UMAS Pvt. Ltd. – An Industrial Engineering Consulting Firm
PROGRAM SCHEDULE
The UMAS Training Program schedule is as follows –
Day Start End Topic
Day 1
9:00 AM 11:00 AM LEMW Concept, Case Studies, Application of MOST
11:00 AM 11:10 AM Break
11:10 AM 11:50 AM Introduction to MOST, Benefits of MOST, Families
11:50 AM 12:50 PM General Move ( Sequence A B G A B P A)
12:50 PM 1:30 PM Lunch
1:30 PM 3:30 PM General Move (A - Action Distance, B - Body Motion, G - Gain Control, P - Placement)
3:30 PM 3:40 PM Break
3:40 PM 5:00 PM General Move (Example)
5:00 PM 6:00 PM General Move (Video)
3 Hours Home Work
Day 2
9:00 AM 11:00 AM General Move (Lab Exercise)
11:00 AM 11:10 AM Break
11:10 AM 11:40 AM Control Move Sequence ( A B G M X I A)
11:40 AM 12:50 PM Control Move (Parameters M - Move/Actuate, X - Process Time, I - Alignment)
12:50 PM 1:30 PM Lunch
1:30 PM 3:30 PM CT AC CW Exercise (Manpower and Production Capacity)
3:30 PM 3:40 PM Break
3:40 PM 5:00 PM Control Move Examples
5:00 PM 6:00 PM Control Move Video
3 Hours Home Work
Day 3
9:00 AM 11:00 AM Control Move (Lab Exercise)
11:00 AM 11:10 AM Break
11:10 AM 11:40 AM Tool Use Fasten/Loosen Sequence (A B G A B P F/L A B P A)
11:40 AM 12:50 PM Tool Use Multiple Fasteners (P A F/L)x Freq
12:50 PM 1:30 PM Lunch
1:30 PM 3:30 PM Tool Use Exercise and Video
3:30 PM 3:40 PM Break
3:40 PM 5:00 PM C : Cut, S - Surface Treat, M - Measure, R - Record, T - Think
5:00 PM 6:00 PM Examples
3 Hours Home Work
Day 4
9:00 AM 11:00 AM Tool Use (Lab Exercise)
11:00 AM 11:10 AM Break
11:10 AM 11:40 AM MOST Theory (Special Situation and Tools, Balancing Time/Effect)
11:40 AM 12:50 PM Topic Presentation
12:50 PM 1:30 PM Lunch
1:30 PM 3:30 PM Application of MOST Practical Approach and Examples
3:30 PM 3:40 PM Break
3:40 PM 5:00 PM MDAT Software Demonstration
5:00 PM 6:00 PM Queries Solve
Day 5 9:30 AM 12:30 PM Exam [100 Marks- 3 hours] [80+ Passing]
Three M.O.S.T. sequences are needed for describing manual work and a fourth for
measuring the movements of objects with manual cranes.
The General Move Sequence (for the movement of object freely through air)
The Controlled Move Sequence (for the movement of object when it remains in contact
with the surface or is restricted in its movement)
The Tool Use Sequence (for the usage of common hand tools)
General Move ABG ABP A
A – action distance
B – body motion
G – gain control
P – placement
Controlled Move ABG MXI A
M – move controlled
X – process time
I – alignment
Tool Use ABG ABP * ABP A
F/L – fasten/loosen
C – cut
S – surface treat
M – measure
R – record
T – think
MOST Procedure:
1. Watch job/task
2. Determine sequence(s) to use
3. Determine index values
4. Add index values to determine TMU
5. Multiply TMU by 10
6. Convert TMU to seconds, minutes, hours
Example:
General Move:
Move 8 steps, take a bottle of water from ground, move further 4 steps, keep it on the
table and return back.
A16 B6 G1 A6 B0 P1 A24
= 16 + 6 + 1 + 6 + 0 + 1 + 24 = 54 * 10 = 540 TMUs
= 540 * 0.036 = 19.44 Second
Based on Table Values
See table
https://www.researchgate.net/figure/General-move-card-adapted-from-Zandin-2003_tbl1_303863041
https://www.slideshare.net/SohitChauhan1/most-maynard-operation-sequence-technique
https://virtualfactory.gitbook.io/vlft/tools/most/how-to-start
https://virtualfactory.gitbook.io/vlft/tools/most/formalise