Open Access
Multi-Criteria Decision-Making for Machine Selection in Manufacturing and Construction: Recent Trends
by Asmaa M. Hagag , Laila S. Yousef and Tamer F. Abdelmaguid.
Mathematics 2023, 11(3), 631; https://doi.org/10.3390/math11030631
https://www.mdpi.com/2227-7390/11/3/631
MCDM Methods for Selection of Handling Equipment in Logistics: A Brief Review
Alma Jusufbašić
Vol. 1 No. 1 (2023): Spectrum of Engineering and Management Sciences
https://www.sems-journal.org/index.php/sems/article/view/2
To be summarized.
https://www.csemag.com/articles/14-aspects-to-consider-in-equipment-selection/
14 aspects to consider in equipment selection
Mechanical engineers should consider these key aspects when specifying systems for a building owner.
BY SETH PEARCE, PE, SOUTHLAND ENERGY, GARDEN GROVE, CALIF. APRIL 18, 2016
Equipment selection for a mechanical engineer is as much an art of application as a science of technology. Today, refinements to manufacturing, increasingly advanced controls, and changing end-user needs determine both the science of technology and the roster of equipment for selection. ) Over the past 15 years, a strong increase in customer needs such as risk, aesthetics, longevity, maintenance, and efficiency, have added complexity to the determinants that need to be evaluated in equipment selection.
Demystifying the “wants” and “needs”
The typical pattern involves building owners and/or end users simply expressing their “wants,” from robust to redundant to inexpensive. Difficulty can arise when these wants are discussed and prioritized against the needs identified to drive evaluation aspects. Core aspects exist that often are purely technical variables that require evaluation and satisfaction. Regardless, the subjective or intangible wants should not be ignored because of difficulties in quantifying the value. Instead, they should be distilled into needs and evaluated as key aspects in equipment selection.
Owners typically desire brand names and advanced equipment that will integrate into their building system, but they want it to be inexpensive to buy and operate and easy to replace. Brand equity is not so much a need as it is a method of ensuring a reputable warranty, parts availability, proven application, and a wide field of technicians able to service the equipment.
While inexpensive is a want, the first cost or perhaps total cost of ownership is the need. For example, heat pumps are not very expensive to buy and install, but they do require invasive and time-consuming maintenance (versus a fan coil or variable air volume box); and they become loud and clunky over time. So would noise criterion levels or minimal interruption of the benefitted space trump costs? Not absolutely, but relatively to a point. Those needs must be emphasized and prioritized as necessary for evaluation in equipment selection.
Creating the roadmap for equipment evaluation
The best roadmap is the lifecycle cost analysis (LCCA) approach and its sum total of satisfying aspects. A total cost-of-ownership approach that identifies needs and assigns values to be evaluated can balance the limitations of first-cost considerations on total comfort, satisfaction, and long-term costs. To perform this, engineers must be able to specify the best equipment for a design as well as be subject matter experts on constructibility, operations, maintenance, human behavior, economics, and manufacturing. One challenge is identifying aspects for consideration. This diverse knowledge is necessary to create the roadmap for equipment evaluation.
The single greatest pressure on any evaluation is typically cost, and more commonly first cost. The first cost is comprised of the capital costs to design, furnish, and install a specific piece of equipment, and it is affected by project speed. Engineers are the subject matter experts that select based on the criterion to be evaluated, not only first cost.
In many instances, an owner structures and selects engineering firms, architects, and contractors to satisfy first cost. Therefore, there is no better arbitrator than the engineer to educate, evaluate, and recommend the selection of equipment that considers all aspects rather than only first cost. The engineer must have a good grasp of these aspects for equipment selection in the factors of their evaluation.
Factors of evaluation
A multitude of varying factors exist for every project and owner, including but not limited to:
First cost: Budgets are a strong consideration, and engineers must limit the equipment options to meet first-cost requirements. The total cost of installation including time, material, infrastructure, and opportunity costs must be evaluated.
Suitability: Equipment selection must be suitable to the application and building. For example, variable refrigerant flow or chilled beams are technologies that either do or do not work well. An example of unsuitability is chilled water in a data center. It is efficient at moving heat, but the presence of water (even with containment) is a risk that must be evaluated.
Constructability due to schedule, lead time, start-up/commission-ability: Aspects such as equipment procurement or tradesman installation time must be evaluated. For example, a piece of equipment that requires a highway shutdown so it can be transferred to the site will have an impact, as will the job site if the equipment must be moved via crane into place. Also, consider whether a piece of equipment can reside in the factory for an extra week if the construction schedule is unexpectedly impacted. Additionally, once the project is launched and commissioned, can the equipment sit unoccupied and not used for 3 months before occupancy?
Ease and cost of operations and maintenance: Do the evaluated equipment-selection aspects account for how preventive maintenance technicians will access the equipment? How accessible are the filters? Does special attention need to be placed on the design of the strainer locations? If the reversing valve fails in year eight, how dire will the beneficial space be to replace it? Are the economizer/outside-air dampers easy to access for maintenance?
Total cost of ownership: This entails first cost and all other major fixed and variable costs associated with the lifetime of the equipment evaluated at net-present value (NPV) against alternatives for selection. This aspect allows engineers to look at incremental factors, such as the benefit of variable frequency drives (VFDs) on the condenser water pumps or whether 1/10 less kW/ton material affects the NPV versus alternatives.
Experience and reputation of the equipment manufacturer: This aspect examines the potential of sourcing partners for equipment. Engineers, owners, and contractors have preferred partners. These manufacturers have gained favor through positive experiences. An engineer must understand the needs and be wary of marketing or prejudiced specifications.
Impact on other building design elements (size, location, interference): Engineers refer to this as coordination, or developing a method of evaluating the coordination with mechanical, electrical, plumbing (MEP), and other system design and installation. Engineers evaluate the risk of change orders, time delays, and other impacts in equipment selection that must be foreseen. For example, the contractor may have to reroute or core a hole in the floor because elevator hydraulic lines are already in the proposed path for the chilled-water supply and return.
Noise criteria (NC): This is a key aspect to be evaluated. Different scales for different frequencies of noise should be understood and evaluated, especially if equipment starts and stops routinely. Engineers must understand ambient noise, and come in under recommended or specified NC targets.
Lifespan: The average age of commercial or school buildings is slightly more than 40 years. Mechanical systems with proper maintenance can last more than 20 years, and others even longer Evaluating the requisite lifespan is an important aspect of equipment selection. A chiller can easily provide service for 15 years, while cooling tower life varies. A new programmable thermostat may need to be replaced in 8 years due to persistent button pushing. Realistic evaluation is important to achieve the project needs and secure return on investment; it affects total cost of ownership assumptions greatly.
Energy benefits (code requirements, energy efficiency, or value of the property): These types of evaluation variables are abstract and can be difficult to quantify, albeit not to be over-looked. A curious example exists in the Bank of America Tower in New York City, which is a notoriously energy-consumptive building despite having achieved the highest U.S. Green Building Council LEED certification available. Still, the building attracts major environmental-advocating tenets, demonstrating the value of its purported energy benefits.
Scalability, staging, and modularity of equipment: This involves aspects of future planning and optimum use. A cooling unit that runs near full load reaches peak efficiencies and likely achieves good investment economy of scale. However, the same unit that runs at part load does less so. And a unit that short-cycles may not be ideally efficient or cost-effective, but necessary. For projects with phased development and occupancy, perhaps evaluate for what is needed soon and consider scaling. For owner projects with wildly varying load requirements, consider evaluating the equipment needs to satisfy only 85% of those needs. For projects such as data centers with abrupt and rapid expansion needs, consider evaluating what equipment will work over time with the equipment selected now, and vice versa.
Redundancy and failure-node risk: Evaluate areas where weakest-link scenarios arise. There may be value in robust equipment in areas where a failure could lead to difficulties in the facilities. For example, valves, chillers, and pumps associated with a large thermal-energy storage system may require special consideration because the failure of any point therein could result in a facility unable to meet cooling requirements early the next afternoon.
Environmental health attributes : These evaluation criteria should be evaluated with owners, factory reps, and other authorities having jurisdiction (AHJ) requirements. For example, R-123 refrigerant has been a phenomenal performer through a wide range of compressor load levels, but it is unfavorable by some who cite its potential damage to the environment if leaked. Contrary, ammonia refrigerant is specialized and deadly, but favored by a few for its unique properties and relative friendliness to the environment.
Safety: This is an area every engineer must consider in equipment selection. What is safe to construct, operate, and maintain must be evaluated. For example, discussions with owners and contractors over what and where with regard to safety concerns can integrate project delivery and increase health and safety.
Every project is different, and equipment-selection aspects for evaluation must be specifically developed to meet each project’s unique needs and complexity. The main factors for evaluation can vary from a half dozen to hundreds. An engineer working on equipment selection can methodically develop that criterion and evaluate it to provide optimum choices.
Calculation of factors
Once identified from the project needs, key aspects an engineer should evaluate in equipment selection can be summarized in the simple math of weighted scoring, then mapped to money in LCCA, and reinforced for posterity in logic statements. The process assigns reasonable quantities to be evaluated to the variety of aspects. This transforms subjective qualities of a project’s needs to numerical analysis, considered the “art” of the process. An engineer can consider abstract wants and distill those into concrete needs, which are prioritized with weighting and used in a scorecard for equipment selection.
An example can be illustrated in three owner “wants”: a cutting-edge working environment, budget conformity, and reasonable operating costs. This could be described as cool, quiet, unobtrusive, inexpensive, efficient, and low-maintenance; or three wants summarized in six needs. Of those, five are subjective and one is objective because inexpensive typically correlates to a number. Once prioritized, these rank as inexpensive, cool, quiet, efficient, low-maintenance, and unobtrusive. In selection, engineers must find the least expensive equipment that will be cool and quiet enough; but once satisfied, every additional dollar for extra cooling or added quiet is a luxury. However, additional benefits in efficiency and low maintenance, even at the expense of low cost, can be evaluated to find an ideal cost/benefit ratio. After that, degrees of obtrusive can be weighed at the expense of the other needs and a final selection can be made. In the real world, there will be another half dozen purely technical requirements included in the selection, but the point can be seen: methodically eat this elephant, one bite at a time.
The biggest difficulty in evaluating so many characteristics in complex projects is the overwhelming degrees of freedom. Linear algebra offers advanced means to reconcile huge interrelated equations, but equipment selection is best served by a simpler routine. The design engineer should identify as many aspects that should be evaluated as possible, but only evaluate a dozen or fewer factors in equipment selection. Reviewing the big list frequently while limiting the number of parties involved provides good perspective on overall priorities, and many synergetic criteria are actually met by coincidence. Reviewing a significant list of evaluation criteria also enhances creative thinking and ensures selected equipment does not have a fatal failure for critical considerations not reviewed in a purely limited evaluation.
The limited aspects chosen for evaluation in equipment selection can be applied to different design options, or simply different brand names of equipment. Simple weighted scoring can potentially identify ideal equipment, and a LCCA can validate or re-evaluate that potential. Choose a realistic discount rate, relative to the owner’s approximate return on investment or cost of money. Select realistic escalation rates for energy, labor, or equipment. Assign annual occurrences, such as large overhauls or other anticipated repairs or replacements. The net-present or net-future values from a LCCA will ensure the total costs associated with a particular equipment selection have been considered. Comparing alternative LCCAs for different potential equipment pieces is fast and routine, but the output is very telling.
Once a conclusion is reached on a particular equipment selection, document a summary of the evaluation, the peer contenders, and three reasons the selected equipment was chosen. In circumstances where others will be procuring, if options between equipment choices will still be made, it is important to rank two to five of the highest evaluated equipment, with short comments why.
The key aspects that mechanical engineers need to consider in equipment selection are nuanced. It can be as simple or complex as necessary, but regardless, it must be comprehensive. An excellent understanding of owners’ wants is required, in combination with a good network of experience and peers to draw upon, and a methodological system of scoring and evaluation. It requires an engineer to communicate efficiently and reinforce conclusions, and should result in ongoing collaboration with the owner to ensure desired attributes are captured. Both the right and left brain will be activated to achieve both the art and science of evaluating abstract conditions and technical applications. It requires financial sensitivity and analysis. Most of all, a good foundation in engineering is needed, along with common sense and the ability to understand how important these nuanced selections are to achieve many years of comfort, safety, and performance.
Seth Pearce is director of design and development for Southland Energy, a division of Southland Industries. In this role, he helps to develop and implement solutions to conserve energy, waste, and water; integrate generation; and incorporate renewable energy.
-----------------------
https://machinethug.com/factor-affecting-selection-of-construction-equipment/
Factor Affecting Selection of Construction Equipment
BLOG / BY SUNDERVEER RAJPUT
Construction equipment or Heavy Equipment selection is difficult just because of the main only reason costing of the machine. A small amount of investment does not require much attention. While you are doing investment with the bigger amount you need to focus on that investment in need to check all angles of that. The advantages and disadvantages of equipment will clear you what exactly steps you need to take.
We will point out all factors which really matter your decision making in the purchase decision.
Table of Contents
1. Requirement of Equipment
2. Operating Cost of Equipment
3. Owning Cost
4. Suitable for Construction Project
5. Labour Consideration
6. Selection of Machinery
7. Brand and Model
8. Availability of Spare Parts
9. Economic life of Construction Equipment
10. Unit Cost of Production
1. Requirement of Equipment
Really you required that equipment or you can get it done your work without that equipment also because many time company or individual do the investment that not even necessary. It commonly happens that for certain single work you buy that equipment due to the nonavailability of equipment in the market on a rental basis. So be sure that without that machine can you get done your work.
2. Operating Cost of Equipment
Before you make a decision check the operating cost of equipment. Elephant feeding cost is higher than the buying cost. If the Operating cost of the machine higher than the investment please check the ROI.
Operating Cost includes transportation, labour costs, Electricity Cost, Fuel Consumption, Operator cost need to check in excel what is per month, or yearly costing. Do you get the real benefit of what you are looking for?
3. Owning Cost
Owning cost is different than the operating cost. Owning costs consider buying costs. An investment made on the purchase of machinery. Owing cost includes the EMI Costing, Financier yearly fees, purchase price. You need to check both costing operating + owning. Does both these cost allow you to buy machinery?
4. Suitable for Construction Project
Does your investment suitable to project for what you are making an investment. The wrong decision puts you in the problem. As you require the EOT crane but made the decision buy of a tower crane. A wrong decision will make more costing or even not fulfill your requirement. So be sure if don’t have technical knowledge then take the help of consultancy they will help you out to make the right decision.
Don’t take advice from manufacturer sales guys they always guide you in which they have more profit. Try to take help from where you get unbiased help.
5. Labour Consideration
Does your investment impact on labour? If so take decision wisely calculate the investment costing against the labour costing. Check the Union reaction also it might happen that one machine investment lay off all the labour from the company. So the decision should be such that everyone happy and even its favour to the company also.
6. Selection of Machinery
The selection of machinery is another factor needs to check very seriously. The machine should be advanced technology-enabled. Give you more productive results at minimum operating costs. Machinery manufacturer dealers or service persons should near you so that the anytime service need can be fulfilled. Maintenance costs should be lower as compared to other competitive machinery manufacturers. Compare the financial benefits of the manufacturer who give you more benefits in terms of advance and credit.
7. Brand and Model
Select brand and model that is most demanded in the market because if in future if you need to rent it out so you get the good rental income from your heavy equipment. Out of the many models and brands take care of the resale value also of equipment. Is there any policy of buyback from the manufacturer if not then ask to have it before finalizing the equipment. Compare the model of 2 or more brands with the same capacity as Hitachi Ex 210 & Komatsu PC210.
8. Availability of Spare Parts
Do spare parts are easily available for your constriction equipment? If spare parts are not easily available in the market will cost you in the future and it can stop your working project site and impact on your income. The single seal of a cylinder can stop your whole project site work.
9. Economic life of Construction Equipment
The economic life of the machine will give you recover the cost as per the financial as well as the market value. Be clear with economic life until when the machine gives you income and also consider the resale value of the machine.
10. Unit Cost of Production
Be clear with a unit cost of production so you have an idea what charges you should ask when you have a contract per cubic based project. Project-based work give more benefit as compare to rental base. Before you buy any of the equipment ask for sale a person per hour maintenance cost of equipment. Like JCB operating cost per hour is 42 rupees. The same all other equipment has its own unit cost of production.
Whether construction equipment or any other equipment factor affecting selection of construction equipment processes will more or less the same. So clear with all points if doubt on someone please ask in below comment box.
No comments:
Post a Comment