Process Industrial Engineering for Productivity Improvement - Training Programme - Prof Narayana Rao K.V.S.S., NITIE, Bombay



Process Industrial Engineering for Productivity Improvement


Topics in the Programme

Process Analysis using Method Study - Methods Efficiency Analysis
Operation Analysis
Machine Work Study
Productivity Based on Tooling, Jigs and Fixtures
Optimizing Machine Operations - Six Sigma
OEE Analysis and Improvement
New Equipment/Technology Economic Analysis
Replacement Economic Analysis
Applied Industrial Engineering - New Technologies - Industry 4.0 - Industrial Engineering 4.0


Principles of Industrial Engineering - Taylor - Narayana Rao


Presented by Narayana Rao in IISE Annual Conference 2017 at Pittsburgh, USA.

__________________


__________________


Functions of Industrial Engineering

__________________

__________________


Focus Areas of Industrial Engineering - Curriculum and Practice Areas

__________________


__________________

Process Industrial Engineering - Introduction

__________________


__________________

Sunday, October 21, 2018

An Improved Effective Cost Review Process for Value Engineering by D. S. Joo and J. I. Park



An Improved Effective Cost Review Process for Value Engineering
D. S. Joo and J. I. Park
Department of Industrial Engineering, Ajou University, San 5, Woncheon-dong, Yeongtong-gu, Suwon 443-749, Republic of Korea
The Scientific World Journal
Volume 2014, Article ID 682051, 16 pages
http://dx.doi.org/10.1155/2014/682051
Copyright © 2014 D. S. Joo and J. I. Park.

This is an open access article distributed under the Creative Commons Attribution License, which permits unrestricted use, distribution, and reproduction in any medium, provided the original work is properly cited.
https://www.hindawi.com/journals/tswj/2014/682051/


Abstract
Second-look value engineering (VE) is an approach that aims to lower the costs of products for which target costs are not being met during the production stage. Participants in second-look VE typically come up with a variety of ideas for cost cutting, but the outcomes often depend on their levels of experience, and not many good alternatives are available during the production stage. Nonetheless, good ideas have been consistently generated by VE experts. This paper investigates past second-look VE cases and the thinking processes of VE experts and proposes a cost review process as a systematic means of investigating cost-cutting ideas. This cost review process includes the use of an idea checklist and a specification review process. In addition to presenting the process, this paper reports on its feasibility, based on its introduction into a VE training course as part of a pilot study. The results indicate that the cost review process is effective in generating ideas for later analysis.

1. Introduction
Value engineering (VE) is a value-enhancing technique developed by Miles, of which cost cutting is a part [1]. It is a proven method for improving product and process performance by changing materials, designs, and systems and aims to maximize function while minimizing cost [2]. VE has been embraced by a global spectrum of businesses and industries, particularly in areas such as defense, transportation, construction, and healthcare [3].

VE has evolved to comprise three phases, which are sometimes collectively referred to as product development VE: (1) zero-look VE, (2) first-look VE, and (3) second-look VE [4]. Zero-look VE is the application of VE principles at the concept proposal stage. One of its objectives is to introduce new forms of functionality that did not previously exist. Once an overall concept has been established during zero-look VE, first-look VE focuses on the major elements of product design. The objective of second-look VE is to lower the costs of products at the production stage when target costs are not currently being met. During this stage, when products are already in production, not many good alternatives are available, and so companies are compelled to use second-look VE to lower costs.

Brainstorming is a commonly used method of generating ideas and has been adopted in VE in order to develop a wide variety of ideas in a constraint-free atmosphere. However, the ideas resulting from brainstorming in VE tend to be biased and limited, because participants rely on their experience in their areas of engineering focus [5]. In other words, experienced individuals often fail to explore other feasible, possibly better ideas in different engineering areas [6]. At the same time, it is difficult for entry-level participants to come up with many ideas without training, since they may have difficulty imagining and investigating ideas within their areas of expertise.

Asking questions that stimulate curiosity and creativity is a helpful approach to idea generation and makes it possible to be creative in a thorough and even orderly way. A written list of mentally stimulating questions can remind individuals of approaches and possibilities that they may otherwise not have had in mind [7]. A notable example of this can be seen in engineers’ use of the “eliminate, combine, rearrange, and simplify” (ECRS) method to discover potential changes that they can make to an existing product, so as to create a better one. These proposed changes may either be in the form of direct suggestions or starting points for lateral thinking. However, ECRS is so general that the process often ends up leading to interesting but impractical and uneconomical ideas. In contrast, second-look VE professionals tend to come up with small and simple yet practical cost-cutting ideas that lower the costs of products during the production stage. ECRS alone is thus not particularly well suited to coming up with second-look ideas.

In general, it is well known that the best cost-cutting ideas for second-look VE are associated with eliminating unnecessary or unused portions of functions or overspecifications [8]. VE professionals have typically been trained and disciplined over several years, with the goal of boosting their ability to generate such ideas. They learn how to come up with more ideas, how to analyze methods for developing ideas, and how to recognize good ideas, tips, and techniques. The thinking processes performed by professionals during second-look VE involve recognizing specification differences [9]. This enables VE professionals to think of new directions and generate cost-cutting ideas that can be accepted for further analysis. If such thinking processes can be formulated, it can be very useful for engineers who have difficulty generating cost-cutting ideas.

This paper presents a cost review process that was developed as a supportive method for investigating cost-cutting ideas in second-look VE. For it, we investigated second-look VE cases for 20 home appliances, and created an idea checklist that was specific to those product models. In addition, we developed a specification review process to explore cost-cutting ideas by checking whether specifications are appropriate or can be improved. The rest of this paper is organized as follows. In Section 2, idea generation methods that are frequently used in VE are reviewed, with regard to their problems. Section 3 explains how the idea checklist and specification review process for this study was developed and applied. Section 4 presents the application of the proposed idea generation method to cases, while Section 5 evaluates the effectiveness of the method in a VE training course. The benefits and limitations of the proposed method are discussed in Section 6. Finally, Section 7 concludes with a summary and description of potential future work based on this study.

2. Idea Generation Methods
Much existing research on idea generation methods has focused on the goal of increasing the number of ideas produced, because it has been established that a direct relationship exists between the number of initial ideas and the quality of a final idea [10]. The main focus of such studies has been on brainstorming techniques for group-thinking sessions that increase the quality and quantity of proposed ideas for addressing a specific problem [11]. It has been claimed that group brainstorming is more effective than individual brainstorming, because mixing more different personalities into the creative flow results in a broader outlook in ideas, and the use of a facilitator to lead the session makes the process run more smoothly and removes potential bias [12]. As such, group brainstorming is the most common creativity technique used in the alternative phase of VE. Several books on VE, such as those of Fowler [13] and Dell’Isola [14], have presented brainstorming as the ideal creative technique for use in VE.

However, some VE researchers and professionals have questioned the usefulness of group brainstorming, claiming that it blocks the creative thinking efforts of a group [15]. VE participants are likely to experience the greatest difficulty during the process of idea generation. One problem is that participants tend to get stuck inside their own heads, in terms of their thinking and ideas, and do not exchange enough ideas through idea generation methods, due to perceptual blocks, emotional blocks, habitual blocks, professional blocks, or cultural blocks, which can hinder creative ability [16–18].

Individuals engaging in creative thinking should ideally engage naturally in a creative process that is as free of structure, rules, and processes as possible, but it is unlikely that a group will spontaneously do so in reality [19–21]. This is why applying a proven, systematic structure to brainstorming sessions significantly increases team productivity [22–24]. Al-Ghamdi [25] has investigated the necessary steps for effective implementation of brainstorming, and proposed a five-step procedure that helps to enhance the effectiveness of brainstorming implementation in VE studies. This study suggests that creative professionals prefer to use set methods to produce more creative results.

Asking questions to stimulate curiosity and creativity has proven to be a helpful method for idea generation, which shows that it is sometimes possible to be creative in a thorough and even orderly way. A written list of mentally stimulating questions can remind individuals of approaches and possibilities that they otherwise would not have considered. In such contexts, a checklist can play a key role in generating ideas [26]. Checklists can include ideas collected through previous experiences, so as to trigger team members’ thinking about solutions to a problem under study. SCAMPER (substitute, combine, adapt, modify, put to other uses, eliminate, and rearrange) is an acronym for useful approaches that can be applied as stimuli to make one think differently about a problem area [27]. The SCAMPER method can be used to ask questions about existing products, using each of the approaches involved. Such questions are effective in helping individuals come up with creative ideas for developing new products or improving current ones.

Checklists may range from general to very specialized. General checklists are useful for almost any VE study. They contain suggestions for rearranging, substituting, and combining existing ideas in order to develop new ones. However, specialized checklists are only useful for addressing specific problems. For example, a series of questions can be created that stimulates new ways of thinking about new processes or devices [28]. In such cases, however, ordinary engineers might limit themselves to considering the listed questions, without giving much thought to other possible alternatives.

Brainstorming is often more effective if it is combined with other idea-generation techniques. These include the Delphi method, the Gordon technique, the morphological analysis technique, and TRIZ contradiction analysis. Of these, TRIZ provides the most structured and systematic approach and can be best used to augment or replace traditional brainstorming as it is currently applied in VE [29]. This makes the integration of VE and TRIZ beneficial, as it facilitates the transition from functional diagramming to implementable solution concepts [30, 31]. The value in using these methods is in how they include additional thoughts that inspire participants and allow their minds to wander or make intuitive leaps. However, these methods cannot ensure that the ideas that are sought out will be found.

3. Developing a Specification Review Method
This study presents the development of a cost review process that helps to investigate cost-cutting ideas for second-look VE. Its main focus is the development of an idea checklist and specification review process. The checklist is created by investigating previous second-look VE cases and classifying them according to idea stimuli, while the specification review process is developed based on the thinking processes engaged in by VE professionals.

3.1. Developing the Idea Checklist
For this study, we investigated the second-look VE cases of 20 home appliances, including TVs, refrigerators, washing machines, air conditioners, and peripheral computer devices. We organized 691 actual cases into eight idea categories: (1) material (213 cases), (2) form/structure (189 cases), (3) dimension (166 cases), (4) component (73 cases), (5) printing/coloring (45 cases), and (6) processing (27 cases). We created a checklist based on this classification by grouping similar cases and giving them appropriate names. As can be seen in Figure 1, the categories of material, form/structure, dimension, and component account for roughly 90% of the cases, while the other categories account for only roughly 10% of cases. Therefore, efforts to generate ideas through second-look VE should concentrate on these four categories, which describe the most frequently encountered instances.

3.1.1. Material
(i) Cost-Cutting Ideas. These are the most frequently encountered ideas among VE cases. Their main concept is to meet prevailing functional requirements with less expensive alternative materials. Table 1 presents material-related idea stimulus questions, which involve replacing the currently used material with one that is less costly. Since these ideas comprise the largest portion of cost-cutting ideas, they should be considered a priority in the exploration of cost-cutting ideas. To use a lower-grade material for its own sake is a bad idea. Therefore, engineers need to have considerable knowledge about material properties. There are two types of material-related ideas. The same material of a lower grade replacement is one that (a) uses the same material, (b) is of a lower grade, and (c) meets functional specifications. A different material at a lower cost replacement is one that (a) uses a different material, (b) costs less, and (c) meets functional specifications.

(ii) Expression. The cost-cutting ideas in this category take the form 〈Category, Subcategory, Object (to object)〉, where (to object) concerns a potential anticipated object for a cost-cutting idea. A representative case of the same material of lower-grade replacement is the replacement of SUS 303 of a shaft with HIPS HB. This case can be represented as 〈Material, Same material of a lower grade replacement, Shaft_SUS 303 (to SUS204CU)〉. A representative case of a different material at a lower cost replacement is the replacement of ABS plastic of a cover with HIPS. This case can be represented as 〈Material, Different material at a lower cost replacement, Cover_ABS plastic (to HIPS)〉. If there is no potential object to be anticipated, this case can be represented as 〈Material, Different material at a lower grade replacement, Cover_ABS plastic ( )〉. More examples can be found in Table 1.

3.1.2. Form/Structure
(i) Cost-Cutting Ideas. The form/structure category accounts for the second-largest share of second-look VE cases. The main idea of form and structure cost-cutting ideas is to eliminate, combine, rearrange, and simplify some aspect of the form or structure of an existing product while meeting functional requirements. Table 2 shows idea stimulus questions and cases that can be classified as form/structure cost-cutting ideas. These ideas are meant to reduce material or processing costs by altering a component’s form or structure.

(ii) Expression. A representative case of simplification is that of simplifying the comb pattern ribs of a friction holder rear by replacing it with simple pattern ribs. This case can be represented as 〈Form/Structure, Simplification, Fiction holder rear_comb pattern ribs (to simple pattern ribs)〉. If there is no potential object to be anticipated, this case can be represented as 〈Form/Structure, Simplification, Friction holder rear_comb pattern ribs ( )〉. More examples are found in Table 2, and some cases are illustrated with pictures as shown in Table 3.

3.1.3. Dimension
(i) Cost-Cutting Ideas. These ideas are meant to reduce the size or weight of an existing product in order to cut material costs. Dimension-related features include thickness, length, width, height, and diameter. Reducing the thickness of a component is one of the most frequently used ideas for cutting costs related to dimension. These idea stimulus questions are shown in Table 4.

(ii) Expression. The cost-cutting ideas in this category take the following form: 〈Category, Subcategory, Object_(target value)〉, where a target value is a potential one anticipated. A representative case of cost cutting with regard to thickness involves reducing an inlay panel’s 0.25 t by 0.17 t. This case can be represented as 〈Dimension, Thickness reduction, Inlay panel_0.25 t (to 0.17 t)〉. More examples can be found in Table 4.

3.1.4. Component
(i) Cost-Cutting Ideas. The major ideas in this category are meant to cut costs by finding lower-grade or otherwise lower-cost components as substitutes for existing components. The minor ideas involve reducing the number of components (e.g., PCB test pins, connector pins, holes) or their capacities (e.g., volts, memory size). These idea stimulus questions are shown in Table 5. To find proper substitute components, engineers need sufficient knowledge to find those that are cheap but suitable and available, while meeting prevailing functional requirements.
(ii) Expression. A representative case of the same component of a lower grade component replacement is the replacement of the 2012 cable of an SMD chip resister with a 1608 cable. This case can be represented as 〈Component, Same component of a lower cost replacement, SMD Chip Resister_2012 cable (to 1608 cable)〉. More examples can be found in Table 5.

3.1.5. Printing/Coloring
(i) Cost-Cutting Ideas. The ideas in this category involve the application of low-cost printing and coloring methods. The basic questions in this category concern the possibility of applying low-cost printing methods or omitting coloring processes by using natural or the same (existing) color. Table 5 shows idea stimulus questions related to labeling and painting.

(ii) Expression. A representative case of lower-cost printing replacement involves replacing the labeling of an internal case with carved sealing. This case can be represented as 〈Printing/coloring, Lower cost printing replacement, Internal case_labeling (to carved sealing)〉. More examples can be found in Table 6.

3.1.6. Processing
(i) Cost-Cutting Ideas. These ideas are meant to reduce processing time by changing a joint type, eliminating an assembly step, or reducing a processing step. Table 7 shows idea stimulus questions related to processing.

(ii) Expression. A representative case of lower-cost processing is the replacement of the screws of a main PCB and a boy frame with tapes. This case can be represented as 〈Processing, Joint type replacement, Main PCB and body frame joint_screws (to tapes)〉. More examples can be found in Table 7.

Table 8 summarizes an idea checklist that was created by classifying second-look VE cases according to idea stimuli. Engineers can work through the checklist in brainstorming sessions in which they examine a product for which target costs are not currently being met. They can answer the questions in the checklist one by one while examining the product. This idea checklist can thus be a supportive tool for reminding inexperienced engineers of various idea perspectives to consider. However, the list may not by itself be able to help engineers think of more practical ideas. A systematic process is needed to make ideas more practical.

3.2. Developing the Specification Review Process
For this study, we interviewed VE professionals who had 15–20 years of experience about how to find direction in cost-cutting ideas during second-look VE. We found that design specifications are used to generate, test, and evaluate design ideas, because they are essential qualitative and quantitative characteristics for setting criteria to be satisfied in designing a component, product, or system (such as performance requirements, dimensions, weight, or reliability). The review processes performed by professionals involve investigating current specifications based on the assumption that design specifications may have been decided without adequate review. This kind of thinking process can be very useful for engineers who have difficulty generating cost-cutting ideas.

Table 9 presents the kind of specification review process that is typically carried out by VE professionals. In the first step, the specifications of components are identified and recorded with drawings or approved calculation sheets. If there are no existing specifications, the specifications need to be established through the proper methods. In the second step, all relevant regulations are explored, such as laws, legal standards, environmental regulations, safety standards, or service guidelines. By looking into issues of who created the specifications, how, and why, more information can be obtained. If reasons and methods for creating specifications can be determined, they can help professionals understand historical approaches. If they cannot be determined, it can be concluded that specifications have been created without an adequate review process. In the third step, cost-cutting ideas are generated based on determining an idea form: 〈Category, Subcategory, object (to object)〉. This aims to find any potential problems that could arise from object to object and to determine how to overcome them. Sometimes, these ideas can be obtained simply by benchmarking.

Going through steps 1, 2, and 3 makes it possible for ideas to be explored and expanded on. This review process, together with the idea checklist, allows brainstorming to be conducted more effectively.

In summary, the cost review process consists of two steps: identifying the relevant subcategories within the idea checklist through a brainstorming session and then conducting a specification review for the subcategories identified as relevant. During the brainstorming session, VE participants investigate a product for which cost targets are not currently being met by going through the idea checklist and identifying potential subcategories for cost cutting. In the subsequent specification review process, they identify the current specifications, explore requirements and the issues of “who, why, and how,” and think of cost-cutting ideas for the subcategories.

4. Implementation
In the next step in this study, the idea checklist and design specification review described in Section 3 were implemented in a training course for the associate value specialist (AVS) program in a company. The AVS program is a certificate program for engineers who decide to become professional value engineers [32]. The program is based on a process known as a multistage job plan, which provides structure for value studies. The plan consists of six sequential steps: (1) the information phase, (2) the function analysis phase, (3) the alternative phase, (4) the evaluation phase, (5) the development phase, and (6) the presentation and implementation phase. The goal of the plan is to generate as many practical ideas as possible for later analysis. This shows that idea generation can be seen as the most important part of VE. This paper only describes the phase associated with the proposed method in the training course. Table 10 shows the appearance and component configuration of a handset used in this training. A hierarchical decomposition of the product or what is typically known as the bill of materials (BOM) is also shown in Table 10. Two cases were selected to demonstrate how the supportive method is implemented.

4.1. Implementation Case I
The proposed method was applied to handset cases ① and ② in Table 10, in order to demonstrate how it works. The function of the handset cases was to protect the internal parts of the handset, and their target costs were not being met. Few good alternatives were available, and so an idea checklist was employed to generate cost-cutting ideas. By checking the idea stimuli one at a time in a brainstorming session, four subcategories were developed by the engineers in the training program, as shown in Table 11.

In the second round, a specification review was conducted to explore the four subcategories based on specification data. The current design specification of the handset cases with respect to material is standard ABS (acrylonitrile butadiene styrene) V0. With regard to thermal characteristics, the regulations imposed on handset uppers are the UL (Underwriters’ Laboratories) and TUV (Technischer Überwachungs Verein) standards. The history of the design was explored, and it was found that the existing design specification involved using heat-resistant resin, as imposed by UL/TUV standards, primarily to impede fires in the phone line. The specification review resulted in examining the following idea form: 〈Material, Same material of a lower grader replacement, Handset cases_ABS (to ABS HB)〉 by questioning what problems you expect and how you overcome them, because ABS HB (hard board) has the same functional specifications as ABS V0, and is also heat-resistant.

The next subcategory concerned the thickness of the handset cases. The written specifications for the cases describe a thickness of 2.5 mm, as in the schematic drawing. However, the measured thickness of the handset was 2.8 mm, which was over specifications. The safety regulations imposed on handset cases dictate that they must not break under 5Ns impact. Furthermore, a review of the history of the handset design revealed that the existing design specifications had been set up without adequate specification review. The specification review resulted in examining the following idea form: 〈Dimension, Thickness reduction, Headset case_0.28 t (to 0.25 t)〉. It should have investigated the thickness needed to withstand the impact of 5 Ns. The application of an appropriate specification review process to the handset cases is summarized in Table 12.

4.2. Implementation Case II
Table 13 shows an example of idea generation for the PBA SUB-etc. MIC (⑥) and CFH (⑨) in Table 10, for a function in which an electrical signal is passed to the modular jack. Four subcategories were chosen from the idea checklist for further investigation.

A specification review was conducted to further explore the four subcategories in a systematic manner, based on specification data. The form/structure subcategory concerned the integration of the PBA SUB-etc. and CFH. In the existing structure, the CFH and the PCB-handset MIC were detachable at the modular jack, with the modular jack soldered onto the PCB-handset MIC in PBA SUB-etc. The safety regulations imposed on the CFH were unknown. The actual structure of the CFH and the PCB-handset MIC can be split. An examination of the history of the design revealed that the existing structure was set up by an engineer due to problems related to repairs after sales. Therefore, the relevant after-sales claim rates need to be investigated to decide whether the CFH and the PCB-handset MIC should be separated. The idea generated from this specification review was to examine the feasibility of soldering the CFH directly to the PCB-handset MIC without the modular jack, if rates of after-sales repairs were low or nonexistent.

The second subcategory is related to the length of the CFH. The existing length of the CFH was 300 ± 20 cm. The actual measured length was 305 cm. The safety regulations imposed on the CFH were unknown. A review of the history of the design showed that the existing specifications had been set without adequate specification review. The actual length is within the given range, meaning that the current length has been set appropriately with respect to the current specifications. The idea generated from this specification review was to examine the length of other commercial models in order to benchmark them for comparison with the current design specification. The application of the specification review process to the PBA SUB-etc. and CFH is summarized in Table 14.


Table 14: Specification review process for PBA SUB-etc. and CFH.

5. Evaluation
A preliminary evaluation of the proposed method for brainstorming was conducted by implementing the method in a training course, in order to determine whether it could be used as a supplementary method to help engineers generate ideas. We assembled ten brainstorming groups. Each group was made up of 4-5 persons. We introduced the purpose of the test and provided the method, along with the product. The experiment was conducted just after brainstorming, without applying the method. The results of the preliminary test are shown in Table 15.


Table 15: Preliminary test results for the proposed method.


The total numbers of ideas generated by brainstorming without and with the supportive method were 75 and 219, respectively. Through the use of the supportive method, the average number of ideas improved from 7.5 to 21.9, which is an increase of 293%. These results of the preliminary test result suggested that the use of the supportive method for brainstorming resulted in training outcomes that were significantly better than those achieved through brainstorming alone.

A most significant observation was made during the test. When running through the checklist, the leader of one group asked, “Taking this idea checklist into account, how might I check this specification? What effect will this idea have on the problem?” as well as other similar questions. The other members of the group answered the questions. We observed that the checklist stimulated the participants, who had trouble remaining alert during the brainstorming session in which the supportive method was not used.

6. Discussion
Our evaluation of the training effectiveness of the method showed that participants felt that it made positive contributions to their brainstorming behaviors. This suggests that the method reinforces brainstorming by providing a more efficient approach to generating ideas. However, our interviews with several VE experts revealed a somewhat different reality.

For our study, we also examined people’s attitudes toward this method. In a postexperimental survey, eight of 10 groups said that the method was either helpful (six groups) or sometimes helpful (two groups). Some participants informally praised the method, and one volunteered that the method was helpful for him because the idea checklist and review process smoothly guided idea generation. Another got quite excited about the effectiveness of the method and stated that he planned to introduce it to his team members, who work on home appliance development. However, some participants criticized the method, arguing that the idea stimuli such as dimension, amount, and size are well-known approaches in VE, and thus the method is only effective for entry-level engineers. For senior engineers who have experience in their fields, the method may even limit idea generation. Hence it is necessary that engineers expand on checklists with as many feasible alternatives as possible.

In general, a specification review is an important part of second-look VE. It provides essential technical details on the materials or processes to be used in developing a product that conforms to customer requirements. Product nonconformance is often associated with inadequate specification review. Engineers often set design specifications without adequate specification review due to a lack of time and information. Problems of this type can be avoided with a well-planned and managed specification review procedure. Therefore, specification reviews are a necessary process for further exploring ideas that need to be visualized by engineers.

7. Conclusion
This study presents a supportive method for supplementing brainstorming activities that do not play a role as starting points for second-look VE. The supportive method for brainstorming consists of two parts: an idea checklist and a specification review process. In the brainstorming session, engineers use the idea checklist to review a current product and come up with individual cost-cutting ideas. By listing each item, they ensure that none are overlooked in generating ideas. If some ideas need to be further investigated, they systematically review the specifications along with the idea checklist.

The proposed method was applied to a consumer headset to demonstrate how it forms idea stimuli and reminds engineers of possible ways to approach a problem or shape a solution. A preliminary evaluation indicated that the specification review method was effective in generating ideas for later analysis. Future development of this “ideating via checklist” method is planned, beginning by generating checklists for other products. This study can be used to help those who are looking for ways to produce new and better cost-cutting ideas.


Conflict of Interests
The authors certify that there is no conflict of interests with any financial organization regarding the material discussed in the paper.

Acknowledgments
This research was supported by the Basic Science Research Program through the National Research Foundation of Korea and was funded by the Ministry of Education, Science, and Technology (NRF-2010-0022344).

References
L. Miles, Techniques of Value Analysis Engineering, McGraw-Hill, 1972.
Save International, Value Methodology Standard and Body of Knowledge, 2007, http://www.value-eng.org/pdf_docs/monographs/vmstd.pdf.
J. J. Kaufman, Value Engineering for the Practitioner, North Carolina State University, Raleigh, NC, USA, 1985.
D. J. Gerhardt, Ingersoll-Rand Uses VE in New Product Development: A Strategy for Business Survival in the 21st Century, 2011, http://www.value-eng.org/knowledge_bank/attachments/IR%20Uses%20VE%20in%20New%20Product%20Development.pdf.
G. Lee, H. C. Lee, and S. S. Go, “A study on the optimum selection of decision-making to the analysis stage of design VE using ASIT,” Journal of the Architectural Institute of Korea, vol. 25, no. 1, pp. 177–184, 2009. View at Google Scholar
N. Onaya, “A New Method for Generating Creative Ideas in Manufacturing VE for Mature products,” 2014, http://www.value-eng.org/knowledge_bank/attachments/T10508.pdf.
S. Y. Choo, Principles and Methods of Creative Idea Generation, Ulsan University, Ulsan, South Korea, 2007.
C. Fallon, Steps in the Search Pattern in Value Analysis to Improve Productivity, John Wiley & Sons, New York, NY, USA, 1971.
R. B. Stewart, Fundamentals of Value Methodology, Xlibris Corporation, Bloomington, Ind, USA, 2005.
A. B. Van Gundy, Idea Power: Techniques and Resources to Unleash the Creativity in Your Organization, AMACOM, Amacom, NY, USA, 1992.
A. F. Osborn, Applied Imagination: Principles and Procedures of Creative Thinking, Scribner, New York, NY, USA, 1953.
Infinite Innovations, “Preparing for a Successful Brainstorming Session,” http://www.brainstorming.co.uk/tutorials/preparingforbrainstorming.html.
T. C. Fowler, Value Analysis in Design, Competitive Manufacturing Series, Van Nostrand Reinhold, New York, NY, USA, 1990.
A. Dell’Isola, Value Engineering: Practical Applications for Design, Construction, Maintenance and Operations, RSMeans Series, Wiley, 1997.
H. J. Brightman, Problem Solving: A Logical and Creative Approach, College of Business Administration, Georgia State University, Atlanta, Ga, USA, 1980.
J. Brown, Value Engineering: A Blueprint, Industrial Press, New York, NY, USA, 1992.
S. J. Kirk, M. Spreckel, and F. Kent, Enhancing Value in Design Decisions, University of Michigan, Ann Arbor, Mich, USA, 1993.
D. E. Parker, Management Application of Value Engineering for Business and Government, The Lawrence D. Miles Value Foundation, Washington, DC, USA, 1994.
B. Mullen, C. Johnson, and E. Salas, “Productivity loss in brainstorming groups: a meta-analytic integration,” Basic and Applied Social Psychology, vol. 12, no. 1, pp. 3–23, 1991. View at Publisher · View at Google Scholar
M. Diehl and W. Stroebe, “Productivity loss in brainstorming groups: toward the solution of a riddle,” Journal of Personality and Social Psychology, vol. 53, no. 3, pp. 497–509, 1987. View at Publisher · View at Google Scholar · View at Scopus
W. Stroebe and M. Diehl, “Why groups are less effective than their members: on productivity losses in idea-generating groups,” European Review of Social Psychology, vol. 5, no. 1, pp. 271–303, 1994. View at Publisher · View at Google Scholar
T. J. Kramer, G. P. Fleming, and S. M. Mannis, “Improving face-to-face brainstorming through modeling and facilitation,” Small Group Research, vol. 32, no. 5, pp. 533–557, 2001. View at Publisher · View at Google Scholar · View at Scopus
V. L. Putman, Effects of additional rules and dominance on brainstorming and decision making [Ph.D. thesis], University of Texas at Arlington, Arlington, Tex, USA, 2001.
J. J. Sosik, B. J. Avolio, and S. S. Kahai, “Effects of leadership style and anonymity on group potency and effectiveness in a group decision support system environment,” Journal of Applied Psychology, vol. 82, no. 1, pp. 89–103, 1997. View at Publisher · View at Google Scholar · View at Scopus
M. A. Al-Ghamdi, “Five steps for more effective implementation of brainstorming in value engineering studies,” 2004, http://www.value-eng.org/knowledge_bank/attachments/200403.pdf.
J. Mandelbaum, Value Engineering Handbook, Institute for Defense Analyses, Alexandria, Va, USA, 2006.
B. Eberle, SCAMPER : Creative Games and Activities for Imagination Development, Prufrock Press, Austin, Tex, USA, 1981.
R. M. Felder, “Creativity in Engineering Education,” Chemical Engineering Education, vol. 22, no. 3, pp. 120–125, 1988. View at Google Scholar
D. Mann and S. Dewulf, “Evolving the world’s systematic creativity methods,” in Proceedings of the 7th European Association of Creativity and Innovation Conference, University of Twente, Enschede, Netherlands, 2001.
D. W. Clarke, “Integrating TRIZ with value engineering: discovering alternatives to traditional brainstorming and the selection and use of ideas,” in Proceedings of the International SAVE Conference, San Antonio, Tex, USA, 1999.
D. Hannan, “Value methodology, creative problem solving strategies and TRIZ,” in Proceedings of the SAVE International Conference, Society of American Value Engineers, 2000.
Certification Program, http://www.value-eng.org/education_certification.php.Abstract
Second-look value engineering (VE) is an approach that aims to lower the costs of products for which target costs are not being met during the production stage. Participants in second-look VE typically come up with a variety of ideas for cost cutting, but the outcomes often depend on their levels of experience, and not many good alternatives are available during the production stage. Nonetheless, good ideas have been consistently generated by VE experts. This paper investigates past second-look VE cases and the thinking processes of VE experts and proposes a cost review process as a systematic means of investigating cost-cutting ideas. This cost review process includes the use of an idea checklist and a specification review process. In addition to presenting the process, this paper reports on its feasibility, based on its introduction into a VE training course as part of a pilot study. The results indicate that the cost review process is effective in generating ideas for later analysis.

1. Introduction
Value engineering (VE) is a value-enhancing technique developed by Miles, of which cost cutting is a part [1]. It is a proven method for improving product and process performance by changing materials, designs, and systems and aims to maximize function while minimizing cost [2]. VE has been embraced by a global spectrum of businesses and industries, particularly in areas such as defense, transportation, construction, and healthcare [3].

VE has evolved to comprise three phases, which are sometimes collectively referred to as product development VE: (1) zero-look VE, (2) first-look VE, and (3) second-look VE [4]. Zero-look VE is the application of VE principles at the concept proposal stage. One of its objectives is to introduce new forms of functionality that did not previously exist. Once an overall concept has been established during zero-look VE, first-look VE focuses on the major elements of product design. The objective of second-look VE is to lower the costs of products at the production stage when target costs are not currently being met. During this stage, when products are already in production, not many good alternatives are available, and so companies are compelled to use second-look VE to lower costs.

Brainstorming is a commonly used method of generating ideas and has been adopted in VE in order to develop a wide variety of ideas in a constraint-free atmosphere. However, the ideas resulting from brainstorming in VE tend to be biased and limited, because participants rely on their experience in their areas of engineering focus [5]. In other words, experienced individuals often fail to explore other feasible, possibly better ideas in different engineering areas [6]. At the same time, it is difficult for entry-level participants to come up with many ideas without training, since they may have difficulty imagining and investigating ideas within their areas of expertise.

Asking questions that stimulate curiosity and creativity is a helpful approach to idea generation and makes it possible to be creative in a thorough and even orderly way. A written list of mentally stimulating questions can remind individuals of approaches and possibilities that they may otherwise not have had in mind [7]. A notable example of this can be seen in engineers’ use of the “eliminate, combine, rearrange, and simplify” (ECRS) method to discover potential changes that they can make to an existing product, so as to create a better one. These proposed changes may either be in the form of direct suggestions or starting points for lateral thinking. However, ECRS is so general that the process often ends up leading to interesting but impractical and uneconomical ideas. In contrast, second-look VE professionals tend to come up with small and simple yet practical cost-cutting ideas that lower the costs of products during the production stage. ECRS alone is thus not particularly well suited to coming up with second-look ideas.

In general, it is well known that the best cost-cutting ideas for second-look VE are associated with eliminating unnecessary or unused portions of functions or overspecifications [8]. VE professionals have typically been trained and disciplined over several years, with the goal of boosting their ability to generate such ideas. They learn how to come up with more ideas, how to analyze methods for developing ideas, and how to recognize good ideas, tips, and techniques. The thinking processes performed by professionals during second-look VE involve recognizing specification differences [9]. This enables VE professionals to think of new directions and generate cost-cutting ideas that can be accepted for further analysis. If such thinking processes can be formulated, it can be very useful for engineers who have difficulty generating cost-cutting ideas.

This paper presents a cost review process that was developed as a supportive method for investigating cost-cutting ideas in second-look VE. For it, we investigated second-look VE cases for 20 home appliances, and created an idea checklist that was specific to those product models. In addition, we developed a specification review process to explore cost-cutting ideas by checking whether specifications are appropriate or can be improved. The rest of this paper is organized as follows. In Section 2, idea generation methods that are frequently used in VE are reviewed, with regard to their problems. Section 3 explains how the idea checklist and specification review process for this study was developed and applied. Section 4 presents the application of the proposed idea generation method to cases, while Section 5 evaluates the effectiveness of the method in a VE training course. The benefits and limitations of the proposed method are discussed in Section 6. Finally, Section 7 concludes with a summary and description of potential future work based on this study.

2. Idea Generation Methods
Much existing research on idea generation methods has focused on the goal of increasing the number of ideas produced, because it has been established that a direct relationship exists between the number of initial ideas and the quality of a final idea [10]. The main focus of such studies has been on brainstorming techniques for group-thinking sessions that increase the quality and quantity of proposed ideas for addressing a specific problem [11]. It has been claimed that group brainstorming is more effective than individual brainstorming, because mixing more different personalities into the creative flow results in a broader outlook in ideas, and the use of a facilitator to lead the session makes the process run more smoothly and removes potential bias [12]. As such, group brainstorming is the most common creativity technique used in the alternative phase of VE. Several books on VE, such as those of Fowler [13] and Dell’Isola [14], have presented brainstorming as the ideal creative technique for use in VE.

However, some VE researchers and professionals have questioned the usefulness of group brainstorming, claiming that it blocks the creative thinking efforts of a group [15]. VE participants are likely to experience the greatest difficulty during the process of idea generation. One problem is that participants tend to get stuck inside their own heads, in terms of their thinking and ideas, and do not exchange enough ideas through idea generation methods, due to perceptual blocks, emotional blocks, habitual blocks, professional blocks, or cultural blocks, which can hinder creative ability [16–18].

Individuals engaging in creative thinking should ideally engage naturally in a creative process that is as free of structure, rules, and processes as possible, but it is unlikely that a group will spontaneously do so in reality [19–21]. This is why applying a proven, systematic structure to brainstorming sessions significantly increases team productivity [22–24]. Al-Ghamdi [25] has investigated the necessary steps for effective implementation of brainstorming, and proposed a five-step procedure that helps to enhance the effectiveness of brainstorming implementation in VE studies. This study suggests that creative professionals prefer to use set methods to produce more creative results.

Asking questions to stimulate curiosity and creativity has proven to be a helpful method for idea generation, which shows that it is sometimes possible to be creative in a thorough and even orderly way. A written list of mentally stimulating questions can remind individuals of approaches and possibilities that they otherwise would not have considered. In such contexts, a checklist can play a key role in generating ideas [26]. Checklists can include ideas collected through previous experiences, so as to trigger team members’ thinking about solutions to a problem under study. SCAMPER (substitute, combine, adapt, modify, put to other uses, eliminate, and rearrange) is an acronym for useful approaches that can be applied as stimuli to make one think differently about a problem area [27]. The SCAMPER method can be used to ask questions about existing products, using each of the approaches involved. Such questions are effective in helping individuals come up with creative ideas for developing new products or improving current ones.

Checklists may range from general to very specialized. General checklists are useful for almost any VE study. They contain suggestions for rearranging, substituting, and combining existing ideas in order to develop new ones. However, specialized checklists are only useful for addressing specific problems. For example, a series of questions can be created that stimulates new ways of thinking about new processes or devices [28]. In such cases, however, ordinary engineers might limit themselves to considering the listed questions, without giving much thought to other possible alternatives.

Brainstorming is often more effective if it is combined with other idea-generation techniques. These include the Delphi method, the Gordon technique, the morphological analysis technique, and TRIZ contradiction analysis. Of these, TRIZ provides the most structured and systematic approach and can be best used to augment or replace traditional brainstorming as it is currently applied in VE [29]. This makes the integration of VE and TRIZ beneficial, as it facilitates the transition from functional diagramming to implementable solution concepts [30, 31]. The value in using these methods is in how they include additional thoughts that inspire participants and allow their minds to wander or make intuitive leaps. However, these methods cannot ensure that the ideas that are sought out will be found.

3. Developing a Specification Review Method
This study presents the development of a cost review process that helps to investigate cost-cutting ideas for second-look VE. Its main focus is the development of an idea checklist and specification review process. The checklist is created by investigating previous second-look VE cases and classifying them according to idea stimuli, while the specification review process is developed based on the thinking processes engaged in by VE professionals.

3.1. Developing the Idea Checklist
For this study, we investigated the second-look VE cases of 20 home appliances, including TVs, refrigerators, washing machines, air conditioners, and peripheral computer devices. We organized 691 actual cases into eight idea categories: (1) material (213 cases), (2) form/structure (189 cases), (3) dimension (166 cases), (4) component (73 cases), (5) printing/coloring (45 cases), and (6) processing (27 cases). We created a checklist based on this classification by grouping similar cases and giving them appropriate names. As can be seen in Figure 1, the categories of material, form/structure, dimension, and component account for roughly 90% of the cases, while the other categories account for only roughly 10% of cases. Therefore, efforts to generate ideas through second-look VE should concentrate on these four categories, which describe the most frequently encountered instances.

3.1.1. Material
(i) Cost-Cutting Ideas. These are the most frequently encountered ideas among VE cases. Their main concept is to meet prevailing functional requirements with less expensive alternative materials. Table 1 presents material-related idea stimulus questions, which involve replacing the currently used material with one that is less costly. Since these ideas comprise the largest portion of cost-cutting ideas, they should be considered a priority in the exploration of cost-cutting ideas. To use a lower-grade material for its own sake is a bad idea. Therefore, engineers need to have considerable knowledge about material properties. There are two types of material-related ideas. The same material of a lower grade replacement is one that (a) uses the same material, (b) is of a lower grade, and (c) meets functional specifications. A different material at a lower cost replacement is one that (a) uses a different material, (b) costs less, and (c) meets functional specifications.

(ii) Expression. The cost-cutting ideas in this category take the form 〈Category, Subcategory, Object (to object)〉, where (to object) concerns a potential anticipated object for a cost-cutting idea. A representative case of the same material of lower-grade replacement is the replacement of SUS 303 of a shaft with HIPS HB. This case can be represented as 〈Material, Same material of a lower grade replacement, Shaft_SUS 303 (to SUS204CU)〉. A representative case of a different material at a lower cost replacement is the replacement of ABS plastic of a cover with HIPS. This case can be represented as 〈Material, Different material at a lower cost replacement, Cover_ABS plastic (to HIPS)〉. If there is no potential object to be anticipated, this case can be represented as 〈Material, Different material at a lower grade replacement, Cover_ABS plastic ( )〉. More examples can be found in Table 1.

3.1.2. Form/Structure
(i) Cost-Cutting Ideas. The form/structure category accounts for the second-largest share of second-look VE cases. The main idea of form and structure cost-cutting ideas is to eliminate, combine, rearrange, and simplify some aspect of the form or structure of an existing product while meeting functional requirements. Table 2 shows idea stimulus questions and cases that can be classified as form/structure cost-cutting ideas. These ideas are meant to reduce material or processing costs by altering a component’s form or structure.

(ii) Expression. A representative case of simplification is that of simplifying the comb pattern ribs of a friction holder rear by replacing it with simple pattern ribs. This case can be represented as 〈Form/Structure, Simplification, Fiction holder rear_comb pattern ribs (to simple pattern ribs)〉. If there is no potential object to be anticipated, this case can be represented as 〈Form/Structure, Simplification, Friction holder rear_comb pattern ribs ( )〉. More examples are found in Table 2, and some cases are illustrated with pictures as shown in Table 3.

3.1.3. Dimension
(i) Cost-Cutting Ideas. These ideas are meant to reduce the size or weight of an existing product in order to cut material costs. Dimension-related features include thickness, length, width, height, and diameter. Reducing the thickness of a component is one of the most frequently used ideas for cutting costs related to dimension. These idea stimulus questions are shown in Table 4.

(ii) Expression. The cost-cutting ideas in this category take the following form: 〈Category, Subcategory, Object_(target value)〉, where a target value is a potential one anticipated. A representative case of cost cutting with regard to thickness involves reducing an inlay panel’s 0.25 t by 0.17 t. This case can be represented as 〈Dimension, Thickness reduction, Inlay panel_0.25 t (to 0.17 t)〉. More examples can be found in Table 4.

3.1.4. Component
(i) Cost-Cutting Ideas. The major ideas in this category are meant to cut costs by finding lower-grade or otherwise lower-cost components as substitutes for existing components. The minor ideas involve reducing the number of components (e.g., PCB test pins, connector pins, holes) or their capacities (e.g., volts, memory size). These idea stimulus questions are shown in Table 5. To find proper substitute components, engineers need sufficient knowledge to find those that are cheap but suitable and available, while meeting prevailing functional requirements.
(ii) Expression. A representative case of the same component of a lower grade component replacement is the replacement of the 2012 cable of an SMD chip resister with a 1608 cable. This case can be represented as 〈Component, Same component of a lower cost replacement, SMD Chip Resister_2012 cable (to 1608 cable)〉. More examples can be found in Table 5.

3.1.5. Printing/Coloring
(i) Cost-Cutting Ideas. The ideas in this category involve the application of low-cost printing and coloring methods. The basic questions in this category concern the possibility of applying low-cost printing methods or omitting coloring processes by using natural or the same (existing) color. Table 5 shows idea stimulus questions related to labeling and painting.

(ii) Expression. A representative case of lower-cost printing replacement involves replacing the labeling of an internal case with carved sealing. This case can be represented as 〈Printing/coloring, Lower cost printing replacement, Internal case_labeling (to carved sealing)〉. More examples can be found in Table 6.

3.1.6. Processing
(i) Cost-Cutting Ideas. These ideas are meant to reduce processing time by changing a joint type, eliminating an assembly step, or reducing a processing step. Table 7 shows idea stimulus questions related to processing.

(ii) Expression. A representative case of lower-cost processing is the replacement of the screws of a main PCB and a boy frame with tapes. This case can be represented as 〈Processing, Joint type replacement, Main PCB and body frame joint_screws (to tapes)〉. More examples can be found in Table 7.

Table 8 summarizes an idea checklist that was created by classifying second-look VE cases according to idea stimuli. Engineers can work through the checklist in brainstorming sessions in which they examine a product for which target costs are not currently being met. They can answer the questions in the checklist one by one while examining the product. This idea checklist can thus be a supportive tool for reminding inexperienced engineers of various idea perspectives to consider. However, the list may not by itself be able to help engineers think of more practical ideas. A systematic process is needed to make ideas more practical.

3.2. Developing the Specification Review Process
For this study, we interviewed VE professionals who had 15–20 years of experience about how to find direction in cost-cutting ideas during second-look VE. We found that design specifications are used to generate, test, and evaluate design ideas, because they are essential qualitative and quantitative characteristics for setting criteria to be satisfied in designing a component, product, or system (such as performance requirements, dimensions, weight, or reliability). The review processes performed by professionals involve investigating current specifications based on the assumption that design specifications may have been decided without adequate review. This kind of thinking process can be very useful for engineers who have difficulty generating cost-cutting ideas.

Table 9 presents the kind of specification review process that is typically carried out by VE professionals. In the first step, the specifications of components are identified and recorded with drawings or approved calculation sheets. If there are no existing specifications, the specifications need to be established through the proper methods. In the second step, all relevant regulations are explored, such as laws, legal standards, environmental regulations, safety standards, or service guidelines. By looking into issues of who created the specifications, how, and why, more information can be obtained. If reasons and methods for creating specifications can be determined, they can help professionals understand historical approaches. If they cannot be determined, it can be concluded that specifications have been created without an adequate review process. In the third step, cost-cutting ideas are generated based on determining an idea form: 〈Category, Subcategory, object (to object)〉. This aims to find any potential problems that could arise from object to object and to determine how to overcome them. Sometimes, these ideas can be obtained simply by benchmarking.

Going through steps 1, 2, and 3 makes it possible for ideas to be explored and expanded on. This review process, together with the idea checklist, allows brainstorming to be conducted more effectively.

In summary, the cost review process consists of two steps: identifying the relevant subcategories within the idea checklist through a brainstorming session and then conducting a specification review for the subcategories identified as relevant. During the brainstorming session, VE participants investigate a product for which cost targets are not currently being met by going through the idea checklist and identifying potential subcategories for cost cutting. In the subsequent specification review process, they identify the current specifications, explore requirements and the issues of “who, why, and how,” and think of cost-cutting ideas for the subcategories.

4. Implementation
In the next step in this study, the idea checklist and design specification review described in Section 3 were implemented in a training course for the associate value specialist (AVS) program in a company. The AVS program is a certificate program for engineers who decide to become professional value engineers [32]. The program is based on a process known as a multistage job plan, which provides structure for value studies. The plan consists of six sequential steps: (1) the information phase, (2) the function analysis phase, (3) the alternative phase, (4) the evaluation phase, (5) the development phase, and (6) the presentation and implementation phase. The goal of the plan is to generate as many practical ideas as possible for later analysis. This shows that idea generation can be seen as the most important part of VE. This paper only describes the phase associated with the proposed method in the training course. Table 10 shows the appearance and component configuration of a handset used in this training. A hierarchical decomposition of the product or what is typically known as the bill of materials (BOM) is also shown in Table 10. Two cases were selected to demonstrate how the supportive method is implemented.

4.1. Implementation Case I
The proposed method was applied to handset cases ① and ② in Table 10, in order to demonstrate how it works. The function of the handset cases was to protect the internal parts of the handset, and their target costs were not being met. Few good alternatives were available, and so an idea checklist was employed to generate cost-cutting ideas. By checking the idea stimuli one at a time in a brainstorming session, four subcategories were developed by the engineers in the training program, as shown in Table 11.

In the second round, a specification review was conducted to explore the four subcategories based on specification data. The current design specification of the handset cases with respect to material is standard ABS (acrylonitrile butadiene styrene) V0. With regard to thermal characteristics, the regulations imposed on handset uppers are the UL (Underwriters’ Laboratories) and TUV (Technischer Überwachungs Verein) standards. The history of the design was explored, and it was found that the existing design specification involved using heat-resistant resin, as imposed by UL/TUV standards, primarily to impede fires in the phone line. The specification review resulted in examining the following idea form: 〈Material, Same material of a lower grader replacement, Handset cases_ABS (to ABS HB)〉 by questioning what problems you expect and how you overcome them, because ABS HB (hard board) has the same functional specifications as ABS V0, and is also heat-resistant.

The next subcategory concerned the thickness of the handset cases. The written specifications for the cases describe a thickness of 2.5 mm, as in the schematic drawing. However, the measured thickness of the handset was 2.8 mm, which was over specifications. The safety regulations imposed on handset cases dictate that they must not break under 5Ns impact. Furthermore, a review of the history of the handset design revealed that the existing design specifications had been set up without adequate specification review. The specification review resulted in examining the following idea form: 〈Dimension, Thickness reduction, Headset case_0.28 t (to 0.25 t)〉. It should have investigated the thickness needed to withstand the impact of 5 Ns. The application of an appropriate specification review process to the handset cases is summarized in Table 12.

4.2. Implementation Case II
Table 13 shows an example of idea generation for the PBA SUB-etc. MIC (⑥) and CFH (⑨) in Table 10, for a function in which an electrical signal is passed to the modular jack. Four subcategories were chosen from the idea checklist for further investigation.

A specification review was conducted to further explore the four subcategories in a systematic manner, based on specification data. The form/structure subcategory concerned the integration of the PBA SUB-etc. and CFH. In the existing structure, the CFH and the PCB-handset MIC were detachable at the modular jack, with the modular jack soldered onto the PCB-handset MIC in PBA SUB-etc. The safety regulations imposed on the CFH were unknown. The actual structure of the CFH and the PCB-handset MIC can be split. An examination of the history of the design revealed that the existing structure was set up by an engineer due to problems related to repairs after sales. Therefore, the relevant after-sales claim rates need to be investigated to decide whether the CFH and the PCB-handset MIC should be separated. The idea generated from this specification review was to examine the feasibility of soldering the CFH directly to the PCB-handset MIC without the modular jack, if rates of after-sales repairs were low or nonexistent.

The second subcategory is related to the length of the CFH. The existing length of the CFH was 300 ± 20 cm. The actual measured length was 305 cm. The safety regulations imposed on the CFH were unknown. A review of the history of the design showed that the existing specifications had been set without adequate specification review. The actual length is within the given range, meaning that the current length has been set appropriately with respect to the current specifications. The idea generated from this specification review was to examine the length of other commercial models in order to benchmark them for comparison with the current design specification. The application of the specification review process to the PBA SUB-etc. and CFH is summarized in Table 14.

tab14
Table 14: Specification review process for PBA SUB-etc. and CFH.
5. Evaluation
A preliminary evaluation of the proposed method for brainstorming was conducted by implementing the method in a training course, in order to determine whether it could be used as a supplementary method to help engineers generate ideas. We assembled ten brainstorming groups. Each group was made up of 4-5 persons. We introduced the purpose of the test and provided the method, along with the product. The experiment was conducted just after brainstorming, without applying the method. The results of the preliminary test are shown in Table 15.

tab15
Table 15: Preliminary test results for the proposed method.
The total numbers of ideas generated by brainstorming without and with the supportive method were 75 and 219, respectively. Through the use of the supportive method, the average number of ideas improved from 7.5 to 21.9, which is an increase of 293%. These results of the preliminary test result suggested that the use of the supportive method for brainstorming resulted in training outcomes that were significantly better than those achieved through brainstorming alone.

A most significant observation was made during the test. When running through the checklist, the leader of one group asked, “Taking this idea checklist into account, how might I check this specification? What effect will this idea have on the problem?” as well as other similar questions. The other members of the group answered the questions. We observed that the checklist stimulated the participants, who had trouble remaining alert during the brainstorming session in which the supportive method was not used.

6. Discussion
Our evaluation of the training effectiveness of the method showed that participants felt that it made positive contributions to their brainstorming behaviors. This suggests that the method reinforces brainstorming by providing a more efficient approach to generating ideas. However, our interviews with several VE experts revealed a somewhat different reality.

For our study, we also examined people’s attitudes toward this method. In a postexperimental survey, eight of 10 groups said that the method was either helpful (six groups) or sometimes helpful (two groups). Some participants informally praised the method, and one volunteered that the method was helpful for him because the idea checklist and review process smoothly guided idea generation. Another got quite excited about the effectiveness of the method and stated that he planned to introduce it to his team members, who work on home appliance development. However, some participants criticized the method, arguing that the idea stimuli such as dimension, amount, and size are well-known approaches in VE, and thus the method is only effective for entry-level engineers. For senior engineers who have experience in their fields, the method may even limit idea generation. Hence it is necessary that engineers expand on checklists with as many feasible alternatives as possible.

In general, a specification review is an important part of second-look VE. It provides essential technical details on the materials or processes to be used in developing a product that conforms to customer requirements. Product nonconformance is often associated with inadequate specification review. Engineers often set design specifications without adequate specification review due to a lack of time and information. Problems of this type can be avoided with a well-planned and managed specification review procedure. Therefore, specification reviews are a necessary process for further exploring ideas that need to be visualized by engineers.

7. Conclusion
This study presents a supportive method for supplementing brainstorming activities that do not play a role as starting points for second-look VE. The supportive method for brainstorming consists of two parts: an idea checklist and a specification review process. In the brainstorming session, engineers use the idea checklist to review a current product and come up with individual cost-cutting ideas. By listing each item, they ensure that none are overlooked in generating ideas. If some ideas need to be further investigated, they systematically review the specifications along with the idea checklist.

The proposed method was applied to a consumer headset to demonstrate how it forms idea stimuli and reminds engineers of possible ways to approach a problem or shape a solution. A preliminary evaluation indicated that the specification review method was effective in generating ideas for later analysis. Future development of this “ideating via checklist” method is planned, beginning by generating checklists for other products. This study can be used to help those who are looking for ways to produce new and better cost-cutting ideas.


Conflict of Interests
The authors certify that there is no conflict of interests with any financial organization regarding the material discussed in the paper.

Acknowledgments
This research was supported by the Basic Science Research Program through the National Research Foundation of Korea and was funded by the Ministry of Education, Science, and Technology (NRF-2010-0022344).

References
L. Miles, Techniques of Value Analysis Engineering, McGraw-Hill, 1972.
Save International, Value Methodology Standard and Body of Knowledge, 2007, http://www.value-eng.org/pdf_docs/monographs/vmstd.pdf.
J. J. Kaufman, Value Engineering for the Practitioner, North Carolina State University, Raleigh, NC, USA, 1985.
D. J. Gerhardt, Ingersoll-Rand Uses VE in New Product Development: A Strategy for Business Survival in the 21st Century, 2011, http://www.value-eng.org/knowledge_bank/attachments/IR%20Uses%20VE%20in%20New%20Product%20Development.pdf.
G. Lee, H. C. Lee, and S. S. Go, “A study on the optimum selection of decision-making to the analysis stage of design VE using ASIT,” Journal of the Architectural Institute of Korea, vol. 25, no. 1, pp. 177–184, 2009. View at Google Scholar
N. Onaya, “A New Method for Generating Creative Ideas in Manufacturing VE for Mature products,” 2014, http://www.value-eng.org/knowledge_bank/attachments/T10508.pdf.
S. Y. Choo, Principles and Methods of Creative Idea Generation, Ulsan University, Ulsan, South Korea, 2007.
C. Fallon, Steps in the Search Pattern in Value Analysis to Improve Productivity, John Wiley & Sons, New York, NY, USA, 1971.
R. B. Stewart, Fundamentals of Value Methodology, Xlibris Corporation, Bloomington, Ind, USA, 2005.
A. B. Van Gundy, Idea Power: Techniques and Resources to Unleash the Creativity in Your Organization, AMACOM, Amacom, NY, USA, 1992.
A. F. Osborn, Applied Imagination: Principles and Procedures of Creative Thinking, Scribner, New York, NY, USA, 1953.
Infinite Innovations, “Preparing for a Successful Brainstorming Session,” http://www.brainstorming.co.uk/tutorials/preparingforbrainstorming.html.
T. C. Fowler, Value Analysis in Design, Competitive Manufacturing Series, Van Nostrand Reinhold, New York, NY, USA, 1990.
A. Dell’Isola, Value Engineering: Practical Applications for Design, Construction, Maintenance and Operations, RSMeans Series, Wiley, 1997.
H. J. Brightman, Problem Solving: A Logical and Creative Approach, College of Business Administration, Georgia State University, Atlanta, Ga, USA, 1980.
J. Brown, Value Engineering: A Blueprint, Industrial Press, New York, NY, USA, 1992.
S. J. Kirk, M. Spreckel, and F. Kent, Enhancing Value in Design Decisions, University of Michigan, Ann Arbor, Mich, USA, 1993.
D. E. Parker, Management Application of Value Engineering for Business and Government, The Lawrence D. Miles Value Foundation, Washington, DC, USA, 1994.
B. Mullen, C. Johnson, and E. Salas, “Productivity loss in brainstorming groups: a meta-analytic integration,” Basic and Applied Social Psychology, vol. 12, no. 1, pp. 3–23, 1991. View at Publisher · View at Google Scholar
M. Diehl and W. Stroebe, “Productivity loss in brainstorming groups: toward the solution of a riddle,” Journal of Personality and Social Psychology, vol. 53, no. 3, pp. 497–509, 1987. View at Publisher · View at Google Scholar · View at Scopus
W. Stroebe and M. Diehl, “Why groups are less effective than their members: on productivity losses in idea-generating groups,” European Review of Social Psychology, vol. 5, no. 1, pp. 271–303, 1994. View at Publisher · View at Google Scholar
T. J. Kramer, G. P. Fleming, and S. M. Mannis, “Improving face-to-face brainstorming through modeling and facilitation,” Small Group Research, vol. 32, no. 5, pp. 533–557, 2001. View at Publisher · View at Google Scholar · View at Scopus
V. L. Putman, Effects of additional rules and dominance on brainstorming and decision making [Ph.D. thesis], University of Texas at Arlington, Arlington, Tex, USA, 2001.
J. J. Sosik, B. J. Avolio, and S. S. Kahai, “Effects of leadership style and anonymity on group potency and effectiveness in a group decision support system environment,” Journal of Applied Psychology, vol. 82, no. 1, pp. 89–103, 1997. View at Publisher · View at Google Scholar · View at Scopus
M. A. Al-Ghamdi, “Five steps for more effective implementation of brainstorming in value engineering studies,” 2004, http://www.value-eng.org/knowledge_bank/attachments/200403.pdf.
J. Mandelbaum, Value Engineering Handbook, Institute for Defense Analyses, Alexandria, Va, USA, 2006.
B. Eberle, SCAMPER : Creative Games and Activities for Imagination Development, Prufrock Press, Austin, Tex, USA, 1981.
R. M. Felder, “Creativity in Engineering Education,” Chemical Engineering Education, vol. 22, no. 3, pp. 120–125, 1988. View at Google Scholar
D. Mann and S. Dewulf, “Evolving the world’s systematic creativity methods,” in Proceedings of the 7th European Association of Creativity and Innovation Conference, University of Twente, Enschede, Netherlands, 2001.
D. W. Clarke, “Integrating TRIZ with value engineering: discovering alternatives to traditional brainstorming and the selection and use of ideas,” in Proceedings of the International SAVE Conference, San Antonio, Tex, USA, 1999.
D. Hannan, “Value methodology, creative problem solving strategies and TRIZ,” in Proceedings of the SAVE International Conference, Society of American Value Engineers, 2000.
Certification Program, http://www.value-eng.org/education_certification.php.


You can download pdf from journal site  https://www.hindawi.com/journals/tswj/2014/682051/

Friday, October 19, 2018

Productivity Improvement of Lathe - Turning Operations





Machine Work Study for Cost Reduction and Production Improvement

__________________

__________________


2018

Seco’s PCA system for Machining Cost  Reduction


Manufacturers who utilize Seco’s  Machining Productivity Cost Analysis (PCA) system can typically expect to benefit from total cost savings of up to 30 percent and productivity increases of up to 40 percent, regardless of the industry sector they serve.
https://www.cnctimes.com/articles/singleArticle/3804


2017


Productivity Theory for Industrial Engineering
By Ryspek Usubamatov
https://books.google.co.in/books?id=W7xaDwAAQBAJ&pg=1#v=onepage&q&f=false

Okuma’s new 2SP-2500H CNC lathe featuring smart machine productivity
24 October, 2017     
Okuma has launched the 2SP-2500H two-spindle CNC lathe, with innovative front-facing twin spindles to provide much higher levels of productivity and far greater reliability, for auto parts and other mass production applications. The 2SP-2500H is an automation-ready machine that integrates two lathes into one unit with a standard loader that feeds blanks for continuous front and back work.
https://www.cnctimes.com/editorial/okumas-new-2sp-2500h-cnc-lathe-featuring-smart-machine-productivity

http://www.machiningnews.com/2017/10/intelligent-machine-productivity-in-a-compact-footprint/


2016

TRIPLE-TURRET TURNING MACHINE INCREASES PRODUCTIVITY BY 86%

Case Studies    |    8 March, 2016
An Italian-built Biglia CNC lathe with twin-opposed spindles and three Y-axis turrets supplied by Whitehouse Machine Tools has taken over the manufacture of terminal lugs from 38 mm diameter copper bar at the Plymouth factory of subcontractor Morris Engineering.

The improvement has been dramatic. One-hit cycle time to machine the component at both ends has been reduced to just three minutes, compared to 21 minutes previously required by a twin-spindle lathe with a single Y-axis turret, which has now been replaced by the Biglia turning centre.
http://www.wmtcnc.com/case-studies/triple-turret-turning-machine-increases-productivity-by-86/



2006
Gear Manufacturer Gains Efficiency With Tool Management System
Avon Gear Company (Rochester Hills, Michigan)  Partnered by SECO Tools PCA system
Case Study Post: 12/21/2006
https://www.mmsonline.com/articles/gear-manufacturer-gains-efficiency-with-tool-management-system




Related

E-Factory of Misubhishi in Action
https://www.cnctimes.com/editorial/the-e-fctory-in-action-mitsubishi-electric

Thursday, October 18, 2018

Machine Tool Utilization Improvement - Cutting Time and Cost Reduction



Foundation Essay

Machine Tool Improvement and Cutting Time Reduction - Machine Effort Industrial Engineering - F.W. Taylor
https://nraoiekc.blogspot.com/2017/07/machine-tool-improvement-and-cutting.html


2018


The original machining time is 670 s. With the new optimal feed rate, the machining time can be reduced by 239 s, approximately 35% less when compared with the un-optimal case.



Development of smart machining system for optimizing feedrates to minimize machining time
Hong-seokPark, BowenQ, Duck-VietDang, Dae Yu Park

Journal of Computational Design and Engineering
Volume 5, Issue 3, July 2018, Pages 299-304
open access
https://www.sciencedirect.com/science/article/pii/S2288430017301987


Correlation between Machine Monitoring Signals, Cutting Tool Wear and Surface Integrity on High Strength Titanium Alloys
Phd Thesis of Nathan Ray
Department of Mechanical Engineering
Sheffield University
June 2018

Wednesday, October 17, 2018

High Speed Machining




OrangeViseCompany
CNC Productivity Series - High Speed Machining - Part 1
_______________

_______________

13 Oct 2013
______________



_____________

The product detail related to the video
http://www.s2m.fr/E/4-APPLICATIONS/milling.html
70 KW at 30,000 rpm



Example on Page 86 of the book Metal Cutting Theory and Practice by Stephenson and Agapiou
Table 3.1

Std. High Speed Machine at 15,000 rpm gives 37% more productivity compared to 12,000 rpm std cnc machine. Advanced HSM at 20,000 rpm gives 79% more productivity compared to 12,000 rpm std machine.


Updated on 18 October 2018, 4 April 2015

Saturday, October 13, 2018

Jig and Fixture Design Book by Franklin D. Jones - Contents - 1920 Book


CONTENTS
CHAPTER I

PRINCIPLES OF JIG DESIGN
Objects of Jigs and Fixtures Difference between Jigs
and Fixtures Fundamental Principles of Jig Design
Locating Points Clamping Devices Weight of Jigs
Jigs provided with Feet Materials for Jigs General
Remarks on Jig Design Summary of Principles of Jig
Design Types of Jigs Open Jigs Box Jigs Details
of Jig Design 1-20

CHAPTER II
DESIGN OF OPEN DRILL JIGS
Jig Drawings Designing Open Jigs Improving the
Simple Form of Jig by Adding Locating Screws Providing
Clamps and Feet for the Jig Examples of Open
Drill Jigs 21-44

CHAPTER III
DESIGN OF CLOSED OR BOX JIG
General Procedure in the Design of Closed or Box Jigs-
Jigs for Rapid Production Special Features of Box Jigs
Examples of Closed or Box Jigs 45-6?

CHAPTER IV
JIG BUSHINGS
Removable Bushings Material for Jig Bushings -
Dimensions of Stationary Jig Bushings Miscellaneous
Types of Jig Bushings Means for Preventing Loose
Bushings from Turning Dimensions of Removable Bushings
Screw Bushings Special Designs of Guide Bushings
Methods of making Jig Bushings Hardening Jig
Bushings Grinding and Lapping. ....

CHAPTER V
LOCATING POINTS AND ADJUSTABLE
STOPS PAGES
Pins and Stops used as Locating Means Locating by
Means of V-blocks Cup and Cone Locating Points
Screw Bushings and Sliding Bushings used as Locating
Means Adjustable Locating Points Special Types of
Adjustable Stops Locating from Finished Holes Locating
by Keyways in the Work Common Defects in Jig Design 92-109


CHAPTER VI
JIG CLAMPING DEVICES
Types of Clamps Hook-bolts Screw-tightening Devices
Swinging Leaves Wedge or Taper Gibs Eccentric
Clamping Arrangements Applications to Jig
Design 110-150

CHAPTER VII

EXAMPLES OF DRILL JIG DESIGN
Different Types of Indexing Jigs Jig for Deep-hole
Drilling Jig of Simple Design for drilling Straight and
Angular Holes Drill Jig equipped with Milling AttachmentJig
for Cross-drilling Pistons and Facing Wristpin
Bosses Universal Jigs Machine Vises with Drill
Jig Attachments Miscellaneous Designs 151-194

CHAPTER VIII
BORING JIGS
Boring Jig of Simple Design Adjustable Boring Jigs
-
Boring Jig supported on Work Jigs designed for Supporting
Bar on One Side of Hole Only Jigs for Multiple
Boring Combination Drill and Boring Jig 195-210

CHAPTER IX
MILLING AND PLANING FIXTURES PAGES
Fixture for milling to a Given Length Duplex Fixture
-Adjustable Fixture for Angular Work Fixture arranged
for Lateral and Angular Adjustment Indexing
Milling Fixtures Various Designs of Radial Milling
Fixtures Examples of Planer Fixture Design 211-241

CHAPTER X
ADJUSTABLE FIXTURES FOR TURRET LATHES
AND VERTICAL BORING MILLS
Important Points in the Design Adjustable Fixture
for Holding Castings of Different Diameters Adjustable
Fixture for Special Bevel Gear Blanks Provision for
maintaining Accuracy in Adjustable Fixture Various
Designs of Adjustable Fixtures for Vertical Boring Mills. . . 242-256

CHAPTER XI
THE FLOATING PRINCIPLE AS APPLIED
TO FIXTURE WORK
Important Points in the Application of Floating Principle
Piston Drill Jig with Floating Clamps Drill Jig for
Rough Collar Drill Jig with Floating Bushings and
Locating Vees Milling Fixture with Floating Clamps
and Locator Various other Designs of Locating Devices
illustrating the Application of the Floating Principle 257-275

CHAPTER XII
APPLICATION OF THE THREE-POINT PRINCIPLE
IN FIXTURES
Three-point Locating and Clamping Devices Threepoint
Support for Flywheel Fixture Three-point Fixture
for Pot Casting Two Methods of Obtaining a Three-point
Support on a Hub Casting Fixture having Three Clamping
Jaws and Three Locating Pads Double Three-point
Locating Device 276-287

CHAPTER XIII
SPECIAL JIG AND FIXTURE MECHANISMS PAGES
Equalizing the Pressure of Clamping Devices Clamps
that draw the Work down Firmly on the Locating
Means Multiple-clamping Devices Clamping Devices
for Fixtures that do not interfere with the Tools used
Three-point Clamping Devices 288-305

CHAPTER XIV
PROVIDING FOR UPKEEP IN DESIGNING JIGS AND FIXTURES

Points Pertaining to Upkeep Drill Jig for a Receiver
Forging Drilling and Reaming Jig Indexing Fixture
for a Clutch Gear Fixture with Inserted Jaws Bevel
Gear Fixture with Adjustable Features Fixture for a
Hub Casting 306-315

https://archive.org/details/in.ernet.dli.2015.161105

Jigs and Fixtures - Designing for Upkeep

Notes From

Jigs and Fixture Design by Franklin D. Jones
1920

CHAPTER XIV
PROVIDING FOR UPKEEP IN DESIGNING JIGS
AND FIXTURES

It is important to include features for upkeep in the design of the various types of fixtures used in manufacturing work.

 In many cases provision for upkeep can be incorporated in the design without increasing the first cost of the fixture to any great extent, while in some  instances considerable extra outlay may be necessary. Much depends upon the accuracy required in the finished product and the number of pieces which are to be machined. For example, in gun work, when great quantities of parts are to be produced, no expense is spared in making the fixtures in as durable a manner as possible, and in making provision for the replacement of worn locating points, etc. On machine tool work,
however, discretion must be exercised, so that the expense of fixtures may be consistent with the required rate of production and accuracy of the work.


Many factors influence design in this regard. The size and general character of the work determine the type of machine on which the fixture is to be used, and, therefore, the need for stability and strength. The number of pieces to be machined is a factor which must be considered, for it is apparent that a small number does not require any special care to be taken in regard to the matter of upkeep.

In drill jig work, the locating points, bushings, and feet may be made so that they can be
readily replaced when abuse or wear of these parts tends to cause imperfect work. The probable necessity for replacements is naturally determined by the rate of production that is required.
Jigs and fixtures are often handled roughly and they should be constructed to withstand such usage.

Milling fixtures are frequently required to stand very heavy cutting so that great rigidity is an important feature in their construction. In the case of horizontal turret lathe fixtures or others which revolve about a fixed center, it may frequently be found desirable to make locating rings, points, or surfaces in such a way that adjustment can conveniently be made about this center.

Points Pertaining to Upkeep. A few noteworthy points of
construction are given herewith:

1. Location of the work.
This is of primary importance and the various fixed points
provided in the fixture should be made in such a way that they
can either be readily replaced or adjusted, according to cir
cumstances.

2. The number of pieces to be machined should
receive proper consideration in the design, both in regard to
cost of the fixture and in regard to probable necessity of replacements.

3. Weight and rigidity of the fixture. This point
is naturally somewhat dependent upon the class of work for
which it is intended, and the convenience of handling.

4. Gibs.
In the case of indexing or sliding fixtures, suitable provision
should be made for adjustment by means of gibs or straps, in
order that natural wear may be taken up.

5. Revolving fixtures.
Fixtures which revolve about a fixed center, if subjected
to hard usage or if used for a great number of pieces, may be
advantageously provided with means of adjustment about the
center of revolution. This is a refinement that is very infrequently
used, and it is not necessary in the majority of cases
unless extreme accuracy is required.





Friday, October 12, 2018

An Industrial Engineer on US National Television - Natalia Azoqa

Natalia Azoqa, Industrial engineer is a participant in reality TV program Survivor - Season 37

Natalia Azoqa, Industrial engineer, 25 years old, lives in California.

As an industrial engineer, it's Natalia's job to improve processes.

She has to plan on improving the process of winning Survivor. She plans to become the final survivor.


Age: 25
Hometown: Irvine, California
Current residence: Irvine, California
Occupation: Industrial Engineer


Related news

https://greatsystems.com/2018/09/industrial-engineer-survivor/

https://www.cbs.com/shows/survivor/cast/215959/

https://www.hollywoodreporter.com/lists/survivor-season-37-goliath-tribe-1145224/item/survivor-37-alec-1145243

Sunday, October 7, 2018

Designer Productivity - Theories, Thoughts and Techniques



2018

ThingWorx Navigate Productivity Calculator


With ThingWorx Navigate, organizations can not only expect to see a spike in engineering productivity, but also productivity increases for downstream teams such as manufacturing, purchasing, marketing and the supply chain. Use this simple calculator to estimate your company's potential annual productivity savings.

https://www.ptc.com/en/products/plm/plm-products/navigate/productivity-calculator


OrCAD PCB Productivity Toolbox
Improving PCB designer productivity
https://www.orcad.com/sites/orcad/files/resources/files/OrCAD_Productivity_Toolbox_DS_Final.pdf

What is OrCAD PCB Productivity Toolbox?

OrCAD® PCB Productivity Toolbox is a comprehensive suite of utilities seamlessly integrated with OrCAD PCB Editor that improves the overall productivity and efficiency of PCB layout designers. It provides PCB designers with a collection of design- time- reducing functions as well as advanced design- function enablers that enhance and optimize existing PCB layout capabilities.
https://www.orcad.com/products/orcad-pcb-productivity-toolbox/overview




New Functionality Improves PCB Designer’s Productivity
April 3, 2017
http://www.milaero.iconnect007.com/index.php/article/103468/new-functionality-improves-designers-productivity/103471/?skin=design

Research Report - Designer’s Productivity
2017
A Belani, Archana
https://www.id.iit.edu/wp-content/uploads/2017/02/58aa583e76228.pdf


2015
High-Level Synthesis: Boosting Designer Productivity and Reducing Time to Market
Sharad Sinha ; Thambipillai Srikanthan

 IEEE Potentials > Volume: 34 Issue: 4

2008

Smart Planet 3D for Designer Productivity - InterGraph 4

2007
IDE-based tools enhance designer productivity in
embedded applications
Development tools—hardware, software and reference designs— are playing a crucial role in supporting the embedded designer, as the pressure to get products to market faster mounts. In particular, IDE tools, together with application-specific software libraries and reference designs, are enabling automotive embedded designers to focus on important design details.
Jin Xu, Priyabrata Sinha and Jorge Zambada | May 31, 2007
https://www.electronicdesign.com/automotive/ide-based-tools-enhance-designer-productivity-embedded-applications


1992
Improving Designer Productivity [microform]
Gary C. Hill
https://search.lib.virginia.edu/catalog/u2117891
https://naca.larc.nasa.gov/search.jsp?R=19920071661&qs=N%3D4294949075%2B4294940472%2B4294966753
https://arc.aiaa.org/doi/abs/10.2514/6.1992-1187


1984
Effective logic analysis techniques for increased design productivity
Author links open overlay panelJ.D.BlattnerJ.P.HuberC.A.Nobles

Over the past ten years, electronic product designs have gradually shifted from an analog to a digital emphasis. The impact of this shift has been significant. It has changed both the way products are designed and the tools used to design them. Specifically, logic analysis has become one of the most effective tools for digital design. As logic analyzers evolved, designers became more familiar with their use and more productive when using them. It is this concept of higher productivity that forms the basis for this discussion of the logic analyzer evolution and the role it has played in increasing designer productivity and efficiency.

Microelectronics Journal
Volume 15, Issue 3, May–June 1984, Pages 23-29
https://www.sciencedirect.com/science/article/pii/S0026269284801378