perhaps during his tour of Europe and America in 1930, when he went to England to negotiate with Platt Brothers, that he was most strongly influenced. New York especially must have shocked him with its flood of cars.

When Toyoda Kiichiro returned home,  Toyoda Sakichi instructed him to spend the Y I million from Platt Brothers on automobile research, an amazing act of courage and foresight. Toyoda Kiichiro must have been filled with  a sense of responsibility when he received the instructions.


In 1933, Toyoda Kiichiro announced the goal to develop domestically produced cars for the general public:


"We shall learn production techniques from the American method of mass production. But we will not copy it as is. We shall use our own research and creativity to develop a production method that suits our own country's situation."


I believe this was the origin of Toyoda Kiichiro's idea of just-in-time.


Toyoda Kiichiro had to narrow the gap between the Japanese and American automobile industries and create a domestic production system, he had to explore ways to learn the basic technology, master the different production technologies, organize the production system, and find a uniquely Japanese production technology.


Toyoda Kiichiro recognized that the market always demands reasonably priced products. Today's problem, however, is that, regardless of how good a car we make, it will mean nothing unless we make it economically. This problem eventually relates to price. 


Toyoda Kiichiro must have clearly envisioned Justin-time as the first step in the evolution of a Japanese production system. It is, in fact, the starting point of the Toyota production system, constituting its skeletal structure.



Pursuit of a Japanese-Style Production Technique

Toyoda Kiichiro's mission, while laying the foundation of the automobile business, was to develop a Japanese production technique. This required intelligence.


► Toyotaism with a Scientific and Rational Nature

"Toyotaism" was established by Toyoda Kiichiro. He placed the following conditions on the automobile business:

• To provide cars for the general public

• To perfect the passenger car industry

• To make reasonably priced cars

• To recognize the importance of sales in manufacturing

• To establish the basic material industry

Toyoda Kiichiro wrote an article, published in September 1936, entitled "Toyota to the Present" that provides a good description of Toyotaism. In the following excerpt, he makes some provocative points:


At last, Toyota cars are out on the market. The cars were born from the intense research of numerous people, a synthesis of ideas from different fields, and from dedicated efforts and countless failures over a long period of time.


We started work early on engine design and research. Most preparation was finished in 1933, and on September 1,  we formally became an automobile production company


Since formally deciding to go into car manufacturing, what have we done? ... I will describe some of our preparations of the past three years.


Is it even possible for Japan to make the materials required?  Professor Honda Kotaro said that, at present, Japan did have the capability and that there was no need to hire foreigners. Greatly relieved, I immediately set out to build a steel mill.


Some visitors to our company ask what percentage of our cast products pass the quality test. To sustain the business, 95 percent must pass. We failed many times before successfully blowing cylinders into the dies using die presses with a pass ratio of over 90 percent. We eventually succeeded.

After making 1,000 pieces of an item, most workers become fairly skilled and defect-free. But the first several 100 pieces will contain some good and some bad. Until skills are established, we have to be prepared to discard anything borderline. This is how materials problems are satisfactorily solved.


In 1933, Toyoda Kiichiro announced the goal to develop domestically produced cars for the general public:


"We shall learn production techniques from the American method of mass production. But we will not copy it as is. We shall use our own research and creativity to develop a production method that suits our own country's situation."



Toyoda Kiichiro once told Toyoda Eiji that the best way to work in an automobile assembly plant would to have all parts for assembly at side of the line just in time for their use. The words "just-in-time" attracted many managers of Toyota and Ohno was also attracted by those words.


Evolution of the Production System in Toyota Based on Japanese Thinking and American Thinking -Toyota Production System


Cost Reduction is the Goal


Frequently we use the word "efficiency" when talking about production, management, and business. "Efficiency" means cost reduction. At Toyota, profit can be obtained only by reducing costs.  We cannot set prices based on our costs.  Consumer sets the price and if the manufacturer sets a higher price due to his high manufacturing cost, the consumer will simply turn away. Cost reduction has to be the goal of manufacturers. The management has to develop human resources ability to its fullest capacity to best enhance creativity, and fruitfulness, to utilize facilities and machines well, and to eliminate all waste.

The evolution of the production system in Toyota right from the beginning was guided two special ideas termed  as pillars by Ohno. One is JIT and the other is Autonomation.

Idea of production flow in reverse:


A later process goes to an earlier process to pick up only the right part in the quantity needed at the exact time needed. It will indicate what and how many are needed when they come next. 


We will call this means of indication kanhan (sign board) and circulate it between each of the processes to control the amount of production - that is, the amount needed. This was the beginning of the idea.

We experimented with this and finally decided on a system. The final assembly line is taken as the starting point. On this basis, the production plan, indicating the desired types of cars with their quantity and due date, goes to the final assembly line. To supply parts used in assembly, a later process goes to an earlier process to withdraw only the number of parts needed when they are needed. In this reverse way, the manufacturing process goes from finished product back to the earliest materialsforming department.


1945 - JIT - Just in Time was identified as the need. Every body was thinking how to do it. Ohno is also a manager thinking about it.


1945 - 71 - Setup Time Reduction

1945 - 55 -  Set ups on Die Presses were taking 2 to 3 hours.

1962 - Main plant set up 15 minutes

1971 - Main plant and Motomachi setups 3 minutes.


Supply of Parts and Withdrawal - Warehousing

1948 - Withdrawal by subsequent processes started. - Pull

1949 - Intermediate warehouses abolished

1953 - Supermarket system in machine shop

1958 - Warehouse withdrawal slips abolished


----------------------------

Summary of What Taiichi Ohno Shared in His Book


I. Starting From Need


During the 15-year period beginning in 1959-1960, Japan experienced unusually rapid economic growth. As a result, mass production, American style, was still used effectively in many areas.

We kept reminding ourselves, however, that careless imitation of the American system could be dangerous. Making many models in small numbers cheaply -wasn't this some thing we could develop? And we kept thinking that a Japanese production system like this might even surpass the conventional mass production system. Thus, the principal objective of the Toyota production system was to
produce many models in small quantities.

"Catch Up With America" Toyoda Kiichiro (1894-1952)


15 August 1945 . Japan lost the war. Toyoda Kiichiro, President of theToyota Motor Company said, "Catch up with America in three years. Otherwise, the automobile industry of Japan will not survive"


Just-In-Time


The basis of the Toyota production system is the absolute elimination of waste. The two pillars needed to support the system are:

Just in time
Autonomation - Intelligent machine that does not produce defect and also stops on it own. Also intelligent operator that do not produce defective parts and investigate and remove the root cause whenever a defective part is produced.

Just in time system eliminates one of the seven wastes specified by Ohno. In an assembly flow process, the right parts needed reach the appropriate place at the time they are needed, inventories can be reduced drastically even up to zero. But to reach the JIT ideal, many existing conventional management methods have to be changed.

Using a Common-Sense Idea

The common sense idea is making only those components demanded or used by the downstream process.

Ohno said, I am fond of thinking about a problem over and over.  The normal planning and production process is for the component producer to produce as per plan and keep it inventory for the assembly department to draw when needed. But Ohno changed this method. Assembly department will go and take what they want and component department has to replenish that component only. So component department has no independent plan. Only assembly department has the plan. Every link in the production flow process or chain is connected with this method and synchronized. With this practice, the management work force is reduced drastically. This information system is given the name kanban.

Give the Machine Intelligence


At Toyota,  machines automated along with an automatic stopping device in case of a problem
 are utilized. In this way, human intelligence is given to machines. The machine stops in case of a problem and the management will come to know of it. Expanding the rule, even operators are asked to stop the flow, if there is a problem. Rapid counter measures are taken to prevent recurrence of a problem.

The Power of Individual Skill and Teamwork


A champion team must have good teamwork and people with individual skill. Likewise autonomation is individual machine skill and JIT is teamwork.

Cost Reduction is the Goal


Frequently we use the word "efficiency" when talking about production, management, and business. "Efficiency" means cost reduction. At Toyota, profit can be obtained only by reducing costs.  We cannot set prices based on our costs.  Consumer sets the price and if the manufacturer sets a higher price due to his high manufacturing cost, the consumer will simply turn away. Cost reduction has to be the goal of manufacturers. The management has to develop human resources ability to its fullest capacity to best enhance creativity, and fruitfulness, to utilize facilities and machines well, and to eliminate all waste.

The Illusion of Japanese Industry


Japanese industry believed in mass production. Till 1973 oil crisis, Japanese manufacturers had the illusion that this system fits their needs


Establishing a Production Flow


Establishing production flow in machine shop was difficult. But in 1947, Ohno arranged machines in a flow order and tried having one worker operate three or four machines (different machines). Even though working time did not go up, operators did not like the new system. Also Ohno wrote, that many adjustments that an operator has to make to machine created difficulties for the operators.  Hence, Ohno said he became patient to implement the system even though he was convinced that the direction was right.

Production Leveling


We got the idea that we should spread production evenly throughout the workday.  We wanted to get away from having to produce everything around the end of the month.

In the Beginning There was Need.


The key to progress in production improvement, I feel, is letting the plant people feel the need.
Opportunities to take care of the needs are always there. Once a need if felt, we just have to drive ourselves to find the practical opportunities that satisfy the needs.

A Revolution in Consciousness Is Indispensable


A person in business may feel uneasy about survival in this competitive society without keeping some inventories of raw materials, work-in-progress, and products. But Ohno says a revolution in consciousness is needed to realize that overproduction and the consequent inventory is a waste that has to be eliminated rather than accumulated.

2. Evolution of the Toyota Production System


Repeating Why Five Times


By asking why five times and answering it each time, we can get to the real cause of the problem, which is often behind behind more visible symptoms.

May be we can interpret it as  prevention - appraisal - failure model. We see failure. We need to know ways to prevent the event very early in the event sequence.

Complete Analysis of Wastes


Improving efficiency makes sense only when it is tied to cost reduction. The efficiency of each operator has to be improved, each production line has to be improved and efficiency of the entire plant has to be improved due to them.

       Waste of overproduction
       Waste of time on hand (waiting)
       Waste in transportation
       Waste in processing itself
       Waste of stock on hand (inventory)
       Waste of Movement
       Waste of making defective products

Ohno made the statement that eliminating these seven wastes completely can improve the operating efficiency by a large margin. To eliminate these wastes, we must make only the quantity needed, thereby releasing extra manpower. Management has to identify excess manpower and utilize it effectively in other activities. Eliminating wasteful and meaningless jobs and creating useful jobs enhances the value of work for workers.


My Plant-First Principle


A proper work procedure cannot be written from a desk. It must be tried and revised many times in the production plant. Production managers have to be in the plant which is a major source of information.

Writing the Standard Work Sheet Yourself


Standard work sheet is basis for all improvements in Toyota production system. Improving machining processes, improving tools, improving transportation processes, and optimizing the inventory, rearranging machines, all such things are implemented through standard work sheets only. The job of the field supervisor, section chief or group foreman is to train workers in standard work. The trainer must actually take the hand of the worker and teach them. Workers of a team also help their team members.

Teamwork is Everything


Team work is essential in manufacturing also like many of the sports. Assigning responsibility to individuals is not sufficient. Teamwork is essential.

The Skill of Passing the Baton
The work area is like track relay. There is a wide area in which baton can be passed.
       Mutual Assistance Campaign

An Idea from the U.S. Supermarket


The communication system of Toyota is Kanban and Ohno got the idea for it from watching the transactions in Supermarkets of USA. At supermarkets buyers buy what they need.  Supermarkets have to facilitate it.

The idea of supermarket was implemented in Toyota and to avoid a situation wherein large quantity of a component is demanded suddenly, production leveling was also introduced.

What is Kanban?


         Kanban is a method for communicating production and use related messages among the plant personnel. Its most frequently used form is a piece of paper contained in a rectangular vinyl envelope. It contains 1. pickup information 2. transfer information and production information.  The kanban method is used for information flow vertically and laterally within Toyota itself and between Toyota and its supply partners.

Kanban is autonomic nerve of the production line.

(The word Kanban literally means visible record).

Incorrect Use of Kanban Causes Problems


Incorrect use of Kanban system causes problems. Close supervision of the kanban rules is required to derive best results from it.

1. An assembly process (more generally later process) can pick up items only in the quantity specified in the kanban from the earlier process. So the quantity the assembly process can pick up at a time is specified in the kanban system.
2. Earlier processes produce items in the quantity specified in the kanban which is provided by the later process after withdrawing the item from stocks of earlier process.
3. No items are withdrawn or transported or produced without a kanban indicating it.
4. All items have to move with an attached kanban.
5. Defective items cannot be sent ahead from any processing station. The assembly line can be stopped if there are no defect-free components or assembly in process. But a defective item cannot move forward.
6. Reducing the batch quantities indicated in the Kanban would make the system more sensitive and makes the system more synchronized.



The Talent and Courage to Rethink What We Call Common Sense


Productivity improvement ideas may come but implementing them requires understanding by top management. The ideas when they defy the present conventional thinking or common sense, requires much more understanding the by the top management and the greater the commitment of top management, the more successful will be the implementation.

Ohno wrote that he came up with many revolutionary ideas and implemented them. They were sometimes regarded as high handed. But Toyota's top management watched the situation quietly and allowed Ohno to implement them.

In 1963 only JIT was extended to outside suppliers. Till that only internal production was handled on JIT basis.

Establishing the Flow is the Basic Condition


Toyota helped its suppliers or cooperating firms to set up flow systems first. Then Kanban system was introduced.

Kanban is the communication tool for implementing or realizing JIT. This tool works well when all the supporting processes are flow processes. So flow process is a basic condition for realizing JIT through Kanban communication system.  The other important conditions are levelled production (eliminating surprise withdrawals of components) and working using standard work methods

Use Your Authority to Encourage Them,


Ohno said his ideas were not understood and hence not used initially by many. But he applied them in his department and when he was given more departments to manage, or was shifted to other departments, he implemented them there also, till Kanban became a company wide practice.

Mountains Should be Low and Valleys Should be Shallow


There must be efforts to level the production during the year. The mountains should be low and valleys should be shallow as much as possible and sales department has to strive for more uniform sales.

Challenge to Production Leveling


TPS works for production leveling during the year, the month and even a day. If 250 sedans, 125 hardtops, and 125 wagons are made daily, in assembly there are done in the sequence One sedan, one hard top, one sedan and then wagon etc. That gives a lot size of one. But lot size of one was not achieved overnight in various shops. In a die-press, in 1940 changing the die took to two or three hours. With such a die changing time, one cannot make small lots. So a decision was taken to make efforts to decrease the die changing times. During 1950s, the die change time went down to one hour. Then it was further reduced to 15 minutes. By late 1960s, the die changing time was drastically reduced to 3 minutes.

The challenge to production leveling and small lots was high set up times. The need for quick die changes was generated or identified and steps were taken to understand the issue and develop a solution.  This problem was not attempted earlier. To do this, initial solutions were developed and the workers were trained. But subsequently, the enthusiasm spread and everybody chipped in with suggestions and method improved beyond the initial description. The system became the product of the effort of large number of people.

Product Leveling and Market Diversification


Ohno emphasized that production leveling (small batch quantity) is much more advantageous than the planned mass production system (larger batch quantity) in responding to the diverse demands especially of the automobile market.

Product leveling or small batches is more advantageous to respond to the market diversification. But still, leveling becomes more difficult as diversification develops. Toyota copes up with this problem well enough and keeps market diversification and production leveling in harmony.  In this endeavor, it is important to avoid the use of dedicated facilities and equipment and also equipment that has very general utility. It is important to put in effort and develop specialized, and yet versatile production processes through use of machines and jigs that can handle minimal quantities (Lot sizes of one). It is difficult but we must utilize all available knowledge to avoid undermining the benefits of mass production.

Kanban Accelerates Improvements

Carrying Carts as Kanban

The Elastic Nature of Kanban


3. Further Development


An Autonomic Nervous System in the Business Organization


Ohno says that human body has autonomic nerves that work as instant reflux to certain external stimuli and motor nerves that work under the command of the brain.

Similar to that in TPS, worker make some decisions without the involvement of production control or engineering departments. Production control and engineering departments are the brain of the organization.

In TPS workers stop the plant when problem occurs, decide the sequence to follow in making parts and also decide when overtime is necessary. They need not involve brain in reacting to some small changes in plans.

Provide Necessary Information When Needed


Computers should not be bought and used indiscriminately. It should not lead to higher costs. Processing customer orders and information on market needs and wants by computers can be very effective. But  kanban communication system is more effective in production communication.

The Toyota Style Information System


Toyota does production planning like other companies.  It has an annual plan, say for instance making 2 million cars in the year.  Next, there is a monthly plan, announced a month ahead. Based on the monthly plan daily production schedule is established and this is based on production leveling. Each production line is informed of the daily production quantity. But the daily sequence schedule (sequence of models and color) is sent to only one place - the final assembly line.

The production order for a specific car is issued to the process 1 of the assembly line. This production order will have all the information needed for its production and the workers in the following assembly  processes can tell which parts to use by at the car this  production order attached to car. Workers in the subprocesses can know what to do as soon as they see the car in assembly at the first stage. If needed they are sent the information directly.  Toyota makes sure the right information reaches the operators at the right time by letting the products being produced carry the information needed to assemble them.

Fine Adjustment


To cope with a constantly fluctuating market, the production line must be able to respond to schedule changes.  One day, the line may make four Car A's and six Car B's. But on another day, the ratio might turn out be the reverse - six car A's and four car B's. Such reversed ratios are followed the production line as per the information carried by the Kanban

Coping with Changes

Fine adjustment also means that mistakes are corrected immediately.

What Is True Economy?


True economy is tied directly to the survival of business. In Toyota production system, economy or efficiency is thought in terms of manpower reduction and cost reduction for making one car. Manpower reduction is a means for cost reduction, which the most critical condition for the growth of the business and its survival. The criterion for all decision making in Toyota is cost reduction.

Many improvement ideas are to be generated and each idea has to be thorougly investigated. The cost of improvement should not be more than the cost reduction. Unless, the judgment is made carefully, cost increasing improvements may be undertaken.

At Toyota, we still use many old machines, by maintaining them properly and daily, improving work methods and making layout changes. A layout must make worker activities easy and should not impede production flow.

Re-Examining the Wrongs of Waste


TPS is a method to thoroughly eliminate waste and enhance productivity. Waste refers to all activities of production that increase cost but not add any value (No increase in price takes place due to them). For example, excess people, inventory, and equipment.

The primary waste of excess people, inventory and equipment give rise to secondary wastes.  Complete understanding of waste is essential to implement TPS successfully.

Generate  Excess Capacity


If excess capacity is there, we can use it for various purposes. At Toyota, through continuous improvement, we create excess capacity first and then use it profitably.

The Significance of Understanding


Ohno emphasize the importance of thoroughly understanding production and improvement of production methods and organization and the process of manpower reduction and cost reduction.

Understanding needs an approach to examine an objective positively and comprehend its nature. Careful inspection of a production area reveals waste and scope for improvement.  Only a very close observation reveals waste and work. There are work movements which are not processing, and there are processing activities which are a waste. Manpower reduction means raising the ratio value added processing activities to 100 percent of the working time.

Utilizing the Full Work System


All sources of waste have to be detected and crushed. Waste of overproduction is eliminated in TPS by strictly adhering to standard inventory. If the standard inventory is specified as 5, on a day when it becomes 3 only 2 are produced. On a day when it becomes 4 only one is produced. We call it a full work system, when all standard inventories are replenished in a day. We do not want any overproduction in a day.

Tact Time

(Do Not Make a False Show)

Tact is the length of time, in minutes and seconds, allowed by the customer demand to make one piece of the product. Tact is obtained by dividing the operable time per day (of the machine) by the required number of pieces per day.  Operable rate in TPS refers to the time machine is available for production in a day. The ideal operable rate is 100 per cent. To achieve this, maintenance has to be regular to prevent breakdowns and setup times are to be reduced. Operating rate refers to the production per day.

At Toyota, improvements increase the production quantity per day from a group of workers. But, if excess production is not required as per demand, the number of workers are reduced from the team and only required production is made. Unnecessarily producing excess is no efficiency.

Required Numbers Are All-Important


For each production line, numbers or quantity required by the market is important. In Toyota, we do not produce extra above the required quantity in any line. The excess manpower is transferred to other lines where needed. The required number is adhered to in a disciplined way.

The Tortoise and the Hare


At Toyota we produce according to the needs of the market at slow or fast rate everyday. It is the way of tortoise. We do not run very fast some days and then take rest on other days like a hare.

Take Good Care of Old Equipment


Ohno says, the expertise of a worker increases overtime. But in case of machine, the depreciation of the machines is the popular idea. If machines are poorly maintained and driven close to death, enormous costs are incurred in replacement.  Ohno says, with adequate maintenance, machines will have a longer life.

Look Straight at the Reality

When estimating future business, Ohno recommends that one must be realistic and be ready for instant declines in business.

0.1 Worker is Still One Worker


The savings that come from automation should result in saving a full worker. Then only automation will give cost reduction. Ohno says at the design stage of the production system itself, fewer workers are to be employed. One should not employ more workers initially and then remove them when not needed.

Ohno, in this point also stresses that, they form teams of workers and do not allow only one worker to work in isolation.

Management by Ninjutsu

Management by Ninjutsu means acquiring management skills by training.

In an Art Form, Action is Required
An engineer is an artist. Art requires action not speaking.

Profit Making Industrial Engineering at Toyota


Advocating Profit-Making Industrial Engineering

Surviving the Slow-Growth Economy

4. Genealogy of the Toyota Production System


This chapter gives many passages from the thoughts and sayings of Toyota Sakichi and Toyoda Kiichiro.

Toyoda Kiichiro once told Toyoda Eiji that the best way to work in an automobile assembly plant would to have all parts for assembly at side of the line just in time for their use. The words "just-in-time" attracted many managers of Toyota and Ohno was also attracted by those words.

Taiichi Ohno had experience of cost reduction at Toyota Spinning and Weaving also. The company was implementing cost reduction measures  to catch up and surpass  Lancashire and Yorkshire companies. Toyoda Sakichi had world class view. Toyoda Kiichiro also had world class view. In the two pillars of TPS, autonomation came from Toyoda Sakichi and JIT came from Toyoda Kiichiro.

Toyoda Sakichi said that he observed a grand mother hand weaving for a full day and developed interest in developing a machine for it. Ohno likes that idea of observing on the shop floor to understand things. He wrote "Stand on the shop floor all day and watch - you will eventually discover what has to be done."

Toyoda Kiichiro visisted America and he must have thought about how surpass America's highly developed automobile production system and utter the idea of JIT.

Toyoda Sakichi talked of inventions made by Japanese efforts, knowledge and intellect. He made 100 inventions with patents.







A Global World Around Us



Two Extraordinary Characters

Learning from the Unyielding Spirit

I believe just-in-time was Toyoda Kiichiro's dying wish  - Ohno

Toyotaism with a Scientific and Rational Nature

Provide Good Equipment Even If the Factory Is Simple

Pursuity of a Japanese-Style Production Technique

Making Products That Have Value

Toyoda Kiichiro recognized that the market always demands reasonably priced products.  He wrote "We know our cars will not sell unless they are cheaper than foreign models. "We might manage to sell 50 to 100 cars per month by appealing to patriotism. But selling 200 or 500 cars per month would be difficult. In the end, prices must be competitive."

Can we actually produce economical cars domestically? Cars with proper materials and proper quality?

A Chess Player's View

In Search of Something Japanese

Witnessing a Dialectic Evolution

Toyoda Kiichiro  " we shall learn production techniques from the American method of mass production. But we will not copy it as is. We shall use our own research and creativity to develop a production method that suits our own country's situation."

I believe this was the origin of Toyoda Kiichiro's idea of just-in-time.

5. The True Intention of the Ford System


The Ford System and the Toyota System


Ohno acknowledges - Henry Ford without dispute created the automobile production system. Toyota system uses the flow system developed by Ford. But the difference is that at Ford they were concerned about warehousing the parts and moving the chassis past the warehouse. Toyota eliminated the warehouse.

Small Lot Sizes and Quick Setup


The American automobile business has continuously shown that planned mass production has the greatest effect on cost reduction. The Toyota system takes the reverse course. The slogan is "small lot sizes and quick setups." Toyota system works on the premise of totally eliminating the overproduction generated by inventory and costs related to workers, land, and facilitates needed for managing inventory.

Toyota system works on the premise of totally eliminating the overproduction generated by inventory and costs related to workers, land, and facilities needed for managing inventory.

Rapid changeovers are an absolute requirement for the Toyota Production System. Teaching workers to reduce lot sizes and setup times took repeated on-the-job training.

The Foresight of Henry Ford


Ford said what we do have to bother about is the waste of human labor.  Material in our factory represented labor. When we are wasting material we are wasting labor of some body. We will use material more carefully if we think of it as labour.  Our studies and investigations up to date have resulted in the saving of 80,000,000 pounds of steel a year and this amounts to about 3 million dollars a year.


Standard are Something to Set Up Yourself



Prevention Is Better than Healing


Toyota's strength does not come from its healing processes - it comes from preventive maintenance.

Is There a Ford after Ford?


Ohno said "I think the TPS can be applied in America where the market for many types in large quantities is there."

Toyota has learned a lot from the Ford system.

Inverse Conception and Business Spirit


Is cotton the best material we can use here?  (in seats) As an answer to this question Ford came up with flax and methods to handle it mechanically. Ohno said, "I was intrigued by Ford's question. Is cotton the best material we can use here?"  As Ford pointed out, people follow tradition. This might be acceptable in private life, but in industry, outdated customs must be eliminated. This process of aking why represents Ford's business spirit.  Ohno said reading Ford shows many such brilliant inverse conceptions.

Getting Away from Quantity and Speed

Is efficiency in production systems wrecking all the finer things in life?

Efficiency is merely doing the work in the best way you know rather than in the worst way. It is the taking of a trunk up a hill on a truck rather than on one's back. It is training of the worker and the giving to him of power so that he may earn more and have more and live more comfortably.

6. Surviving the Low-Growth Period


The System Raised in the High-Growth Period

Raising Productivity during Low Growth

Learning from the Flexibility of Ancient People

Important Terms Used to Describe Toyota Production System


Andon

Autonomation

Baka-Yoke

Baton Passing Zone

Do NOt Mkae Isolated Islands

Five Why's

Just-in-Time

Kanban

Labor Saving to Worker Saving to Reducing Number of Workers

Moving vs. Working

Multi-Process Operation System

Operating Rate and Operable Rate

Production Leveling

Profit-Making Industrial Engineering

Real Cause

Required Numbers Equal Production Quantity

Small Lot Sizes and Quick Setups

Standard Work Procedures

Stopping the Line

Tact Time

Toyota Production System

Visual Control (Management by Sight)

Waste Recognition and Elimination

Work Flow and Work Forced to Flow


Work Improvement vs. Equipment Improvement
Work productivity improvement is productivity improvement using the existing equipment. Only tools, jigs and fixtures are introduced as required in work productivity improvement.
If equipment improvement comes first, manufacturing processes will never be improved.



Ud. 2.6.2025
Pub. 30.5.2025

Sunday, June 1, 2025

Toyota Production System - Industrial Engineering - Shigeo Shingo - Summary

 

Chapter 13. The Toyota Production System in Summary


1. The Minus-Cost Principle

2. Non-Stock (JIT) - The First Cornerstone of Waste Elimination

3. Toward Flow Operation
4. Shortening Setup Changeover Times
5. The Elimination of Breakdowns and Defects
6. Fusing Leveling and Non-Stock Production
7. Toward Comprehensive Integrated Flow Operations
11. Toward a Kanban System



8. Labor Cost Reduction (Autonomation): The Second Cornerstone of Waste Elimination

9. From Mechanization to Autonomation
10. Maintaining and Developing Standard Operations



Shiego presented a good summary of design and redesign of Toyota Production System based on Industrial Engineering principles and practices. Singo restated what Ohno had written earlier.

INDUSTRIAL ENGINEERING THE TOYOTA PRODUCTION SYSTEM by Towill

Industrial engineering the Toyota Production System - Summary


Denis R. Towill, (2010) "Industrial engineering the Toyota Production System", Journal of Management History, Vol. 16 Iss: 3, pp.327 - 345




Introduction
                    
 The paper is intended to highlight the undervalued industrial engineering contribution of the Gilbreths to the Toyota Production System. Typical of all innovative engineering projects, TPS brings together, sifts, and successfully adapts ideas from many sources. Critically, TPS is manifestly a system, in which case the totality is (much) greater than the sum of the constituent parts. Furthermore effective linking of the latter is critical in enabling improved throughput. The viewpoint here is that the Toyota Production System is an evolutionary output with some of its roots clearly traceable back to method study combining multiple flows together with more informed design principles and control strategies. The quality movement helped to enable what was ordered to actually become useful goods (as distinct from making scrap). There are three traceable pathways connecting method study and TPS, which were pursued in paper. These include the Japanese Management Association activities; the lecture activities of Lillian Gilbreth and her associates; and  the Scientific Management Movement and FW Taylor.

              Other related topics include the contributions of the quality movement, JIT designers, and the industrial engineering viewpoint of Shigeo Shingo (1989). The cultural implications of successful TPS implementation compared to earlier industrial relations problems are also exemplified in the paper. An important adjunct is the positing of “contemporary” industrial engineering.

However, the  author is apparently still anchored in the “traditional” IE more reminiscent of the inter-war years. Simple vision for TPS – the achievement of continuous material flows. We also examine the “systems” context of TPS operation which ensures the whole is greater than the sum of the constituent parts.

 Continuous material flow

                Crystal Hall project in UK has many features of TPS. Important contributions to the future of logistics and mass production were undoubtedly made in the execution of this massive project. The real innovation was in the process of producing the components, delivering them to the site, and putting them together. Wilkinson (2000) thus comments:

                The exhibition hall was not built. It was assembled. The various parts (including cast-iron columns, wrought iron beams, wooden components, and glass were made all over the UK and delivered directly to the exhibition site by train. They arrived more or less ready for use, and at the right time and were taken straight to the place where they were needed.  From the supermarket we got the idea of viewing the earlier process in a production line as a kind of store. The later process (customer) goes to the earlier process (supermarket) to acquire the needed parts (commodities) at the time and in the quantity needed. The earlier process immediately produces the quantity just taken (re-stocking the shelves). To achieve this in Toyota, Ohno had to make many major changes to production operations. Because the supermarket logistics were designed to replenish only what had just been taken in a timely manner, lot sizes had to be drastically reduced. Hence, the Single-Minute Exchange of Dies (SMED) initiatives (Shingo, 1989). To achieve the efficiencies needed, Ohno and his Toyota colleagues engineered many creative ways to reduce such changeovers. 

            

Holistic view of TPS

        In their seminal paper, Spear and Bowen (1999) argue that to unravel the DNA of TPS the key factor to understand is that the (surprisingly) rigid specification is the very thing that makes the flexibility and creativity possible. That conclusion was reached by Spear and Bowen (1999) based on an extensive four-year study of the Toyota Production System. They examined the inner workings of more than 40 plants in the USA, Europe, and Japan, some successfully operating the system, but some were not. These authors studied artifacts produced in both continuous process  and discrete manufacturing companies. Products ranged from prefabricated housing, auto parts and final auto assembly, cell phones, and computer printers through to injection-moulded plastics and aluminium extrusions. They studied not only routine production work but also service functions such as equipment maintenance, workers’ training and supervision, logistics and materials handling, and process design and redesign.

 The Gilbreth's “four step” approach

(1) To define the current situation noting anything that could have any possible effect on the job and its performance.
(2) To analyse the job using the special equipment he had either invented or adapted for use for this purpose and supported by one of the several systems of analysis that he had also developed.
(3) To examine the results of these analyses, cutting out any part of the job he found unnecessary, combining different parts where possible and, if practicable, designing equipment that would reduce still further the motions to do the job.
(4) Taking what was left of the job to synthesise this into a new job method which was, to him, the best way the job could be done in the given situation.





Ud. 1.6.2025  To be revised.