Ubiquity of Industrial Engineering Principle of Industrial Engineering
Illustration: Google's Engineering Productivity Department - Evolution of the Department through Automation of Testing. Emergence of Software Engineering Productivity Engineer & Specialist.
Information for IE - Case 49 - Industrial Engineering ONLINE Course.
Flow Process Chart Operations - Value-Adding Operation - Inspection - Transport - Temporary Delay - Storage - Information
Information added in flow process chart steps by Narayana Rao K.V.S.S. (1 July 2020)There is a three way break up of time in a process.
Value added activity time + Non-value added activity time + No value added time.
Cost is incurred all the time.
Information for Operation Analysis of Value-Adding Operation - Inspection - Transport - Temporary Delay - Storage - Information
----------------------------------------------------------------Productivity Improvement of Information Systems through Systems Level IE Studies and Operation Level IE Studies
Enhance productivity
ERADICATE INEFFICIENCIES
Reduce time spent on pointless activities and breakthrough traditional IT structures. Enjoy faster operations by augmenting your ops guys with actionable, contextual, and cross-silo intel.
Realize the true value of your IT
Netenrich delivers productivity, enables cost efficiencies, and provides immersive customer experiences to increase the business value of IT. Realize significant ROI through:
An always-on IT environment with a focus on maintenance, security, and reliability.
Operational intelligence to make faster and better decisions.
Right context and insights into problems for enhanced collaboration.
IT spend optimization to eliminate wastage and reallocate savings to critical IT functions.
Request a test drive of Netenrich’s platform. Sign up and we'll get you started.
https://netenrich.com/solutions/plan-it-roi/productivity/eliminate-inefficiencies/test-drive/
Increasing HPC Cluster Productivity Through System Resource Tracking
May 18, 2020 by staffDownload the white paper
This white paper from Bright Computing, “Increasing HPC Cluster Productivity Through System Resource Tracking” addresses the necessary steps to give administrators, managers, and users the information they need to use HPC system resources effectively, to maximize system productivity, to enable effective resource sharing, to identify waste and to provide charge-back capability.
https://insidehpc.com/2020/05/increasing-hpc-cluster-productivity-through-system-resource-tracking/
-----------------------------------------------------------------------------------
June 23, 2020
Logistics Information System Problem - Information Defects Causing $55 Million Extra Cost to User - Supplier: Lockheed Martin
An ongoing House Oversight and Reform Committee with the chairwoman, Rep. Carolyn Maloney, in a June 18 letter to Lockheed’s new chief executive, James Taiclet highlighted that the Department of Defense incurring extra costs because of deficiencies in the data fed to the software system that supports the F-35, called the Autonomic Logistics Information System or ALIS.
In response company spokesman said in a statement that Lockheed Martin had made several improvements to the process to improve the performance.
Each electronic log of a spare part consists of detailed data, including a part’s history and remaining service life. But, the data is not complete and correct for many parts. Staff reported that bases continue to receive spare parts without electronic equipment logs, or logs that incorrect, corrupt or missing. Staff of a based reported that 60 percent of the parts it received from June through November 2019 had logging problems. The problem was considered so serious that the problem was labeled a “category 1″ deficiency last year. Later, it was downgraded to the lesser “category 2” based on the ALIS data quality improvements that have been made in the last two years based on the earlier complaint. Subsequent to the complaint and follow up activity, the number of parts considered “ready to issue,” at bases increased from an average of only 50 percent to a high of 87 percent. This improvement occurred after a Lockheed and JPO team discovered that one major driver of electronic log problems were discrepancies created when the “advanced shipping notice,” ws entered in the system. Lockheed implemented a new software fix that validates that part numbers in the advanced shipping notices match with the part numbers correspond to an existing F-35. The company has now the target of 90 percent “ready to issue” requirement to reach by 2021 and Lockheed has plans to put into place additional software changes.
The problem Lockheed is facing is an important example showing the necessity of Inspection Operation Analysis
Animals (Basel). 2020 Jan; 10(1): 111.
The Use of Computer Records: A Tool to Increase Productivity in Dairy Herds
https://www.ncbi.nlm.nih.gov/pmc/articles/PMC7022969/
Customer Information System Satisfaction and Task Productivity:
The Moderating Effect of Training
Norfazlina, G.a*†, Sharidatul Akma, A.S.a , Nurul Adrina, S. & Noorizan, M.M.
Procedia Economics and Finance 37 ( 2016 ) 7 – 12
https://www.sciencedirect.com/science/article/pii/S2212567116300855/pdf?md5=9eb6f1944cc44dcc54c2771217a59c62&pid=1-s2.0-S2212567116300855-main.pdf
________________________________________________
$2 Trillion Waste In IT Systems? What are we doing?
https://nraoiekc.blogspot.com/2012/12/2-trillion-waste-in-it-systems-what-are.htmlLean Software Development and IT Enabled Services
https://nraoiekc.blogspot.com/2012/04/lean-software-development-and-it.html
About Hardware Used in Information System
http://nraomtr.blogspot.com/2016/03/about-hardware-used-in-information.html
Software: Systems and application software - Summary of Stair and Reynolds Book Chapter
https://nraomtr.blogspot.com/2016/03/software-systems-and-application.html
_________________________________________________
Productivity measures for information systems
Richard A.Scudder A.Ronald Kucic
Information & Management
Volume 20, Issue 5, May 1991, Pages 343-354
https://www.sciencedirect.com/science/article/abs/pii/037872069190033X
Productivity and Quality Management: A Modular Programme - Part II: High Potential Productivity and Quality Improvement Areas (APO - ILO, 1997, 630 p.)
MODULE 22: Information management
UNIT 3: Making management information systems (MIS) effective
3.1 Managing MIS productivity
3.2 Starting at the top: IT strategy
http://www.nzdl.org/gsdlmod?e=d-00000-00---off-0cdl--00-0----0-10-0---0---0direct-10---4-------0-0l--11-en-50---20-about---00-0-1-00-0--4----0-0-11-10-0utfZz-8-10&cl=CL1.2&d=HASH258015fa0bf2f0378804ba.14.4.2>=1
Updated on 19 July 2021, 10 July 2020, 5 July 2020
Great blog!!!
ReplyDeleteTransport software improves the visibility in real time, which is critical in a complex logistical process. Real-time track and trace allows you to track the movement of goods whether they are shipped by land, sea, or air. On your TMS dashboard, evaluate the efficiency of your operations and track key performance indicators (KPIs). And improve route efficiency: a modern TMS can generate optimal routing proposals dynamically, identifying shorter or less congested routes and adapting to unforeseen obstacles in real time.