--------------------
Signal: Optimized Brain, Health, Anger level, self image, sage state - Noise: emotional chaos, unhealed trauma, shame. Wisdom = signal/noise
Industrial Engineering is System Efficiency Engineering. It is Machine Effort and Human Effort IE. 11.3 Million Page View Blog. 200,000+ visitors. (36,000+ pv, 25,500+ visitors in 2025.)------------------ Blog Provides Industrial Engineering Knowledge: Articles, Books, Case Studies, Course Pages and Materials, Lecture Notes, Project Reviews, Research Papers Study Materials, and Video Lectures.
--------------------
Signal: Optimized Brain, Health, Anger level, self image, sage state - Noise: emotional chaos, unhealed trauma, shame. Wisdom = signal/noise
AgenticAI
Inside Project Prometheus: Jeff Bezos’s $6.2 Billion Bet on the Next Phase of Industrial Automation
Te strategic intent is clear: Project Prometheus is pivoting hard toward “agentic” workflows—AI systems capable of reasoning, planning, and executing complex tasks in engineering and manufacturing without human hand-holding.
A proprietary architecture that allows AI to navigate Computer-Aided Design (CAD) environments and supply chain logistics simultaneously.
Current iterations of AI can suggest a design for a bracket or optimize a single line of code, but they lack the agency to oversee a project. An agentic system, by contrast, can be given a goal—such as “reduce the weight of this turbine blade by 15% while maintaining thermal integrity”—and then proceed to iterate through designs, run simulations, adjust for material constraints, and even interface with suppliers to source the necessary alloys.
If Project Prometheus can successfully deploy agents that automate the drudgery of mechanical engineering—checking tolerances, converting file formats, validating compliance—it unlocks immense value. It moves the bottleneck of innovation from human bandwidth to compute availability. This is not about replacing the engineer, but about giving one engineer the output capacity of a hundred.
The digital transformation of manufacturing is no longer about better CAD software or smarter supply chain dashboards. It is about introducing a synthetic workforce capable of cognitive labor.
Project Prometheus - Data collection from real-world trial and error and its analysis
It intends to apply AI to physical tasks; this requires systems that can learn not just from massive amounts of digital data, as LLMs are programmed to do, but also from real-world trial and error.
https://en.wikipedia.org/wiki/Project_Prometheus_(company)
Industrial AI and Siemens
https://aimagazine.com/news/ceo-to-prove-how-siemens-leads-the-industrial-ai-revolution
Engineering Copilot TIA Standard (Managed Service)
A generative AI-powered assistant for automation engineering connected to TIA Portal.
https://www.siemens.com/en-us/products/tia-portal/engineering-copilot-tia-standard/
Press Release 25 November 2025
Siemens showcases the future of autonomous production at SPS 2025
Engineering Copilot TIA autonomously executes engineering tasks: successful beta, now expanding to additional pilot customers
Siemens to demonstrate how customers can fully automate entire workflows at SPS 2025
Ud. 14.3.2026, 29.11.2025
Pub. 28.11.2025
https://trainingwithinindustry.blogspot.com/
Early Vermont Industrialists and Lean Thoughts
http://trainingwithinindustry.blogspot.com/2009/11/
http://www.trainingwithinindustry.net/blog
Training within Industry – TWI – Oldies but Goldies
January 16, 2018 by Christoph Roser
https://www.allaboutlean.com/training-within-industry/?fsp_sid=4146
TWI has it origins (very loosely) in World War I, when Charles R. Allen developed his four-point method of Preparation, Presentation, Application, and Testing to train shipyard workers. He published it in his book “The Instructor, the Man and the Job; a Hand Book for Instructors of Industrial and Vocational Subjects” (1919).
You can download the book from:
https://archive.org/details/instructormanjob00allerich
Pub. 25.6.2022
TPS is Industrial Engineering System of Toyota Motors.
IE is a system and the Toyota production system may be regarded as Toyota style IE.
Taiichi Ohno on Industrial Engineering - Toyota Style Industrial Engineering
https://nraoiekc.blogspot.com/2013/11/taiichi-ohno-on-industrial-engineering.html
Toyota Production System has a system or process design component and system and process improvement component. The Jidoka pillar of TPS describes these activities. The other pillar JIT deals with quantities of material flowing in the system. JIT is a small batch quantity production system.
Seven flows are important in process design and process improvement.
They are:
The flow of raw material
The flow of work-in-process
The flow of finished goods
The flow of operators
The flow of machines
The flow of information
The flow of engineering
Industrial engineers must first observe each of these flows to gain full understanding. Based on observation, they have to take notes and sketch out the seven flows.
https://www.reliableplant.com/Read/19651/underst-implement-7-flows-of-manufacturing
2026
Post by Sameer Kataria
https://www.linkedin.com/feed/update/urn:li:activity:7437573843746975744/
OCTOBER 21, 2007 BY MARK
The Seventh Flow - The flow of engineering
http://theleanthinker.com/2007/10/21/the-seventh-flow/
Understand and implement the 7 flows of manufacturing.
Published on February 5, 2016
https://www.linkedin.com/pulse/understand-implement-7-flows-manufacturing-graham-chick/
Nakao-san and Shingijutsu-Kaizen
August 4, 2014 by Bob Emiliani
https://bobemiliani.com/nakao-san-and-shingijutsu-kaizen/
A kaizen method like no other!
Shingijutsu-Kaizen: The Art of Discovery and Learning describes how, for more than three decades, Kaizen consultants from Shingijutsu USA Corporation have been helping manufacturing and service organizations improve processes by teaching people the methods and tools of flow production.
https://bobemiliani.com/book/shingijutsu-kaizen/
http://www.shingijutsuusa.com/
Chihiro Nakao - Taiichi Ohno’s best student from outside of Toyota proper.
The Most Dangerous Idea in the World
By Jon Miller • Published: June 22nd, 2015
https://blog.gembaacademy.com/2015/06/22/the-most-dangerous-idea-in-the-world/
Nakao was in charge of development activities in a supplier company.
https://books.google.co.in/books?id=cNs_CQAAQBAJ&pg=PA13#v=onepage&q&f=false
Improving Flow - Lee Candy
Document or Map the process - Process Chart, Value Stream Map
Identify and log all problems the process owners/managers/engineers/operators experience
Identify all waste in the current process
Develop ideas for improvement opportunities
Do engineering of improvement ideas
Develop Process Chart or Map of the Revised Process
Develop an action plan to install the revised process
Actively monitor the new processes put into place to assure improvement expected.
Create performance measures for control in the operations
https://online.kettering.edu/news/2016/07/07/understanding-principle-flow-lean-manufacturing
A Toyota Leader on Misunderstandings About the Toyota Production System
By Mark Graban On Apr 24, 2019
It's a talk given by Nampachi Hayashi at the “Building on Success 2018 Conference.”
Mr. Hayashi says the name “should have been TPS = Toyota Process Development System.”
Built-in quality and improved flow leading to lower cost… as a result. Cost reduction isn't the primary lever that's pulled (as we see attempted in so many Western companies, including hospitals)… it's a result. Simple cost-cutting might not lead to better quality and flow (it's often quite the opposite that happens). But better flow and better quality always leads to lower cost, in my experience. Productivity is also a forward activity. It focuses on fully utilizing the machine and man to do a job with less resources. This it results in lower cost.
Groover is an important contributor to industrial engineering literature and teaching.
Groover's book is the latest book available on the subject of work systems improvement.
It still sticks to the content of motion and time study books.
It defines work system as a combination of men and machines/equipment. But it does not attempt to discuss analysis and improvement of machines and machine usage in processes.
As a physical entity, a work system is a system consisting of humans, information, and equipment designed to perform useful work. (Chapter 1)
Contributes to the production of a product or delivery of a service
Examples:
Worker operating a machine tool in a factory
Robotic welding line in an automobile plant
Material move man driving a delivery truck to make deliveries to various production sections in a plant
Designer working at a CAD workstation
Book - Work Systems and the Methods, Measurement, and Management of Work
by Mikell P. Groover,
Chapter 9. Charting and Diagramming Techniques for Operations Analysis
Sections:
Overview of Charting and Diagramming Techniques
Network Diagrams
Traditional Engineering Charting and Diagramming Techniques
Block Diagrams and Process Maps
Gantt Charts
Objectives of Charts and Diagrams Used in Methods Engineering
To permit work processes to be communicated and comprehended more readily
To use algorithms specifically designed for the particular diagramming technique
To divide a given work process into its elements for analysis purposes
To provide a structure in the search for improvements
To represent a proposed new work process or method
How to Create / Develop the Chart or Diagram?
Analyst has to become intimately familiar with the process and develop a graphic to represent it.
Steps.
Analyst observes and records information about the process
One-on-one interviews with those familiar with the process
A graphic model of the process is developed based on these interviews
Group meetings with personnel familiar with process
The analyst records the discussion of the meeting.
A graphic model of the process is developed based on the group meetings
How to Analyze the Chart or Diagram to Find Improvement Ideas
Algorithmic analysis
Line balancing, critical path methods
Checklists
General questions applied to the particular process to assess whether they can be applied to the problem of interest
Brainstorming
Team activity in which participants contribute recommendations
Separating value-added and non-value-added operations
Value added steps:
Important to customer
Physically change the product or service
Checklist of Questions - Example
Material
What alternative starting material could be used?
Should the part be produced or purchased?
Production Operations
Can this operation be eliminated, combined, or simplified?
Could a different joining method be used?
Inspection Operations
Could the inspection task be automated?
Categories of Charts and Diagrams
Network diagrams
Traditional industrial engineering charts and diagrams
Operation charts
Process charts
Flow diagrams
Activity charts
Block diagrams and process maps
Gantt charts
Network Diagrams Consist of: Two-way flows (movement of materials):
Nodes representing operations, work elements, activities or other entities
Arrows connecting the nodes indicates relationships among the nodes
Direction of work flow between nodes
Precedence among nodes
Used to represent
Work elements in assembly line balancing
Work activities in CPM and PERT
Two-way flows (movement of materials):
Maximum number of arrows = n(n -1)
One-way arrows (precedence):
Maximum number of arrows =
Network Diagram - Precedence Constraints
Restrictions on the order in which work elements can be performed
Precedence diagram
Traditional IE Charts and Diagrams
Operation charts
Process charts
Flow diagrams
Activity charts
Operation Charts
Graphical and symbolic representation of the operations used to produce a product
The time to accomplish the operation is sometimes also included.
Two types of operations:
Processing and assembly operations
Changing the shape, properties or surface of a material or workpart
Joining two or more parts to form an assembly
Inspection operations
Checking the material, workpart, or assembly for quality or quantity
Checklist of Questions Used to Analyze an Operation Chart
The focus of the operation chart is on the materials of a product and the operations on them
Questions related to material
What alternative starting material could be used?
Make or buy decision: should the part be produced in the factory or purchased?
Questions related to operations
Is this processing operation necessary?
Can this operation be eliminated, combined, or simplified?
Could a different joining method be used?
Questions related to inspection
Is this inspection necessary?
Could the inspection task be automated?
Process Charts
Graphical and symbolic representation of the processing activities performed either on something or by somebody.
The chart consists of a vertical list of activities using symbols to represent operations, inspections, moves, delays and storage and other activities.
Principal types of process charts:
Flow process chart – analysis of a material or workpiece being processed
Worker process chart – analysis of a worker performing a task
Form process chart – analysis of the processing of paperwork forms
All these charts are used to examine for possible improvements of operations
Flow Process Chart
Uses five symbols to detail the work performed on a material or workpart as it is processed through a sequence of operations and activities:
Operation – processing of a material
Inspection – check for quality or quantity
Move – transport of material to new location
Delay – material waiting to be processed or moved
Storage – material kept in protected location
Flow Process Charts
If the processing operation combined with an inspection at the same workstation: combine symbols - a circle inside a square
Provides more detail about the steps required to process a material than in the operation chart:
is used to study a single work part rather than the multiple components of an assembly
The chart also indicates distances for move activities and time values for other activities
Checklist of Questions Used to Analyze a Flow Process Chart
Questions Related to Material
Make or buy decisions: Should the part be produced in the factory or purchased from an outside vendor?
Questions Related to Operations and Inspections
Is the operation time too high?
Is the inspection operation necessary?
Questions Related to Moves
How can moves be shortened or eliminated by combining or eliminating operations?
Can the level of mechanization in material handling be increased?
Questions Related to Delays
Is the delay avoidable?
What is the reason for the delay? Can the reason be eliminated?
Questions Related to Storage
Is the storage necessary?
Why can’t the material be move immediately to the next operation?
Worker Process Charts
Used to analyze the activities of a human worker as (s)he performs a task that requires movement around a facility.
Also known as process chart-person analysis
The symbols are the same as flow process chart
Storage activity is omitted since it is difficult to interpret in the context of human work activity
Form Process Charts
Used to analyze the flow of paperwork forms and office procedures
Flow Diagram
Drawing of the facility layout with the addition of lines representing movement of materials or workers within the facility
Arrows on the lines represent direction of movement
Often used in conjunction with a process chart
Operations, inspections, delays, and storages at specific locations are identified by numbers referenced to the activity number
Flow Diagram
The flow diagram reveals problems in the work flow that may not readily be identified using the process chart alone.
For example, if the work flow involves considerable backtracting, this can be identified in the flow diagram, whereas it is indicated only as distances in the process chart.
Thus, it can be used to detect excessive backtracking (which might be missed in a process chart), excessive travel, possible traffic congestion, points where delays typically occur and inefficient layout.
Activity Charts
A listing of the activities of one or more subjects (e.g., workers, machines) plotted against a time scale to indicate graphically how much time is spent on each activity
These activities are generally repetitive.
Types of activity charts:
Right-hand/left-hand activity chart (a.k.a. workplace activity chart)
Worker-machine activity chart
Worker-multimachine activity chart
Gang activity chart (a.k.a. multiworker activity chart)
Shading Formats for Activity Charts
Instead of using symbols for the work activities, as in the other charts, the activities are indicated by vertical lines or bars
When bars are used, they are shaded or colored to indicate the kind of the activity being performed.
Activity Chart
Activity charts usually have more than one time scale e.g., activity time and cumulative time
Activity chart for a worker performing a repetitive task:
Multiple-Activity Charts
Used to track several participants working together
They consists of multiple columns, one for each participant.
Objective: to analyze how the workload is coordinated and shared among the entities.
Right-hand/left-hand activity chart
Worker-machine activity chart
Worker-multimachine activity chart
Gang activity chart (a.k.a. multiworker activity chart)
3Right-Hand/Left-Hand Activity Chart
Shows
contributions of the right and left hands
balance of the workload between the right and left hands
Remember the example with pegs
Task involves placing pegs into a peg board
Note that left hand is used as a workholder
Worker-Machine Activity Chart
Shows how work elements are allocated between a worker and a machine
Help to identify opportunities for cycle time improvements e.g., replacement of external work elements by internal work elements
Worker-Multimachine Activity Chart
Can be used to indicate machine interference (when a machine must wait for service because worker is currently servicing another machine)
Gang Activity Chart
This chart indicates activities in which two or more workers performing together as a team
Also known as multiworker activity chart
Can be used to analyze the operations of different stations in the the same chart
Objective: To better coordinate the activities and balance the workload among the workers
Block Diagrams
Graphic consisting mostly of blocks and arrows to portray the relationships among components of a physical system
Commonly used in linear control theory, where
Arrows represent the flow of signals or variables in the system
Blocks contain transfer functions that define how input signals are mathematically transformed into output signals
Block Diagram
Used to depict flows and interrelationships among components in complex systems
Block diagrams are commonly used in linear control theory, as shown below for a feedback control system
Process Maps
A process is a sequence of tasks that add value to inputs to produce outputs
Basic process map is a block diagram showing the steps in a process
Widely applied to business processes
Also applicable to production, logistics, and service operations
Levels of detail:
High-level process map – macroscopic view of process and includes only the most important steps
Low-level process map – used to map each of the steps in a high-level process map
Symbols in the Basic Process Map
Process map symbols:
beginning/ending point of the process,
task or activity step,
decision point
Symbols are connected by arrows to indicate sequence
Alternative Forms of Process Maps
Relationship process map – block diagram that shows the input-output connections among departments (or other functional components) of an organization
Cross-functional process map – block diagram showing how the steps of a process are accomplished by various departments
Departments listed as rows separated by dashed lines
Also called a swim-lane chart
Relationship Map
Block diagram that shows the input-output connections among departments (or other functional components) of an organization
Cross-Functional Process Map
Block diagram showing how the steps of a process are accomplished by departments
Gantt Charts
A graphical display of schedule project activities on a time axis
Project activities are listed on a vertical axis
Activity time durations are shown as horizontal bars with starting and ending times
Gantt Chart: Planned Activities
Shows planned activities for a construction project
Gantt Chart: Progress
Shows actual work accomplished at some point during week 7
Gantt Chart Showing Precedence
Arrows can be used to indicate precedence relationships among activities