Monday, September 12, 2022

Deming Improvement Cycle (Plan, Do, Check, Adjust) - Industrial Engineering Application

 

I posted in LinkedIn

Deming improvement ideas and experiments. Deming improvement cycle (Plan, Do, Check, Adjust).

https://www.linkedin.com/posts/narayana-rao-kvss-b608007_deming-improvement-ideas-and-experiments-activity-6974571295904526336-1__V

Comments.

Nuggenahalli Narahari

Professor of the Department at RV College of engineering


Love this.


Mohammad Inam

Executive Vice President Operations at Steel Infra Solutions


Well said, Adjustment is the key !



Deming PDCA cycle is very popular. It is an important idea for industrial engineering. Every IE improvement or redesign concept has to be properly planned or designed, Its prototype has to be prepared and checked or tested for the expected result. Any deviation is to be measured and appropriate adjustments are to be done. Then only it can be commercialised or productionized. Industrial engineering involves detailed engineering and PDCA cycle has to be used.

No comments:

Post a Comment