Managing the IE (Industrial Engineering) Mindset - Full paper link/
Managing the IE (Industrial Engineering) Mindset: A quantitative investigation of Toyota’s practical thinking shared among employees
Phillip Marksberry, David Parsley
University of Kentucky (USA)
Marksberry, P., & Parsley, D. (2011). Managing the IE (Industrial Engineering) Mindset: A quantitative investigation of Toyota’s practical thinking shared among employees. Journal of Industrial Engineering and Management, 4(4), 771-799. http://dx.doi.org/10.3926/jiem.293
Journal of Industrial Engineering and Management Vol 4.,No.4, 2011
I read the article today (18.11.2025). I would like to read the parts more carefully. I have to modify and present many issues included in this paper.
pdf
https://www.linkedin.com/advice/0/what-some-ways-develop-strategic-mindset-vbzje
References to be put in chronological Order
Cooke, M. (1910). Academic and Industrial Efficiency. Bulletin of the Carnegie Foundation for the Advancement of Teaching, 5, 6.
Taylor, F. (1911). Principles of Scientific Management. New York and London: Harper & brothers.
Anderson, A. (1928). Industrial Engineering and Factory Management. New York: The Ronald Press Company.
Bowker, A., & Lieberman, G. (1971). Industrial Statistics in Handbook of Industrial Engineering and Management. Ed Ireson & Grant.
Daniel, C. (1973). One at a time plans. Journal of the American statistical association, 68, 353-360. http://dx.doi.org/10.2307/2284076
Anderson, V., & McLean, R. (1974). Design of Experiments: A realistic approach. New York: Dekker.
Biddle, B.J. (1979). Role theory: Expectancies, identities, and behaviors. New York: Academic Press.
Czitrom, V. (1999). One-Factor-at-a-Time Versus Designed Experiments. The American Statistician, May, 53(2).
Bicheno, J. (2000). The Lean Toolbox. Buckingham, England: PICSIE Books.
Cho, F. (2001). The Toyota Way. Toyota Institute, Toyota Motor Corporation (unpublished).
Askin, R., & Goldberg, J. (2002). Design and analysis of lean production systems. New York: John Wiley and Sons, Inc.
Cho, F. (2005). Toyota Business Practice. Toyota Institute, Toyota Motor Corporation (unpublished).
Castro, M., Sebastian, R., & Quesada, J. (2010). A systems theory perspective of electronics in engineering education. IEEE EDUCON Education Engineering, The Future of Global Learning Engineering Education, Madrid, Spain, 14-16 April.
Deerwester, S., Dumais, S.T., Furnas, G.W., Landauer, T.K., & Harshman R.A. (1990). Indexing by latent semantic analysis. Journal of the Society for Information Science, 41(6), 391-407. http://dx.doi.org/10.1002/(SICI)1097-4571(199009)41:6<391::AID-ASI1>3.0.CO;2-9
Dennis, P. (2007). Lean Production Simplified (2nd ed.). CRC Press.
Friedman, M., & Savage, L. (1947). Planning experiments seeking maxima, in Techniques of statistical analyses. New York: Eisenhart, C., Hastay, M., & Wallis, W., McGraw-Hill, 365-372.
Garcia, E. (2006). SVD and LSI Tutorial 4: Latent Semantic Indexing (LSU) How-to Calculations, www.miislita.com.
Gardner, T., & Wright, P. (2009). Implicit human resource management theory: A potential threat to the internal validity of human resource practice measures. The International Journal of Human Resource Management, 20(1), 57-74. http://dx.doi.org/10.1080/09585190802528375
General Accounting Office (GAO) (1995). Business process reengineering assessment guide. Washington, DC: GAO.
Gerhart, B., Wright, P., & McMahan, G. (1999). Measurement error in research on the human resources and firm performance relationship: Further evidence and analysis. Personnel Psychology, 53(4), 855-872. http://dx.doi.org/10.1111/j.1744-6570.2000.tb02420.x
Gilbreth, F. (1973). Primer of scientific management. New York: Easton Hive Publishing Company.
Going, C. (1911). Principles of industrial engineering. London: Hill Publishing Co., Ltd, McGraw-Hill Book Company, Inc.
Gottlieb, B. (1971). The Attitudes of organized labor toward industrial-engineering methods, in Ireson & Grant, 1971.
Grossman, D., & Frieder, O. (2004). Information retrieval: Algorithms and heuristics. Springer Publishing.
Harrington, E. (1911). The twelve principles of efficiency. New York: The Engineering Magazine.
Ireson, W., & Grant, E. (1971). Handbook of industrial engineering and management (2nd Ed.). New Jersey, Englewood Cliffs: Prentice-Hall Inc.
Ishikawa, K. (1985). What is total quality control? The Japanese way. Englewood Cliffs, New Jersey: Prentice-Hall.
Jackson, T. (2006). Hoshin Kanri for the lean enterprise. New York: Productivity Press.
Jugulum, R., & Samuel, P. (2008). Design for Lean six sigma: A holistic approach to design and innovation. New Jersey, Hoboken: John Wiley & Sons, Inc.
Kadota, T. (1982). Charting techniques, in Handbook of industrial engineering. New York: Salvendy, G., John Wiley & Sons, Inc.
Katzell, R., Bienstock, P., & Faerstein, P. (1977). A guide to worker productivity experiments in the United States, 1971-1975. New York: New York University Press.
Landauer, T. (1998). Learning and representing verbal meaning: The latent semantic analysis theory. American Psychology Society, 7(5).
Landauer, T. (2004). From paragraph to graph: Latent semantic analysis for information visualization. Colloquium of the National Academy of Sciences, April 6, 2004, 101(1).
Lee, C. (1996). Process reengineering at GTE: Milestones on Journey Not Yet Completed. Strategy and Business, 5.
Lee, R., & Dale, B. (1998). Business process management: A review and evaluations. Business Process Management Journal, 4(3), 214-225. http://dx.doi.org/10.1108/14637159810224322
Liker, J., & Hoseus, M. (2008). Toyota Culture – The Heart and Soul of the Toyota Way. McGraw-Hill.
Lo, V.H.I., & Sculli, D. (1995). Industrial engineering and TQM. Training for quality, 3(3), 4-7. http://dx.doi.org/10.1108/09684879510093335
Lord R.G., Binning, J.F., Rush M.C., & Thomas J.C. (1978). The effect of performance cues and leader behavior on questionnaire ratings of leadership behavior. Organizational Behavior and Human Performance, 21(1), 27-39. http://dx.doi.org/10.1016/0030-5073(78)90036-3
Ludwig von Bertalanffy, K. (1968). General System Theory: Foundations, Development, Applications. New York: George Braziller.
Manganelli, R., & Klein, M. (1994). The reengineering handbook: A step by step guide to business Transformation. New York: AMACOM.
Mar, B. (1994). Systems engineering basics. Journal of NCOSE, 1(1), 17-28.
Martens, H., & Allen, D. (1969). Introduction to systems theory. Columbus, Ohio: Charles E. Merrill Publishing Co.
Martin, K., & Osterling, M. (2007). The kaizen event planner: Achieving rapid improvement in office, service and technical environments. New York: Productivity Press.
Mika, G. (2006). Kaizen: Event implementation manual (5th Ed.). Dearborn, MI: Society of Manufacturing Engineers.
Mizuno, S. (1988). Management for quality improvement. Cambridge, MA: Productivity Press.
Mogensen, A. (1935). How to set up a program for motion economy. Factory Management and Maintenance Plant Operation Library, 93(11).
Mogensen, A. (1935b). From 59 steps to 22. Factory Management and Maintenance, 93(3), 17-17.
Montgomery, D. (2005). Design and Analysis of Experiments. John Wiley & Sons, Inc.
Ohno, T. (1988). Toyota Production System: Beyond Large-Scale Production. New York: Productivity Press.
Ohno, T. (1988b). Workplace Management. Productivity Press.
Pyzdek, T., & Keller, P. (2009). The Six Sigma Handbook, (3rd Ed.). New York, NY: McGraw-Hill.
Rayfield, J. (1964). Training a standards engineer. Standards Engineering, 14(11), 1-8.
Salvendy, G. (2001). Handbook of Industrial Engineering: Technology and Operations Management. New York: John Wiley and Sons, Inc. http://dx.doi.org/10.1002/9780470172339
Saunders, B. (1982). The Industrial Engineering Profession, in Handbook of Industrial Engineering. New York: John Wiley and Sons, Inc.
Shingo, S. (2005). A study of the Toyota Production System: From an Industrial Engineering Viewpoint. New York: CRC Press, Taylor Francis Group.
Srinivasan, M. (2004). Streamlined: 14 Principles for Building and Managing the Lean Supply Chain. USA: Thomson.
Staley, J., & Delloff, I. (1963). Improving Individual Productivity. US: The American Management Association, Inc.
Tanco, M., Ilzarbe, L., & Alvarez, M. (2009). Barriers faced by engineers when applying design of experiments. The TQM Journal, 21(6), 565-575. http://dx.doi.org/10.1108/17542730910995846
Tapping, D. (2007). The Lean Pocket Book Handbook for Kaizen Events. USA: MCS Media, Inc.
Taylor, J., Dargan, T., & Wang, B. (2001). Process Design and Reengineering, in Handbook of Industrial Engineering (3rd Ed.). New York: John Wiley & Sons. http://dx.doi.org/10.1002/9780470172339.ch62
Tippett, L. (1953). The ratio delay technique. Time and motion study, 2(5), 10-19.
Warfield, J., & Cardenas, A. (1994). A Handbook of Interactive Management (2nd Ed.). Iowa State Press.
Wedgwood, I. (2007). Lean Sigma: A Practitioners Guide. Boston MA: Prentice Hall.
Zandin, K. (2001). Maynard’s Industrial Engineering Handbook (5th Ed.). USA: McGraw-Hill.
Ud. 18.11.2025
Pub. 16.1.2012
No comments:
Post a Comment