Monday, December 29, 2025

January - Industrial Engineering Lessons - Notes - Industrial Engineering Knowledge Center

 

Productivity Measurement


306. Productivity Measurement

Measuring Productivity - OECD
http://www.esri.go.jp/jp/workshop/050325/050325paper06.pdf

{Productivity Measurement within a new architecture for the U.S. National Accounts: Lessons for Asia  http://www.apo-tokyo.org/files/mp_apo-keo_jorgenson_lec.pdf not available now.]

APO 2019 Productivity Data Book
https://www.apo-tokyo.org/publications/wp-content/uploads/sites/5/APO-Productivity-Databook-2019_light.pdf


How to Measure Company Productivity using Value-added: A Focus on Pohang Steel (POSCO)
http://www.anderson.ucla.edu/faculty/marvin.lieberman/docs/Lieberman_POSCO.pdf

The productivity slump—fact or fiction: The measurement debate
August 2016
https://www.brookings.edu/research/the-productivity-slump-fact-or-fiction-the-measurement-debate/

Estimates of Industry Multifactor Productivity, 2017-18
https://www.abs.gov.au/AUSSTATS/abs@.nsf/Lookup/5260.0.55.002Main+Features12017-18?OpenDocument


Measuring developer productivity in 2019 for data-driven decision makers
https://www.gitclear.com/measuring_developer_productivity_a_comprehensive_guide_for_the_data_driven
By Bill Harding
Last updated July 19, 2019.

307. Total Factor Productivity & Total Productivity Measurement

Waste Measurement

Waste measurement is highlighted by Taiichi Ohno and other Toyota industrial engineers. Material and information flow diagram is totally Toyota invention and it measures and highlights inventory. A setup time is the variable that controls inventory (lot size), it records setup times.

Taking the cue from TPS, industrial engineering discipline has to start measurement of waste as industrial engineering measurement area.

311. Seven Wastes - Taiichi Ohno List -  Toyota Production System Focused Waste Elimination
https://nraoiekc.blogspot.com/2013/01/chapter-seven-wastes-model-2013-edition.html

Losses identified in TPM

312. 16 Losses given by Yamashina in Manufacturing Cost Reduction Deployment
https://nraoiekc.blogspot.com/2012/04/manufacturing-system-losses-idenfied-in.html

313. Rother-Shook Value Stream Mapping (VSM - MIFD) to Identify Inventory Accumulations in Supply -Production -Distribution Process
https://nraoiekc.blogspot.com/2013/10/value-stream-mapping-origins.html


322. Engineering Economy or Engineering Economics: Economic Decision Making by Engineers
http://nraomtr.blogspot.com/2011/11/engineering-economy-or-engineering.html


326.Industrial Engineering Projects - Formulation and Economic Feasibility Analysis.
https://nraoiekc.blogspot.com/2022/02/industrial-engineering-projects.html

327. Present-Worth Comparisons of Industrial Engineering Projects. Industrial Engineering Economic Analysis.
http://nraomtr.blogspot.com/2011/11/present-worth-comparisons.html

328.  Rate-of-Return Calculations of Industrial Engineering Projects. Industrial Engineering Economic Analysis.
http://nraomtr.blogspot.com/2011/11/rate-of-return-calculations.html

329. Equivalent Annual-Worth Comparisons of Industrial Engineering Projects.
http://nraomtr.blogspot.com/2011/11/equivalent-annual-worth-comparisons.html



NPV - IRR and Other Summary Project Assessment Measures



Rate-of-Return Calculations


Equivalent Annual-Worth Comparisons

331. Replacement Decisions.
http://nraomtr.blogspot.com/2011/11/replacement-analysis.html


Case Studies



Inkjet Versus Laser Printing - Engineering Economics

Productivity Improvement Using Rapier Looms in Place of Shuttle Looms - IE Economic Analysis.

Robots - Engineering Economic Analysis

Robotic Applications in Indian Companies - Engineering Economic Analysis

Productivity Management Module

336. Productivity Management. Module of Industrial Engineering Online Course Notes

337. Functions of Productivity Management

338. The Evolution of Productivity Management

339. Productivity Management - F.W. Taylor

340. Productivity Management in Operations Management Since 1886

341. Productivity Management - Improving Productivity - Stevenson in Operations Management Book

342. Functional Foremanship - F.W. Taylor

        Productivity - Basic Concepts

Harrington Emerson - 12 Principles of Efficiency - Productivity Management

343. Harrington Emerson - The Twelve Principles of Efficiency - Part 1 - Principles of Productivity Management

344. Harrington Emerson - The First Efficiency Principle: Clearly Defined Ideals (Objectives and Goals)

345. Industrial Engineering Data. Harrington Emerson - The Sixth  Efficiency Principle: Reliable, Immediate, Adequate, and permanent Records. 

346. Harrington Emerson's The Seventh Efficiency (Productivity Management) Principle: Despatching.




No comments:

Post a Comment