Friday, May 26, 2023

Basic MOST - UMAS, Pune - 5 Day Program

 UMAS Pvt. Ltd. – An Industrial Engineering Consulting Firm


PROGRAM SCHEDULE

The UMAS Training Program schedule is as follows –

Day Start End Topic

Day 1

9:00 AM 11:00 AM LEMW Concept, Case Studies, Application of MOST

11:00 AM 11:10 AM Break

11:10 AM 11:50 AM Introduction to MOST, Benefits of MOST, Families

11:50 AM 12:50 PM General Move ( Sequence A B G A B P A)

12:50 PM 1:30 PM Lunch

1:30 PM 3:30 PM General Move (A - Action Distance, B - Body Motion, G - Gain Control, P - Placement)

3:30 PM 3:40 PM Break

3:40 PM 5:00 PM General Move (Example)

5:00 PM 6:00 PM General Move (Video)

3 Hours Home Work

Day 2

9:00 AM 11:00 AM General Move (Lab Exercise)

11:00 AM 11:10 AM Break

11:10 AM 11:40 AM Control Move Sequence ( A B G M X I A)

11:40 AM 12:50 PM Control Move (Parameters M - Move/Actuate, X - Process Time, I - Alignment)

12:50 PM 1:30 PM Lunch

1:30 PM 3:30 PM CT AC CW Exercise (Manpower and Production Capacity)

3:30 PM 3:40 PM Break

3:40 PM 5:00 PM Control Move Examples

5:00 PM 6:00 PM Control Move Video

3 Hours Home Work

Day 3

9:00 AM 11:00 AM Control Move (Lab Exercise)

11:00 AM 11:10 AM Break

11:10 AM 11:40 AM Tool Use Fasten/Loosen Sequence (A B G A B P F/L A B P A)

11:40 AM 12:50 PM Tool Use Multiple Fasteners (P A F/L)x Freq

12:50 PM 1:30 PM Lunch

1:30 PM 3:30 PM Tool Use Exercise and Video

3:30 PM 3:40 PM Break

3:40 PM 5:00 PM C : Cut, S - Surface Treat, M - Measure, R - Record, T - Think

5:00 PM 6:00 PM Examples

3 Hours Home Work

Day 4

9:00 AM 11:00 AM Tool Use (Lab Exercise)

11:00 AM 11:10 AM Break

11:10 AM 11:40 AM MOST Theory (Special Situation and Tools, Balancing Time/Effect)

11:40 AM 12:50 PM Topic Presentation

12:50 PM 1:30 PM Lunch

1:30 PM 3:30 PM Application of MOST Practical Approach and Examples

3:30 PM 3:40 PM Break

3:40 PM 5:00 PM MDAT Software Demonstration

5:00 PM 6:00 PM Queries Solve

Day 5 9:30 AM 12:30 PM Exam [100 Marks- 3 hours] [80+ Passing]




Three M.O.S.T. sequences are needed for describing manual work and a fourth for 

measuring the movements of objects with manual cranes.

 The General Move Sequence (for the movement of object freely through air)

 The Controlled Move Sequence (for the movement of object when it remains in contact 

with the surface or is restricted in its movement)

 The Tool Use Sequence (for the usage of common hand tools)



General Move ABG ABP A

A – action distance

B – body motion

G – gain control

P – placement



Controlled Move ABG MXI A

M – move controlled

X – process time

I – alignment


Tool Use ABG ABP * ABP A

F/L – fasten/loosen

C – cut

S – surface treat

M – measure

R – record

T – think


MOST Procedure:

1. Watch job/task

2. Determine sequence(s) to use

3. Determine index values

4. Add index values to determine TMU

5. Multiply TMU by 10

6. Convert TMU to seconds, minutes, hours

 Example:

General Move:

Move 8 steps, take a bottle of water from ground, move further 4 steps, keep it on the 

table and return back.

A16 B6 G1 A6 B0 P1 A24

= 16 + 6 + 1 + 6 + 0 + 1 + 24 = 54 * 10 = 540 TMUs

= 540 * 0.036 = 19.44 Second


Based on Table Values


See table

https://www.researchgate.net/figure/General-move-card-adapted-from-Zandin-2003_tbl1_303863041


https://www.slideshare.net/SohitChauhan1/most-maynard-operation-sequence-technique


https://virtualfactory.gitbook.io/vlft/tools/most/how-to-start

https://virtualfactory.gitbook.io/vlft/tools/most/formalise