Sunday, March 8, 2026

150+ Years of Taylor's Engineering, Industrial Engineering, Productivity Improvement, Science, Engineering and Management - 1875 - 2026

New

Modern Industrial Engineering - Summary Explanation.

https://www.linkedin.com/pulse/modern-industrial-engineering-summary-explanation-april-kvss-8hiyc



Engineering, Industrial Engineering, Productivity Improvement, Science, Engineering and Management have an interesting 150 years history starting with Taylor taking up engineering education instead of law.

1875 - Taylor started his engineering education with an apprenticeship.

1880 - Founding of American Society of Mechanical Engineers.

1895

TAYLOR, F. W., "A Piece-Rate System, Being a Step Toward Partial Solution of the Labor Problem,"
Transactions of the American Society of Mechanical Engineers 16, 856-903, 1895


Frederick Taylor's Productivity System for Rapidly Attaining The Maximum Productivity - Part 1


The advantages of this system of management (Taylor's Piece Rate System) are :

The manufactures are produced cheaper under it.
The system is rapid  in attaining the maximum productivity of each machine and man




TAYLOR, F. W., "A Piece-Rate System, Being a Step Toward Partial Solution of the Labor Problem,"
Transactions of the American Society of Mechanical Engineers 16, 856-903, 1895

A PIECE-RATE SYSTEM: BEING A STEP TOWARD PARTIAL SOLUTION OF THE LABOR PROBLEM.

BY FRED W. TAYLOR.


The system introduced by the writer (Taylor's system of productivity improvement and piece rate payment),  makes each workman’s interests the same as that of his employer, pays a premium for high efficiency, and soon convinces each man that it is for his permanent advantage to turn out each day the best quality and maximum quantity of work.

The writer has endeavored in the following pages to describe the system of management introduced by him in the works of the Midvale Steel Company, of Philadelphia, which has been employed by them during the past ten years with the most satisfactory results.

The system consists of three principal elements :

( i ) An elementary rate-fixing department. - The productivity improvement department.

( 2 ) The differential rate system of piece-work.

( 3 ) What he believes to be the best method of managing men who work by the day.




Elementary rate-fixing differs from other methods of making piece-work prices in that a careful study is made of the time required to do each of the many elementary operations into which the manufacturing of an establishment may be analyzed or divided. These elementary operations are then classified, recorded, and indexed, and when a piece-work price is wanted for work the job is first divided into its elementary operations, the time required to do each elementary operation is found from the records, and the total time for the job is summed up from these data. While this method seems complicated at the first glance, it is, in fact, far simpler and more effective than the old method of recording the time required to do whole jobs of work, and then, after looking over the records of similar jobs, guessing at the time required for any new piece of work.

The differential rate system of piece-work consists, briefly, in offering two different rates for the same job, a high price per piece in case the work is finished in the shortest possible time and in perfect condition (quality emphasis), and a low price if it takes a longer time to do the job, or if there are any imperfections in the work. (The high rate should be such that the workman can earn more per day than is usually paid in similar establishments.) 

The system by which the writer proposes managing the men who are on day-work consists in paying men and not positions. Each man’s wages, as far as possible, are fixed according to the skill and energy with which he performs his work, and not according to the position which he fills. Every endeavor is made to stimulate each man’s personal ambition. This involves keeping systematic and careful records of the performance of each man, as to his punctuality, attendance, integrity, rapidity, skill, and accuracy, and a readjustment from time to time of the wages paid him, in accordance with this record.

The advantages of this system of management are :

First. That the manufactures are produced cheaper under it (cost of production per unit is reduced), while at the same time the workmen earn higher wages than are usually paid.

Second . Since the rate-fixing is done from accurate knowledge instead of more or less by guess-work, the motive for holding back on work, or “ soldiering ”, and endeavoring to deceive the employers as to the time required to do work, is entirely removed, and with it the greatest cause for hard feelings and war between the management and the men.

Third. Since the basis from which piece-work as well as day rates are fixed is that of exact observation, instead of being founded upon accident or deception, as is too frequently the case under ordinary systems, the men are treated with greater uniformity and justice, and respond by doing more and better work.

Fourth, It is for the common interest of both the management and the men to cooperate in every way, so as to turn out each day the maximum quantity and best quality of work.

Fifth. The system is rapid, while other systems are slow, in attaining the maximum productivity of each machine and man ; and when this maximum is once reached, it is automatically maintained by the differential rate.

Sixth. It automatically selects and attracts the best men for each class of work, and it develops many first-class men who would otherwise remain slow or inaccurate, while at the same time it discourages and sifts out men who are incurably lazy or inferior.

Finally. One of the chief advantages derived from the above effects of the system is, that it promotes a most friendly feeling between the men and their employers, and so renders labor unions and strikes unnecessary.

There has never been a strike under the differential rate system of piece-work, although it has been in operation for the past ten years in the steel business, which has been during this period more subject to strikes and labor troubles than almost any other industry. In describing the above system of management the writer has been obliged to refer to other piece-work methods, and to indicate briefly what he believes to be their shortcomings.

Full paper

 Part 1 -  Part 2   -  Part 3 -  Part 4 - Part 5 - Part 6

1903

Paper - Shop Management  presented in ASME Conference.

Shop Management - Themes


1. Definition of Management 

2. Difference in Production Quantity between a first class man and an average man

3. Developing and Employing First Class People in an Organization

4. Confronting Soldiering - Slow Pace of Work

5. Halsey Plan - F.W. Taylor's Comments

6. Task Management

7. Investment for Increasing Productivity or Efficiency

8. Importance of people - organization

9. Modern Engineering and Modern Shop Management

10. Task Management - Starting and Ending Times

11. Task Work - Some More Thoughts

12. Usefulness of Gantt's system

13. Time Study - Part 1- F.W. Taylor in Shop Management

14. Bicylcle Ball Inspection Case Study

15. Need for Functional Foremanship or Functional Organisation of Foremen

16. Functional Foremanship

17. Production Planning and Control

18. Role of Top Management in Managing Change to High Productive Shop

19. Train Operators in High Productivity One by One and Then in Small Batches

20. Organizing a Small Workshop for High Productivity

21. Introducing Functional Foremanship


1906
Taylor - Productivity Science and Art of Metal Cutting - Important Points

1907 - 1908 - Industrial Engineering course was started by Prof. Diemer in Penn State College.

1910



                                                                         F.W. Taylor
                                                    Publications and Contribution of Taylor

Important Points of Prof. Diemer's Description of Taylor's Industrial Engineering

  • Analyze each engineering process into its ultimate, simple elements, and develop ideal or perfect elements.
  • Make all due allowances for rational and practical conditions and establish an attainable commercial unit time production standard for every step.
  • The next step is attaining continuously the unit time production standard, involving both quality and quantity for each element.
  • Process integration - Assembling the improved prime elements into a well-arranged, well-built, smooth-running engineering process (machine).
  • The industrial  engineer must be able to select mechanical devices, people and perfect the organization that suits present needs and secures prompt returns in profit.
  • Engineering as applied to production means the planning in advance of production so as to secure certain results.
  • The engineer calculates and plans with absolute certainty of the accomplishment of the final results in accordance with his plans, which are based ultimately on fundamental truths of natural science.
  • The mechanical engineer has to do with the design, construction, testing, and operating of machines. The mechanical engineer designs with certainty of correct operation and adequate strength.  Industrial engineering (Production engineering) has to do with the output of men and machines. It requires a knowledge of both. The product involved may be anything that is made by or with the aid of machinery.
  • It is the business of the Industrial engineer (production engineer) to know every single item that constitutes his finished product, and every step involved in the handling of every piece. He must know what is the most advantageous manufacturing quantity of every single item so as to secure uniformity of flow as well as economy of manufacture. He must know how long each step ought to take under the best attainable working conditions.


Process/operation element analysis was described in detail by H.B. Maynard.


TAYLOR'S INDUSTRIAL ENGINEERING - PROF. DIEMER


The first president of ASME in 1880 pointed out that engineers have to make efforts to reduce cost or products.  Mr. Henry R. Towne laid the foundation for cost reduction by engineers  (industrial engineering) through his paper "The Engineer as an Economist." Towne also described his conception of industrial engineering in a 1905 convocation address to Purdue Engineering Students. Prof. Diemer specially describes the concept of industrial engineering according to F.W. Taylor.

Mr. Taylor is the earliest and foremost advocate of engineering management and industrial engineering. Taylor's contribution to production management is well known though his works shop management and scientific management. His contribution to industrial engineering is not that direct through specific works. But he is credited as the father of industrial engineering as his ideas and works became industrial engineering in practice and theory. As early as 1889, Mr. Taylor earnestly pleaded that shop statistics and cost data should be more than mere records, and that they in themselves constituted but a small portion of the field of investigation to be covered by the industrial engineer. While he did not so express himself, the gist of his treatment of factory management is this:

He considers a manufacturing establishment just as one would an intricate machine. He analyzes each process into its ultimate, simple elements, and compares each of these simplest steps or processes with an ideal or perfect condition. He then makes all due allowances for rational and practical conditions and establishes an attainable commercial standard for every step. The next process is that of attaining continuously this standard, involving both quality and quantity, and the interlocking or assembling of all of these prime elements into a well-arranged, well-built, smooth-running machine. It is quite evident that work of this character involves technical knowledge and ability in science and pure engineering, which do not enter into the field of the accountant. Yet the industrial  engineer must have the accountant's keen perception of money values. His work will not be good engineering unless he uses good business judgment. He must be able to select those mechanical devices and perfect such organization as will best suit present needs and secure prompt returns in profit. He must have sufficiently good business sense to appreciate the ratio between investment and income. 

The industrial engineer to-day must be as competent to give good business advice to his corporation as is the skilled corporation attorney. Upon his sound judgment and good advice depend very frequently the making or losing of large fortunes. Mr. James Newton Gunn is responsible for the use of the term " production engineer" or "industrial engineer" in speaking of the engineer who has to do with plant efficiency.

The word "production" indicates the making or manufacturing of commodities. Engineering as applied to production means the planning in advance of production so as to secure certain results. A man may be a good mechanic but no engineer. The distinction between the mechanic and the engineer is that the mechanic cuts and tries, and works by formulae based on empiricism. The engineer calculates and plans with absolute certainty of the accomplishment of the final results in accordance with his plans, which are based ultimately on fundamental truths of natural science.

The mechanical engineer has to do with the design, construction, testing, and operating of machines. The mechanical engineer designs with certainty of correct operation and adequate strength. Production engineering has to do with the output of men and machines. It requires a knowledge of both. The product involved may be anything that is made by or with the aid of machinery.

It is the business of the production engineer to know every single item that constitutes his finished product, and every step involved in the handling of every piece. He must know what is the most advantageous manufacturing quantity of every single item so as to secure uniformity of flow as well as economy of manufacture. He must know how long each step ought to take under the best attainable working conditions. He must be able to tell at any time the exact condition as regards quantity and state of finishedness of every part involved in his manufacturing process.

The engineer must be able not only to design, but to execute. A draftsman may be able to design, but unless he is able to execute his designs to successful operation he cannot be classed as an engineer. The production engineer must be able to execute his work as he has planned it. This requires two qualifications in addition to technical engineering ability: He must know men, and he must have creative ability in applying good statistical, accounting, and "system" methods to any particular production work he may undertake.

With regard to men, he must know how to stimulate ambition, how to exercise discipline with firmness, and at the same time with sufficient kindness to insure the good-will and cooperation of all. The more thoroughly he is versed in questions of economics and sociology, the better prepared will he be to meet the problems that will daily confront him. As economic production depends not only on equipment and plant, but on the psychological effect of wage systems, he must be able to discriminate in regard to which wage system is best applicable to certain classes of product.

Hugo Diemer defined or explained Industrial Engineering in chapter I in his book published in 1910.

FACTORY ORGANIZATION AND ADMINISTRATION BY HUGO DIEMER, M.E.

Professor of Industrial Engineering, Pennsylvania State College; Consulting Industrial Engineer
FIRST EDITION
McGRAW-HILL BOOK COMPANY,  NEW YORK
1910



https://archive.org/details/factoryorganiza00diemgoog

Above link was accessed by me on 8.10.2022. The book available is 3rd edition published in 1921. See page 11. Point 15. It was mentioned that in the first edition of the book, the writer outlined the methods of industrial engineer. It was briefly given again this edition.


The first edition of the book is available at

Hugo Diemer started industrial engineering with first teaching a subject, then starting a 2-year program and then a 4-year program.

1911
F.W. Taylor Scientific Management - With Appropriate Sections

1912
Testimony of Taylor before Special Investigation Committee

1915

INDUSTRIAL ORGANIZATION AND MANAGEMENT

HUGO DIMER
1915
https://archive.org/stream/industrialorgan00diemgoog/industrialorgan00diemgoog_djvu.txt


Qualifications of Time-Study Observer

(pp. 203 to 207)

It is desirable, although not absolutely essential, that the observer be trained in the trade under observation.  College training in laboratory practice in which a man has become accustomed to taking accurate readings is good preparation for this work, provided it has been followed by some shop
training in the trade involved.

The workman on whom the time study is made should always be informed of its purpose, and his interest and co-operation secured. Time study for the purpose of getting the motion and time elements should always be made on first-class men, and such percentage of extra time added in establishing a time limit as will afford an incentive for the average man.

It is customary to pay an advance over a man's ordinary rate when he is acting as a subject for time
and motion studies. This extra pay is in no sense in the nature of a bribe, but it is in recognition of the fact that the man is being called upon to assist in a higher grade f work, since he and the time-study man are now doing team work of a research nature, which is a higher grade of work than ordinary production. The workman may be called upon by the time-study man to stop suddenly in the midst of a process, and to think about certain motion elements involved, and discuss whether these elements are ordinary practice, or whether a certain improvement, short cut, or device suggested by the time-study man is feasible or not, and many similar matters.

Preparation of the Instruction Card

An instruction card is the synthetic or constructive result of the analytic or observational operation known as the time study. It will be noticed that in the instruction card each element or sub-operation is distinctly listed and the standard time which has been agreed on is listed after each sub-operation.

After the time-study work has progressed to such an extent that a considerable variety of standard elemental operations and times have been listed and filed, the building-up of the instruction card for a new piece will consist very largely in assembling these standard elements, leaving only a few elements remaining, for which the time can frequently be figured from known data, so that the actual time-study work becomes less all the time, and the result of every additional time study becomes more and more extensive.

Doing the Work According to Instructions

Where the men have never worked under instruction cards, it will require patient and systematic training and an insistence on careful reading and following of the individual steps of the elemental operation instructions. At the beginning men who have been accustomed to looking at the time consumed on a job merely in the light of the total time are apt to consider impossible the time reductions indicated on most instruction cards.

The writer had experience of this sort in the assembling of automobiles and of engine-governors. After considerable preliminary work in planning and getting materials and tools ready, accompanied by careful time studies, it was decided to offer a bonus in the case of automobile-assembling, beginning at 100 total hours of assemblers' time. The best previous record had been 225 hours. With careful handling of the men the time was reduced at the first to 90 hours and ultimately it was a common occurrence for the total assembling time to take no longer than 65 or 70 hours. In the case of steam-engine governors a great deal of time had been lost by reason of poor fits and the necessity of having the assemblers do a great deal of filing. After the adoption of standard limits on the parts which were to be fitted together, the total time of assembling governors was reduced to about one-third of the former time.

A skilled demonstrator or leader needs to remain with the workers until they are able to do the tasks specified in the instruction cards, and within the time limits designated. When a job has reached the stage where it is continuously done in the time specified, it can be safely left alone. Frequently, however, after considerable savings have been made on work done by an experienced man or group of men, when a new man or group of men undertakes the same task, it takes a much longer time. Under these circumstances it is quite likely that the services of the demonstrator or leader will be again required.

2017
Principles of Industrial Engineering - Taylor - Narayana Rao

2020
THE NEW INDUSTRIAL ENGINEERING (2020): CREATING ENTERPRISE EXCELLENCE
An Article in  Maynard's Industrial and Systems Engineering Handbook, 6th Edition - Edited by Prof. Bopaya M. Bidanda


Publication - Job Shop Lean: An Industrial Engineering Approach to Implementing Lean in High-Mix Low-Volume Production Systems  By Shahrukh A. Irani.

2021
#IISEAnnual2021 - Captains of Industry Forum with Apple CEO Tim Cook - Interview
https://www.youtube.com/watch?v=W6kcA8weV90

Important point made. - Industrial engineers are not happy with status quo. They are constantly in search of improvement and innovation


------------------------------------------------------------------------





-------------------------------------------------------------------------

Industrial Engineering 4.0 - Computer Aided Industrial Engineering: Work Systems Analysis in Industry 4.0

Rao, Kambhampati Venkata Satya Surya Narayana; Rathod, Aniket.  IIE Annual Conference. Proceedings; Norcross (2021): 49-54.
#IndustrialEngineering #Productivity #CostReduction


Coca-Cola - A case study of total productivity management.

Rao, K V S S Narayana.  Industrial Management; Mar/Apr 2021
#IndustrialEngineering #Productivity #CostReduction



2023
Publication:
Maynard's Industrial and Systems Engineering Handbook, 6th Edition - Edited by Prof. Bopaya M. Bidanda

2024

Deepseek
DeepSeek’s  #Optimization Strategy: Redefining AI Cost and Efficiency.
By focusing on cost reduction, open-source collaboration, and efficient model architectures, 
DeepSeek redefined what’s possible in AI. 
Now in  AI, the future belongs to those who can do more with less. #IndustrialEngineering in demand.
Product and Process Industrial Engineering of Generative AI - LLM Models - Deepseek Story.




2025

2025 India National Productivity Week - 12 - 18 February Theme - From Ideas to Impact: Protecting Intellectual Property for Competitive Startups.

The theme for Productivity Week 2025 provides a crucial platform to address the interconnected challenges and opportunities related to innovation, intellectual property (IP), and productivity within the Indian startup ecosystem.

For industrial engineers innovation and productivity are important themes to focus on. 

IEs have to organize events, participate in the event actively and promote industrial engineering as the department, function and discipline to promote productivity through innovation.

I am collecting background material to support industrial engineers in preparing for the events of the week.

Background Material - 2025 India National Productivity Week - February 12- 18, Theme - From Ideas to Impact: Protecting Intellectual Property for Competitive Startups.




How Industrial Engineering is Changing the World in 2025?

AIIEM
Mission
Our mission is to empower industrial engineers and managers across the Middle East and North Africa by enhancing their skills and knowledge, enabling them to meet evolving market demands. We are committed to fostering education, promoting professional development, and conducting essential market research to create sustainable solutions in the educational sector.




Neglected Industrial Engineering of F.W. Taylor.

Machine Effort Industrial Engineering.
Quality Shop floor Foreman
Speed Shop floor Foreman
Time reduction through process improvement focus of Time Study
Employee Involvement and Personnel Relations by Managers and Process Improvement Specialists
Knowledge Management
Industrial Engineering Research and Productivity Science Development
Productivity Engineering - Engineering improvement of products, processes and facilities is the main task of industrial engineers.

Celebrate the birthday of F.W. Taylor in your Industrial Engineering Department and Company. Share what you are implementing in your company from Taylor's Ideas.

Birthday of F.W. Taylor 20th March. Modern Industrial Engineering March  2026 Issue - Taylor Month of IE - Contribution of F.W. Taylor to Industrial Engineering and Productivity Management - Implemented and Neglected Aspects

Access Essays on F.W. Taylor's Writing - Belt Drive Design, Productivity System and Section, Shop Management, Productivity Science of Machining, and Scientific Management

Sharing IE Department Newsletters in your organization can attract the attention and engage more employees in total industrial engineering. - Narayana Rao.


Ud. 8.3.2026, 12.4.2025
Pub. 4.2.2025














Friday, March 6, 2026

The Toyota Production System - Features, Principles and Mechanics - Shigeo Shingo - Industrial Engineering

 


The success of Toyota in cost reduction, productivity improvement, and international competitiveness and its celebrated Toyota Production System, fulfilled the dream of Yoichi Ueno (that Japan can guide US in improved practices of efficiency improvement). The success of #Toyota and the World Class #TPS was  built on the sustained efforts many Japanese persons who understood Taylor and Gilbreth's writings and improvised them in implementing them in Japanese companies.

Shigeo Shingo said 80% of the TPS is waste elimination that is industrial engineering, 15% production management and 5% kanban communications. In other words, we can say,  "Toyota production system (TPS) is 80% process improvement (Jidoka) and 20% production planning improvement (JIT)." 

Based on the above statement of Shigeo Shingo and the description of Jidoka and JIT provided in many books, I interpret Jidoka as process improvement. JIT is production quantity planning and information sharing.

Toyota production system was developed by managers of Toyota with major contribution from Taiichi Ohno by implementing waste elimination methods advocated by industrial engineering. Taiichi Ohno specially applauds industrial engineering as profit making engineering for Toyota. 

Shingo builds up on the Ohno's explanation of TPS by clearly bringing out the role of industrial engineering in the development of TPS in his book. The following content is from Shingo's Book: 

A Study of the Toyota Production System from Industrial Engineering Point of View


Industrial engineering point of view is IE Strategic View, Facilities Industrial Engineering, Process Industrial Engineering, Operations Industrial Engineering and Engineering Element Industrial Engineering.

Chapter 4  Conclusions of Developing Non-Stock Production 


The principal feature of the TPS is eliminating the total cost associated with inventory - the total of inventory carrying cost, setup or order cost and shortage cost. Hence, TPS is described as stockless or non-stock system.

Stock occur due to two reasons:

Naturally Occurrence:

Stock accumulates because of
* Incorrect market demand forecasts
* Overproduction just to be on the safe side due to likely defects
* Lot production (Batch production)
* Due technological and capacity constraints in certain processes. Heat treatment in three shifts but doing further operations in one shift.

Stock that get accumulated due to inefficiencies in the production system
* Production cycle being longer than order-to-delivery cycle.
* Stock produced in advance to take care of extra demand in the future
*Stock produced to compensate for delays in inspection and transport
* Stock produced to compensate for machine breakdowns
*Stock maintained as buffer between machines to take care of defectives
*Stock generated as per calculation of economic batch quantity to take care of high setup or order cost.

Stock reduction was carried out rationally in Toyota production system.

Three strategies can be pursued to approach the idea of non-stock production.

* Reduce the production cycle
* Eliminate the breakdowns - do preventive maintenance to make the machine available all the time for production (Total productive maintenance)
*Eliminate defect - zero defects through process improvement - detect the reasons for defects and remove
them from the process. 
* Reduce setup times and reduce batch quantity to single piece.
Stock

Chapter 5 The Principles of the Toyota Production System


The Toyota Production System is 80 percent waste elimination (Industrial Engineering), 15 percent production system and only 5 percent kanban communication.

Some Commonly Used Terms in TPS

Waste of Overproduction

There are two types of overproduction:
* Making more than required quantity for a delivery period.
* Making a product before it is needed.

Many systems are happy to produce an item before its delivery date and feel comfortable. But Toyota system does not want both types of overproduction.

Just-in-time

JIT also means just-on-time. An item should be made available when it is required not before or after the required time.

Separation of Worker from the Machine

The whole productivity movement of Toyota was based on the fact that per worker production of cars in America was 10 times that of Toyota company. Toyota wanted to improve their productivity and therefore concentrated on reducing the time spent by a worker on the machine. Machines must work without the assistance of the worker as much as possible. Jidoka or autonomation is the name given to this activity. Along with JIT or stockless production, separation of worker from the machine forms the two pillars of Toyota Production System.

Low Utilization Rates

Toyota's machine-output ratio is two to three times  that of similar companies. This could be due to flow production systems or due to planned extra machine capacity to take care of extra demand. But one must always remember that Toyota's main goal is cost reduction and every decision in Toyota is subjected to engineering economic evaluation.

Multi-machine Handling

In 1955, 700 workers were handling 3500 machines. Hence sometimes machines are idle because worker is busy with other machines and cannot load the machines. Toyota permits machine idle times but it does not permit man idle time. The reason is that a machine costs $500 per month but a man costs twice or thrice more.

Equipment Planning and Low Operating Rates

As low operating rate is expected, Toyota buys less expensive machines. But it improves the machines to suit its requirements continuously.  Because in normal times machines have excess capacity or low operating rates,  peak demand can be handled by hiring temporary workers.

Perform Operation and Remove the Defective Part

Whenever a problem appears, Toyota insists on proper diagnosis of the root cause and demands that an operation is done to remove the replace the defective part of the process. It is not content  with the temporary cure of rework on the defective workpiece.

Fundamentals of Toyota Production System


Adopting a Non-Cost Principle

Elimination of Waste

Eliminating waste through fundamental process improvements
               Processing purpose evaluation and rationalization
               Inspection purpose evaluation and rationalization
               Transport purpose evaluation and rationalization
               Delay reason evaluation and rationalization
               Storage purpose evaluation and rationalization

Eliminating waste through fundamental operation improvement
               Setup improvement
               Auxiliary improvement
               Job allowance improvement
               Workshop allowance improvement
               Improving processing and essential operations

Ask the "five W's and one H" and "Why?" Five Times

              What -  What is being produced  - Is it required - Value engineering
               Who - Men, machines, tools and jigs used for the production
               When - Time  - Production planning also comes here.
                Where - Space (Layout)
              Why - rational for the use of everything used in production. Because it provides opportunities for improvement.
              How - The methods - motion used by man, speed and feeds used by machines

At Toyota specially, 5 Whys are used to identify root causes for defects and appearance of problems.

Mass Production and Large Lot Production are not same

Mass production is beneficial. Large lot production has extra cost. It can be reduced with SMED.

Order-based Production

Characteristics of Order-based Production

To take care of fluctuations in the orders, Toyota sets basic productions capacity at minimum demand level and handles increases through overtime and the use of excess machine capacity and temporary workers.

Overtime: There are four hour breaks between the two shifts and overtime can be given in either shift as needed.

Excess capacity: During the minimum load, many workers manage ten machines but up to 50% capacity only. As demand increases, temporary workers are hired and machines can work at 100% capacity. But machine work has to be simplified and standardized so that temporary workers can be trained in three days and they operate the machines.

Strong Market Research

Toyota does spend on market research to know market requirements. Twice in a year 60,000 people are surveyed. Five or six additional surveys are done in a year.

Production Planning

Long term planning is done.
Annual planning is done.
Monthly planning is done.
Daily planning is done. Daily planning based on actual orders. The actual orders are informed to the first stage of assembly section and they draw the components as required from component supply stages.

Toyota's Supermarket System

In the supermarket system of Toyota, stocking is triggered by actual demand for the components for a daily requirement.

Differences between Ford and Toyota Systems

Large lot versus small lot production

Mixed model assembly in Toyota system

More consistent one piece flow in Toyota system

Chapter 6  Mechanics of the Toyota Production System

Improving the Process - Schedule control and Just-in-Time


Toyota makes efforts and reduces production cycle.

Seven Principles for Shortening the Production Cycle

Reduce process delays
Reduce lot delays
Reducing production time
Employ layout, line forming, and the full work control system
Synchronize operations and absorb deviations
Establishing tact time
Ensure product flow between processes

Adopting SMED


Elimination of Defects

Inspection to prevent defects must be practiced.

100% inspection must be adopted.

Poka-Yoke has to be used as a means for zero defects.

Eliminating Machine Breakdowns
It is also process improvement in TPS. Workers are asked to stop  a machine if there is some trouble. Supervisors are given training and are urged to try to keep machines running. When a trouble appears, a visual indication is given and all try to take care of the problem. Preventing recurrence is the motto of TPS.

Chapter 7 Mechanics of the TPS

Improving Process - Leveling and the Nagara System




What is Leveling?

Leveling is a method of balancing load and capacity in a way different from the traditional way.
For example if load on car assembly plant is 300,000 sets of model A, 600,000 sets of model B and 900,000 units of model C and capacity is 1,800,000 units, the traditional solution is  to make 300,000 sets of model A and 300,000 sets of model B in the first 10 days, 300,000 sets of model B and 300,000 sets of model c and in the next 10 days, and 600,000 units of model C in the last 10 days. The load is balanced at the month level, but it gives rise to inventories of various models and even shortages of some models.

 But Toyota followed a different way because it has as its aim prevention and reduction of over production. In the first 10 days, production of 100,000 units of model A, 200,000 units of model B and 300,000 units of model C are produced. We can see now that inventory will come down. It the 10 day planning/production period can be further reduced, all models are produced in much smaller periods the over production can further be reduced. Toyota uses this approaches and reduces the planning period in which all models are made further and further. This is called "mixed production" and on assembly line it is called "mixed model assembly."


Segmented Production

Making production plans for half a month(H), ten days (T), week (W) and Day (D) are segmented production plans.

Mixed Production and Tact Time

Toyota combines product A with 30 Seconds and product B with 25 seconds and specifies 55 seconds as tact time for A+B.


Nagara System

The nagara system facilitates one piece flow by laying out machines in the sequence of operations by transcending the earlier shop divisions and training and facilitating operators to operate multiple unrelated machines in sequence.

Smooth production flow, ideally one piece at a time, characterized by synchronization (balancing) of production processes and maximum use of available time; includes overlapping of operations where practical. A nagara production system is one in which seemingly unrelated tasks can be produced simultaneously by the same operator.

Nagara is multi-machine handling in a process or flow system. The operator works with two or more different machines.

The example given in the body refers to a spot welding operation, followed by a press operation and then a welding operation that attached the pressed part to a body.

Chapter 8 Mechanics of the TPS

Improving Operations


Operations concern the flow of equipment and operators in time and space. Improvements in operations have long been emphasized in the Toyota Production system.

Components of Operations

1. Preparation and after-adjustment
2. Principal operations
3. Marginal allowances

Preparation and After-Adjustment

Reduce them through SMED

Margin Allowances

Personal allowances - For fatigue and personal needs
Non-personal allowances -
Operational allowances: Oiling, clearing away chips etc.
Workplace related: parts arriving late and machine breakdowns

Standard Operation and Standard Operation Sheets

Standard operation implies optimization of work conditions by analyzing

What is produced
Who - persons, machines, tools,and jigs
How - Method - machine speeds and feeds, man's movements
Where - Layout of the equipment and man - Work Station Design
When - Standard time, and Schedule

Present
There has to be a standard operation sheet by the side of the machine using which new workers are trained.

Future:
The Toyota system demands that all work is done within standard time and supervisor is charged with the responsibility. He has to train the worker. Also supervisor is responsible for improvements.

Types of Standard Operating Charts

Capacity charts by part
Standard task combination
Task manual
Task instruction manual
Standard operating sheet

The topic of standard operations is discussed in more detail in
Standard Operation and Standard Operation Sheets in Toyota Production System

Improving Methods of Operation

The operation, which is a man-machine combination can be improved through:

1. Improvements in human motions
2. Improvement in machine movements - increasing machine cutting speeds, reducing time through simultaneous cutting on multiaxis machines, and using multiple turret heads to shorten tool replacements.
3. Mechanizing human motions.

Improving human motions

Motion study can be used to reduce the operation time or the operator time. Motion study improves the movements or motions made by the operator and also improves the arrangement of materials and tools. 5S movement of Japanese industry is basically the offshoot of principles of motion economy.

Items must be arranged neatly, they must be easily accessible and they must be uniformly aligned.

Improvements in Machine Movements

Examples include raising output by increasing machine cutting speeds, reducing time through simultaneous cutting on multi-axis machines, and using multiple turret heads to shorten tool replacement time. This could involve using faster cutting processes like milling in the place of slower process like shaping.

Mechanizing Human Motions

In Toyota, first the human motions are optimized and then mechanization is attempted. Whenever mechanization is thought of its economics are thoroughly investigated. Toyota insists on kaizen - good change.


Machine Layout and Worker Efficiency


Workers are stationed with in a U layout so that they can easily help one another in case of need. Toyota encourages workers to assist each other in case of need or necessity. It discourages island mentality.  The system requires each worker to learn the operations performed at the two processes adjacent to his or her own and help the others when needed.

Multiple Machine Handling Operations


In 1955 itself, Toyota operated 3,500 machines with only 700 workers.  So one worker operates five machines on an average. In recent years (1981), Toyota managers started advocating multi-process handling. In multiple machine handling, the worker may handling the same type of machines. But in multi-process handling, the worker will handling multiple machines in accordance with the flow of operations or process. The capability of multi-process handling by a worker improves the flow of the process and also improves productivity.

Shingo's Summary of the Toyota Production System - The Last Section of Chapter 8


Basic Features of the TPS


# Cost Reduction through Industrial Engineering methods (elimination of waste)
# Emphasis on non stock production - elimination of overproduction
# Emphasis on labor cost reduction through elimination of waste motions and use of minimal permanent manpower.
# Use of SMED to have low set up times and realize small lot production. Ideal: One piece flow.
# Use order based production
# Follow the rule quantity produced must be quantity ordered.

Process Features of TPS


# Active use of value engineering to optimize the design itself.
# Make effective use of division of labor in design of process
# Using Nagara system
# Inspection - depend on self inspection, successive inspection and poka-yoke
# Transportation - Use flow lay out through out the production system.
# Delay - All operations must have equal times as far as possible. Avoid process delay.
             - Lots must be small - Avoid lot delay

Operation Features of TPS

# Use of SMED and its advanced and automated form one touch setups
# Use autonomatic machines as much as possible rationally (based on engineering economic analysis)
# Use nagara system (machines laid out in flow and operators handling multiple machines in the flow line.
# Autonomate material loading and unloading
# Encourage cooperative  work and eliminate isolated person mentality. Operators have to help the upstream or downstream colleagues as needed and as possible.
# Actively pursue minimum manpower deployment in the production system.

Toyota production system brought two revolutionary changes in the production system thinking and practice.

First one is the thinking that market should pay cost plus profit. Toyota changed it to market expansion through cost reduction and price reduction achieved through identifying and eliminating waste from the product  and production system design and operation.

Second,  the traditional thinking was mass production in large lot based on forecasted demand and keeping inventories. Toyota changed it to small lot production based on no inventory and actual orders.

Based on the above two changes, Shingo concludes that Toyota Production System represents a revolution in production philosophy.


Chapter 9 The Evolution of the Kanban System



Kanban and Railway Tablet System


Ohno discussed the introduction of Kanban system with Shingo. Shingo remembered the tablet system in railways which is exchanged between the driver of the train and the station master. Until the tablet is put into a track switches, the station master cannot allow another train to get into the track segment. Similarly the station master removes the tablet from the next segment of the track and gives it to the driver. The driver cannot move from the station unless he was given the tablet. May be there is a system that will allow the tablet to be removed only when the earlier train completed its journey in the track segment. Shingo felt Kanban system was similar to it.

Then Shingo brings into discussion the order point formula.

Order point is equal to consumption during lead time plus the safety stock.
The batch quantity has to be more than the order point. Reduction in set up time allows the reduction in batch quantity and any reduction in production lead time results in reduction of order point. Thus each improvement in set up time can reduce batch quantity and resulting lead time reduction can reduce order point. Similarly, by attacking root causes that create the need for safety stocks like appearance of defects, machine breakdowns, worker absenteeism, material shortages can reduce safety stocks. Thus measures can be taken to reduce inventories in the system.

Supermarkets and the Kanban System

1. Consumers choose goods of their choice and take the items to the cash counter.
2. The store personnel restock, what has been removed by customers.

Using Kanban for communication is similar to the super market system.

Kanban meaning "Sign" in Japanese language has the three functions.

1. Identification tag - indicates what the product is.
2. Job instruction tag - indicates what is to be made, quantity and time
3. Transfer instruction tag - indicates where the item is to be delivered.

Kanban is also treated as a signal to make a pallet load of parts. Hence the number of kanbans or pallet loads permitted as work in process inventory is an important number.

Number of kanbans or pallet loads permitted as WIP (N) =
[Maximum stock permitted = Batch quantity + safety stock]/Capacity of one pallet (n)

In Toyota system, there are efforts to reduce WIP continuously to zero.

To make the lot size one and WIP zero various steps like implementing SMED, Minimum transport layouts, zero defect and zero breakdown programs etc. are necessary.

Regulatory Function of Kanban

Giving production instructions at the final assembly line allows the kanban system to make transmit the information on new car models (model required by the customers) automatically and easily to upstream processes.






Chapter 10. Some Peripheral But Important Issues


Elimination of the Seven Kinds of Waste


1. Processing


Value analysis and engineering needs to be made. Also purpose analysis needs to be done.

2. The waste of making defective products


Poka-yoke needs to be used to prevent defects. Self inspection and successive inspection are to be promoted.

3. Transport


Improve the layout and reduce the need for transport.

4. Delay


Use small lot sizes and minimize delay for the jobs. Allot multiple machines to workers such that there is no waiting time for them. If needed machines can be idle.

5. Inventory


Use SMED and one piece flow and reduce production cycles.

 

6. Wasted Motions


Do motion studies

7. Overproduction

Reduce production for inventory rationally. Use SMED and decrease lot sizes. Improve informative inspection and avoid defects. Maintain machines such that there are no breakdowns and machines are available production all the time. Produce just-in-time for stockless production.

Kanban Rules

1. A process withdraws parts from the preceding process as per Kanban instructions and removes the Kanban from the pallet and leave the kanban there.

2. The earlier process makes parts in the quantities and order specified in the kanban that they pick up from the storage bin.

3. Nothing is transported and nothing is made without kanban.

4. Kanban always accompanies the parts themselves (identification tag must always be present.

5. Every part placed on a pallet must be of acceptable quality.

6. Efforts are to be made to reduce WIP by reducing kanbans over time.

Extending the System to Parts Suppliers

Toyota did not order suppliers to supply on JIT basis. It implemented JIT in its plants over a period of 20 years and then helped suppliers to implement it over a period of 10 years. Suppliers did not suffer because of the change but benefited through increased profits.

TPS and MRP

Shingo said MRP is not committed to the fundamental improvements like SMED, Zero defects and Zero breakdowns like TPS.

Shingo gave the opinion that companies may use MRP after doing fundamental improvement to the system as done by Toyota.

Chapter 11 - The Future Course of the Toyota Production System


Shingo says people say Just on Time is better tern than Just in Time. But the JIT has become a popular term.

Shingo mentions some steps that companies can take to get orders early and thus increase order to delivery period.

* Solicit advance orders from previous users based on life expectancy of the purchased item.
* In the case of car, approach persons learning to drive.
* Approach people who are getting their building licenses or permissions
* Contact printing presses who prepare wedding invitations, find out the bride and bridegroom and propose various household appliances.

The above things point out to events that precede actual demand and action by sales people can give larger order-to-delivery period.

Of course, actions to reduce production cycle has to go on.

Companies have to move from SMED to One-Touch Setups

No-touch methods

Shingo points out that manufacture can be done in sets, so that one component is made after another component without the operator touching the machine. It means that even change of component is automated.

The Development of a Comprehensive Flow System

TPS presently uses supermarket system. Can it be eliminated and the entire system be made a flow system?

Extending mixed production to machine shop, presswork, welding, forging and casting.

Kanban System Developments

Shingo says he foresees further reduction in Kanbans between processes means less WIP.
Second,. Shingo says the Kanbans can go to further upstream processes instead of the preceding process and thus helping in cutting WIP further.

Developing low cost machines and implementing multi-process handling
It needs to be extended to all the production system.

Extending to Supplier Plants

Efforts will be made to spread the TPS to the entire supply chain.


Summary of Shigeo Shingo's Book - A Study of the Toyota Production System

Toyota Production System Industrial Engineering (TPS IE) Part 1


Summary of Chapters 1 to 3

Chapter 12  - Introducing Toyota Production System

Introducing and Implementing the Toyota Production System - Shigeo Shingo


Chapter 13. The Toyota Production System in Summary


1. The Minus-Cost Principle
2. Non-Stock (JIT) - The First Cornerstone of Waste Elimination
3. Toward Flow Operation
4. Shortening Setup Changeover Times
5. The Elimination of Breakdowns and Defects
6. Fusing Leveling and Non-Stock Production
7. Toward Comprehensive Integrated Flow Operations
8. Labor Cost Reduction (Autonomation): The Second Cornerstone of Waste Elimination
9. From Mechanization to Autonomation
10. Maintaining and Developing Standard Operations
11. Toward a Kanban System

Chapter 14 Afterword


A thesis will have antithesis in dialectics.
There can be a compromise between the two to satisfy both the groups at a point in time.

But Shingo says, the proponents of thesis can try sublation.

What is sublation?


In it's basic meaning, it stands for raising something, from a lower place to a higher place.  Hegel, the famous proponent of dialectics, uses meaning and advocates the need to take the original thesis to a higher level, by preserving what is good in it and improving the disadvantages indicated by the antithesis.

Shingo gives the example that non-stock required deliveries from suppliers every two hours.  The opposing argument pointed out that truck efficiency of the supplier or from the supplier end will go down drastically and will result in increased cost. This disadvantage assumes that one truck will carry the load of one supplier. The sublated solution was that a truck was going to various suppliers and collecting material from them. So trucks were loaded to capacity and trucking cost was not allowed to go up. Thus a higher-level plan involving a totally new method - frequent mixed load deliveries emerged.

The disadvantage of smaller lot sizes was tackled by reduction of set up cost through SMED.

The sublation approach is used in many problems in Toyota.

The primary features of the Toyota production are:
1. Elimination of waste based on the belief that a company's only legitimate source of profits is cost reduction.
2. Satisfy demand through order based non-cost production.

The TPS has been compared to squeezing water from a towel thought to be dry. Many people settle for placing that towel under sun to dry further. But there are some people who squeeze the towel further and bring out some more water. Similarly there are many who eliminate waste that everyone recognizes as waste. Certain problems are allowed to exist in companies are necessary evils and people have become hostage to them. But in TPS, such problems are understood with detailed observation supported by deep thinking and problem solving  goes back to basic issues from which designs emerge to make revolutionary improvements.

Anyone undertaking the study of the Toyota production system comes face to face with SMED concept. Shingo said, "It is developed by me." SMED is now a theory and technique. It is now employed in hundreds of Japanese companies.

TPS is not entirely different from ordinary production management systems. But has unique concepts and special techniques to implement them.  It would be dangerous to take any of the techniques of TPS and implement it in a hurry. This will lead to problems. Shingo himself gave a plan to implement the techniques in a sequence.  One should not rush in to implementation of techniques. The objective is cost reduction and as long as the objective is being achieved, there is no need to rush into techniques. The importance is to be given achieve cost reduction in a continuous way and the next priority is schedule of implementing the next technique.



MACHINE EFFORT INDUSTRIAL ENGINEERING - Neglected Component of Industrial Engineering of F.W. Taylor.

"Through this lowering of the selling price the whole public, the buyer and user, of the joint product of the labor and machinery have profited by getting what they buy cheaper." - Taylor in Testimony.

Note products of industrial establishments are the joint product of the labor and machinery.

Celebrate the birthday of F.W. Taylor in your Industrial Engineering Department and Company. Share what you are implementing in your company from Taylor's Ideas.


Birthday of F.W. Taylor 20th March. Modern Industrial Engineering March  2026 Issue - Taylor Month of IE - Contribution of F.W. Taylor to Industrial Engineering and Productivity Management - Implemented and Neglected
Access Essays on F.W. Taylor's Writing - Belt Drive Design, Productivity System and Section, Shop Management, Productivity Science of Machining, and Scientific Management
#IndustrialEngineering #Productivity #CostReduction  #Products  #Processes #Facilities


Updated on 23.4.2022,  5.10.2021,  22 August 2019, 1 December 2014












Machine Effort Industrial Engineering - Machine Study and Machine Work Study

MACHINE EFFORT INDUSTRIAL ENGINEERING - Neglected Component of Industrial Engineering of F.W. Taylor.

"Through this lowering of the selling price the whole public, the buyer and user, of the joint product of the labor and machinery have profited by getting what they buy cheaper." - Taylor in Testimony.

Note products of industrial establishments are the joint product of the labor and machinery.

Celebrate the birthday of F.W. Taylor in your Industrial Engineering Department and Company. Share what you are implementing in your company from Taylor's Ideas.

Birthday of F.W. Taylor 20th March. Modern Industrial Engineering March  2026 Issue - Taylor Month of IE - Contribution of F.W. Taylor to Industrial Engineering and Productivity Management - Implemented and Neglected

Access Essays on F.W. Taylor's Writing - Belt Drive Design, Productivity System and Section, Shop Management, Productivity Science of Machining, and Scientific Management

https://www.linkedin.com/pulse/march-2026-issue-taylor-month-ie-contribution-fw-industrial-kvss-71nlc

I am highlighting in the year 2026, the tasks neglected by industrial engineering profession even though Taylor thought of them. Machine effort industrial engineering got neglected in industrial engineering curriculums. It is a major blunder. IE professors have to correct this deficiency as early as possible to make IE a strong engineering and management discipline that improves engineering processes and systems effectively.



Frederick Taylor's Productivity Improvement System - Element Level Machine/Tool/Work Improvement - Time Calculation and Measurement -  Piece Rate Fixing  -  1895 

 Part 1 -  Part 2   -  Part 3 -  Part 4 - Part 5 - Part 6


Taylor - Productivity Science and Art of Metal Cutting - Important Points

https://nraoiekc.blogspot.com/2019/06/taylor-art-of-metal-cutting-important.html


Productivity Improvement in Machine Shop - F.W. Taylor

https://nraoiekc.blogspot.com/2020/05/productivity-improvement-in-machine.html


Practices of Toyota - Machine Effort Industrial Engineering 


Equipment Acquisition and Improvement 

Toyota plans its production systems with low operating rate for many machines. Hence, Toyota buys less expensive machines. But it improves the machines to suit its requirements continuously. 

Improving Methods of Operation

The operation, which is a man-machine combination can be improved through:

1. Improvements in human motions
2. Improvement in machine movements - increasing machine cutting speeds, reducing time through simultaneous cutting on multiaxis machines, and using multiple turret heads to shorten tool replacements.
3. Mechanizing human motions.

Improving human motions

Motion study can be used to reduce the operation time or the operator time. Motion study improves the movements or motions made by the operator and also improves the arrangement of materials and tools. 5S movement of Japanese industry is basically the offshoot of principles of motion economy.

Items must be arranged neatly, they must be easily accessible and they must be uniformly aligned.

Improvements in Machine Movements

Examples include raising output by increasing machine cutting speeds, reducing time through simultaneous cutting on multi-axis machines, and using multiple turret heads to shorten tool replacement time. This could involve using faster cutting processes like milling in the place of slower process like shaping.

Mechanizing Human Motions

In Toyota, first the human motions are optimized and then mechanization is attempted. Whenever mechanization is thought of its economics are thoroughly investigated. Toyota insists on kaizen - good change.

Seven Steps in Automating Machining Operations (Baudin)

In early days Toyota engineers had a list of tasks to be done in automating machining. Now all their machines are automated to a very large extent. But engineers of companies that are in the process of automating can learn from the Toyota's automation steps list.


1. Adding a power drive:  As we know, most of the machines now provide power to the work piece in case of lathe and to the rotary tool in case of milling machines.

2. Adding power feed: In case of lathe, tool feed is done through power. Still an operator is required to stop the cut.

3. Automatic stopping of the cut:  If the machine can stop the cut automatically as specified, the operator can start the cut and go and attend another machine. If the tool can come to the starting position after completing a cut, it will save some more time of the operator.

4. Automatic unloading: If the operation is completed, the machine can eject the completed part.

5. Automatic loading: If the machine can eject the completed part and pick and load the new blank, it is the next level of automation. The operator's role and required time further gets reduced.

6. Automatic problem detection: If the machine can detect problems in its functioning through sensors, operator is further relieved of some monitoring functions. If a problem is detected, machine will stop and announce the situation through alarms. Operator can come and take care of the problem.

7.Automatic transportation: In this automation step, the completed part of a machining operation is moved to the next machine automatically.

https://nraoiekc.blogspot.com/2021/04/jidoka-automation-and-mechanization.html

https://nraoiekc.blogspot.com/2022/05/the-toyota-production-system-features.html


27.3.2026

Narayana Rao KVSS

Professor (Retired), NITIE - Now IIM Mumbai - Offering FREE IE ONLINE Course Notes



For each connected machine, the details of work done by the machine can be described by events. Each speed change can be an event. Each feed change can be an event etc.


The machine working can be captured as events and the work of machine between each machine related event can be captured. This will give the opportunity to examine machine effort and improve it.










Ud. 6.3.2026

Pub. 3.7.2025





Jidoka - Automation and Mechanization - Process Engineering, Facilities and Industrial Engineering in Toyota Production System

Industrial engineering has two important components - Machine Effort Industrial Engineering and Human Effort Industrial Engineering. 

Jidoka - Human Effort Engineering and Industrial Engineering in Toyota Production System  

Jidoka refers to Process Design and Process Improvement in Toyota Production System. It also includes operator work design and training. Jidoka is development of full process involving machines and operators.

"The deeper meaning of Jidoka is improving production process and machines so they can always do work that adds value instead of just spinning their gears. Ohno’s choice of spelling for Jidōka (See image below) emphasizes that if we remove non-value added work and improve value-added work the defects will ultimately be eliminated." - Jun Nakamuro, Fully Endorsed Expert for Organizational Transformation Based on the Ohno Method and TPS

Re-Translating Lean from Its Origin, January 5, 2017

"The concept of jidoka originated in the early 1900s when Sakichi Toyoda, founder of the Toyota Group, invented a textile loom that stopped automatically when any thread broke. Previously, if a thread broke the loom would churn out mounds of defective fabric, so each machine needed to be watched by an operator. Toyoda’s innovation let one operator control many machines. In Japanese, jidoka is a Toyota-created word pronounced exactly the same (and written in kanji almost the same) as the Japanese word for automation, but with the added connotations of humanistic and creating value."

https://www.lean.org/lexicon-terms/jidoka/

自動化



The word below in the picture is used in Toyota for Jidoka. It indicates machines with human touch or intelligence. It is automatic machines with human touch. It can be interpreted as a system having machines and people with appropriate roles that provides quality and productivity (lack of waste of resources).

Mr. Michel Baudin described some aspects of machine effort engineering and machine  effort industrial engineering in Toyota Production System in his "Working with Machines: The Nuts and Bolts of Lean Operations with Jidoka." Baudin also discussed human effort engineering and industrial engineering in the book.


A Toyota Leader on Misunderstandings About the Toyota Production System

It's a talk given by Nampachi Hayashi at the “Building on Success 2018 Conference.”

Mr. Hayashi says the name “should have been TPS = Toyota Process Development System.”

Jidoka = Toyota Process Development System.

Built-in quality and improved flow leading to lower cost… as a result. Cost reduction isn't the primary lever that's pulled (as we see attempted in so many Western companies)… it's a result. Simple cost-cutting might not lead to better quality and flow (it's often quite the opposite that happens). But better flow and better quality always leads to lower cost, in my experience. Productivity is also a forward activity. It focuses on fully utilizing the machine and man to do a job with less resources. This it results in lower cost.



Autonomation describes a feature of machine design to effect the principle of jidoka (自働化)(じどうか jidouka), used in the Toyota Production System (TPS) .

Etymology
The word "autonomation" 自働化, a loan word from the Sino-Japanese vocabulary, is a portmanteau of "autonomous" and "automation" 自動化, which is written using three kanji characters: 自(じ ji) "self", 動(どう dou)movement, and 化(か ka)"-ization". In the Toyota Production System, the second character is replaced with 働(どう dou) "work", which is a character derived by adding a radical representing "human" to the original 動.


Two Pillars of TPS - Jidoka and JIT

Jidoka - Process designs (Process engineering, Process Planning and Process Industrial Engineering) that eliminate waste

https://global.toyota/en/company/vision-and-philosophy/production-system/

JIT - Material procurement and flow system that eliminates waste.


Jidoka is based on engineering - Product engineering, process engineering, facilities engineering. product industrial engineering, process industrial engineering, facilities industrial engineering,  human effort industrial engineering.


Toyota Production System - Vision & Philosophy (From Company's Website)


Toyota Production System is a production system based on the philosophy of achieving the complete elimination of all waste in pursuit of the most efficient methods.

This production control system was established  with the objective of making the vehicles ordered by customers in the quickest and most efficient way, in order to deliver the vehicles as swiftly as possible. The Toyota Production System (TPS) was established based on two concepts: "jidoka" (which can be loosely translated as "automation with a human touch"),  and the "Just-in-Time" concept, in which each process produces only what is needed for the next process in a continuous flow.

Based on the basic philosophies of jidoka and Just-in-Time, TPS can efficiently and quickly produce vehicles of sound quality, one at a time, that fully satisfy customer requirements.

TPS and its approach to cost reduction are the wellsprings of competitive strength and unique advantages for Toyota. 


The TPS concept

For Toyota, jidoka means that  machines come to a safe stop whenever an abnormality occurs.  

To develop such intelligent machines and processes incorporating these machines, engineers meticulously build each new line component to exacting standards and further improve them  through incremental kaizen (industrial engineering - continuous improvement). Engineers simplify the operations. They create instruction sheets so that the skills of engineers are transferred to operators. The process instruction sheet and the training associated with it enables any operator to use the line to produce the same result.

Once the line is producing the required quality production, the jidoka mechanism is incorporated into actual production lines. Through the engineering repetition of this process by engineers, machinery becomes simpler and less expensive, while maintenance becomes less time consuming and less costly, enabling the creation of simple, slim, flexible lines that are adaptable to fluctuations in production volume.

The work done by engineers by their own hands in this process is the bedrock of engineering skill. Machines and robots do not think for themselves or evolve on their own. Rather, they evolve as we transfer our skills and craftsmanship to them. In other words, craftsmanship is achieved by learning the basic principles of manufacturing through actual work, then applying them on the factory floor to steadily make improvements. This cycle of improvement in both human skills and technologies is the essence of Toyota's jidoka. Advancing jidoka in this way helps to increase machine capabilities and human resource capabilities.

Human wisdom and ingenuity are indispensable to delivering ever-better cars to customers. Going forward, we will maintain our steadfast dedication to constantly developing human resources who can think independently and implement kaizen.


Just-in-Time

―Improving productivity―

Making only "what is needed, when it is needed, and in the amount needed"

Producing quality products efficiently through the complete elimination of waste, inconsistencies, and unreasonable requirements on the production line (known respectively in Japanese as muda, mura, muri).

In order to fulfill an order from a customer as quickly as possible, the vehicle is efficiently built within the shortest possible period of time by adhering to the following:

When a vehicle order is received, production instructions must be issued to the beginning of the vehicle production line as soon as possible.

The assembly line must be stocked with the required number of all necessary parts so that any kind of ordered vehicle can be assembled.

The assembly line must replace the parts used by retrieving the same number of parts from the parts-producing process (the preceding process).

The preceding process must be stocked with small numbers of all types of parts and produce only the numbers of parts that were retrieved by an operator from the next process.


"Sakichi Toyoda worked with the problem and resolved it. Now the machine no longer has to stop. Hence, it is the ultimate form of jidoka: Make a machine that can run without stops!"   Christoph Roger in   https://www.allaboutlean.com/jidoka-3/

My comment on Rogers' post in Linkedin

Jidoka is to be interpreted as better and better machines and processes. It is better and better engineering. The interpretation of lean theory has distorted the meaning. Its interpretation has to better and better combination of machines and people (process).

Jidoka - Excellent Machines - Excellent Operators - Process Engineering and Industrial Engineering in Toyota Production System

https://nraoiekc.blogspot.com/2021/04/jidoka-automation-and-mechanization.html


How to implement Jidoka in Lean Manufacturing ? Autonomation

Knowledge Factory-Lean Six Sigma
"Jidoka, also known as automation with a human touch, comes from the Japanese word for 'autonomation'. It's about creating a system where machines, not humans, identify and resolve errors."


Shigeo Shingo on  Toyota Production System Industrial Engineering

Shigeo Shingo - Toyota Production System Industrial Engineering (TPS IE) Part 1

https://nraoiekc.blogspot.com/2014/02/industrial-engineering-foundation-of.html


Shigeo Shingo - Toyota Production System Industrial Engineering (TPS IE) Part 2

http://nraoiekc.blogspot.com/2013/12/toyota-production-system-industrial.html


Shigeo Shingo - Introducing and Implementing the Toyota Production System Industrial Engineering - Part 3

http://nraoiekc.blogspot.com/2013/12/introducing-and-implementing-toyota.html


Michel Baudin - "Working with Machines: The Nuts and Bolts of Lean Operations with Jidoka."

Steps of Automation for Machining


1. Introduction of power feed.

2. Automatic stop and return to start position at the end of a cut

3. Automatic unloading of the workpiece

4. Automatic loading of the workpiece

5. Automatic error diagnosis

6. Automatic transportation between operations


Chapter 12: The Lean Approach to Automation


Toyota uses machines and automation at all appropriate places. In this if follows the principle advocated by Barnes. For each step in a process/operation, the best of automation, mechanization or manual work is to be used.


Jidoka is machine - people (machine-man) system. Toyota added man to classical machine symbol and created the symbol for Toyota's Jidoka (Baudin).


Mechanization designates the replacement of human or animal muscle with machines to perform work.

After mechanization of many activities, automation was started by engineers. In automation, machines are told through mechanical means, electrical means, hydraulic means, electronic means or through computer instructions when to start and when to stop and what to do.

Automation reduces amount of human intervention in working of machines. Any change that results in fewer or shorter operator intervention in work of the machines is automation.


Seven Steps in Automating Machining Operations

In early days Toyota engineers had a list of tasks to be done in automating machining. Now all their machines are automated to a very large extent. But engineers of companies that are in the process of automating can learn from the Toyota's automation steps list.


1. Adding a power drive:  As we know, most of the machines now provide power to the work piece in case of lathe and to the rotary tool in case of milling machines.

2. Adding power feed: In case of lathe, tool feed is done through power. Still an operator is required to stop the cut.

3. Automatic stopping of the cut:  If the machine can stop the cut automatically as specified, the operator can start the cut and go and attend another machine. If the tool can come to the starting position after completing a cut, it will save some more time of the operator.

4. Automatic unloading: If the operation is completed, the machine can eject the completed part.

5. Automatic loading: If the machine can eject the completed part and pick and load the new blank, it is the next level of automation. The operator's role and required time further gets reduced.

6. Automatic problem detection: If the machine can detect problems in its functioning through sensors, operator is further relieved of some monitoring functions. If a problem is detected, machine will stop and announce the situation through alarms. Operator can come and take care of the problem.

7.Automatic transportation: In this automation step, the completed part of a machining operation is moved to the next machine automatically.


What Baudin emphasizes is that automation is done in steps so that labor productivity increase takes and operators do not lose the jobs all of a sudden. The system's output expands to provide work to all operators and share the productivity benefit. The automation exercise is carried out taking into consideration the stability of the employment.


Principles Underlying Automation in TPS


1. Productivity improvement must not lead to layoffs.

In USA, large automation projects are implemented, layoffs are implemented. Not so in Toyota.

2. Capability of in-house development

Toyota develops capability to do custom development of machines it buys from standard outside vendors.

3. Decentralized control

Two machines can communicate and manage work in between them. Centralized control is not needed for local events.

4. Automation levels and skill management

As automation proceeds step by step on various operators also upgrade themselves step by step. 


Chapter 13 Improving Legacy Automated Systems


In the chapter Baudin discussed the utility of automated production systems or facilities available like transferlines, FMS, rotary index machines and stacked conveyor loops in lean manufacturing systems.


Transfer lines


Transfer lines are arranged in a straight line for convenience of automatic material handling. The manufactured part moves in a fixed sequence through all the machines to become the machined part.

Transfer line is similar to automated machining cell for a group of a parts.

The machines in the transfer line are being replaced by high speed machining centers with pallet exchangers that can machine various features in a single piece production. 


Toyota Engineers


Kiyohide Motiki - Casting Engineer - https://toyotatimes.jp/en/feature/028.html


 GR Company GRZ Chief Engineer Yasunori Suezawa, who had served as Chief Engineer for the Yaris (Toyota Car Model) -  https://toyotatimes.jp/en/chief_editor/065.html


Jidoka - Kiyoshi Suzaki

In the Process of the Challenge, and the Use of the Jidoka Concept

Kiyoshi Suzaki in Target, Spring 1988, pp. 4-9.


What is the target?

Is it to produce required products, at the required time, in the quantity required with highest quality at lowest cost? 

Is it a challenge to continuous improvement? 

Or is it simply the elimination of waste?



Jidoka is to manufacturing what disciplined exercise is to the nervous and muscle systems of our body. As we increase our athletic skills through training, our body eventually responds to necessary changes much more quickly and accurately than before. There is a similar need to train ourselves in manufacturing to compete and survive. But how we can effectively practice this Jidoka concept is clearly the challenge.


.In order to make changes effectively by incorporating people with the Jidoka concept, there are a few points worth summarizing:

1. Persons in charge of operations (operators) should satisfy their customer's needs (that is, the next process) in cost, quality, and delivery according to the prescribed standards. Naturally, this practice of following the standard procedure requires discipline.

2. Supervisors) should  solve problems exposed from the procedures currently in place. Without standards, we can see no abnormality. If standards are not practiced by subordinates, the supervisor is not fulfilling his role.

3. Production managers  should have an even broader knowledge, balanced perspective, a higher level of commitment to achieve goals, and the ability to lead the organization toward such goals. This person should be able to develop or introduce new standards on Jidoka mechanisms (Process and process improvement) into the organization and make sure each procedure, standard, and mechanism is well maintained.

Jidoka - More Online Resources

What Exactly Is Jidoka?

July 17, 2018 by Christoph Roser

https://www.allaboutlean.com/jidoka-1/


https://mag.toyota.co.uk/jidoka-toyota-production-system/

https://www.apo-tokyo.org/resources/p_glossary/jidoka-2/

https://leanmanufacturing.online/jidoka/

https://in.kaizen.com/blog/post/2016/10/12/jidoka-the-forgotten-pillar.html

Ohno's goals for Jidoka

http://www.process-improvement-japan.com/toyota-history.html

https://papers.ssrn.com/sol3/papers.cfm?abstract_id=3738342  41 page book

https://www.sciencedirect.com/science/article/pii/S2405896319312844  Article in science direct.

Rethinking Jidoka Systems under Automation & Learning Perspectives in the Digital Lean Manufacturing World

DavidRomero1 PaoloGaiardelli2 DarylPowell3 ThorstenWuest4 MatthiasThürer5

IFAC-PapersOnLine, Volume 52, Issue 13, 2019, Pages 899-903


An Application of SMED and Jidoka in Lean Production

January 2019

DOI:10.1007/978-3-319-92267-6_45

In book: Proceedings of the International Symposium for Production Research 2018 (pp.530-545)

Authors:

Mahmut Tekin et al.

https://www.researchgate.net/publication/327041611_An_Application_of_SMED_and_Jidoka_in_Lean_Production

Jidoka means “Intelligent people and machines." 
Masters Thesis

https://michelbaudin.com/tag/jidoka/


Recent References - Jidoka


Ansari et al., 2018a

F. Ansari, S. Erol, W. Sihn

"Rethinking Human-Machine Learning in Industry 4.0: How Does the Paradigm Shift Treat the Role of Human Learning?"

Procedia Manufacturing: 8th Conference on Learning Factories - Advanced Engineering Education & Training for Manufacturing Innovation, 23 (2018), pp. 117-122


Ansari et al., 2018b

F. Ansari, M. Khobreh, U. Seidenberg, W. Sihn

"A Problem-Solving Ontology for Human-Centered Cyber Physical Production Systems"

CIRP Journal of Manufacturing Science and Technology, 22 (2018), pp. 91-106


Bainbridge, 1983

L. Bainbridge

"Ironies of Automation"

Automatica, 19 (6) (1983), pp. 775-779


Baxter et al., 2012

Baxter, G.; Rooksby, J.; Wang, Y. and Khajeh-Hosseini, A. (2012). "The Ironies of Automation… Still Going Strong at 30?", 30th European Conference on Cognitive Ergonomics, pp. 65-71.


Billings, 1996

C.E. Billings

"Aviation Automation: The Search for a Human-Centered Approach", CRC Press (1996)


Bao et al., 2018

Z. Bao, Y. Wang, Z. Yang, C. Zhu, C. Jin

"Design on the Virtual Maintenance Training System of Some-Type Equipment Based on the Virtual Reality"

International Conference on Man-Machine-Environment System Engineering, Lecture Notes in Electrical Engineering, 527 (2018), pp. 479-487


Camarinha-Matos and Afsarmanesh, 1995

L.M. Camarinha-Matos, H. Afsarmanesh

"Introduction: Towards Balanced Automation", Balanced Automation Systems: Architectures and Methods, Springer (1995), pp. xi-xii


Camarinha-Matos and Afsarmanesh, 1996

L.M. Camarinha-Matos, H. Afsarmanesh

"Introduction: Implementation Challenges for Balanced Automation", Balanced Automation Systems II: Implementation Challenges for Anthropocentric Manufacturing, Springer (1996), pp. xiii-xiv


Camarinha-Matos et al., 1997

L.M. Camarinha-Matos, R. Rabelo, L. Osório

"Balanced Automation", in Management and Control of Manufacturing Systems, S.G. Tzafestas (Ed.), Springer-Verlag (1997), pp. 376-413


Chen et al., 2010

H. Chen, R.R. Lindeke, D.A. Wyrick

"Lean Automated Manufacturing: Avoiding the Pitfalls to Embrace the Opportunities"

Assembly Automation, 30 (2) (2010), pp. 117-123




Hold et al., 2017

P. Hold, S. Erol, G. Reisinger, W. Sihn

"Planning and Evaluation of Digital Assistance Systems"

Procedia Manufacturing: 7th Conference of Learning Factories, 9 (2017), pp. 143-150


Jackson et al., 2011

M. Jackson, M. Hedelind, E. Hellstrӧm, A. Granlund, N. Friedler

"Lean Automation: Requirements and Solutions for Efficient Use of Robot Automation in the Swedish Manufacturing Industry"

International Journal of Engineering Research and Innovation, 3 (2) (2011), pp. 36-43


Kelleher et al., 2015

J.D. Kelleher, B. Mac Namee, A. D’Arcy

"Fundamentals of Machine Learning for Predictive Data Analytics: Algorithms, Worked Examples, and Case Studies", MIT Press (2015), pp. 1-3

17, 117, 179, 247, 323.


Lenz et al., 2018

J. Lenz, T. Wuest, E. Westkaemper

"Holistic Approach to Machine Tool Data Analytics"

Journal of Manufacturing Systems, 48 (2018), pp. 180-191

DOI: 10.1016/j.jmsy.2018.03.003.




Mora et al., 2017

E. Mora, P. Gaiardelli, B. Resta, D. Powell

"Exploiting Lean Benefits Through Smart Manufacturing: A Comprehensive Perspective", The Path to Intelligent, Collaborative and Sustainable Manufacturing, Lödding, H. et al. (Eds.), IFIP, APMS, AICT 513, Part I, Springer (2017), pp. 127-134







Romero et al., 2016a

D. Romero, P. Bernus, O. Noran, J. Stahre, Å. Fast-Berglund

"The Operator 4.0: Human Cyber-Physical Systems & Adaptive Automation towards Human-Automation Symbiosis Work Systems", Production Management Initiatives for a Sustainable World, Nääs, I. et al. (Eds.), IFIP, AICT 488, Springer (2016), pp. 677-686


Romero et al., 2016

Romero, D.; Stahre, J.; Wuest, T.; Noran, O.; Bernus, P.; Fast-Berglund, Å. and Gorecky, D. (2016b). "Towards an Operator 4.0 Typology: A Human-Centric Perspective on the Fourth Industrial Revolution Technologies", International Conference on Computers & Industrial Engineering, Tianjin, China, pp. 1-11.


Romero et al., 2018

D. Romero, P. Gaiardelli, D. Powell, T. Wuest, M. Thürer

"Digital Lean Cyber-Physical Production Systems: The Emergence of Digital Lean Manufacturing and the Significance of Digital Waste"

Part I, IFIP AICT, 535 (2018), pp. 11-20




Sheridan and Parasuraman, 2015

T.B. Sheridan, R. Parasuraman

"Human-Automation Interaction"

Reviews of Human Factors and Ergonomics, 1 (89) (2015), pp. 89-129

Google Scholar

Sezer et al., 2018

Sezer, E.; Romero, D. Guedea, F.; Macchi, M. and Emmanouilidis, C. (2018)."An Industry 4.0-enabled Low Cost Predictive Maintenance Approach for SMEs:AUse Case Appliedto aCNC Turning Centre", 24th International ICE-Conference on Engineering, Technology and Innovation, pp. 1-8, DOI: 10.1109/ICE.2018.8436307.


Strauch, 2017

B. Strauch

"Ironies of Automation: Still Unresolved After All These Years"

IEEE Transactions on Human-Machine Systems, 48 (5) (2017), pp. 419-433




Webel et al., 2013

S. Webel, U. Bockholt, T. Engelke, N. Gavish, M. Olbrich, C. Preusche

"An Augmented Reality Training Platform for Assembly and Maintenance Skills"

Robotics and Autonomous Systems, 61 (4) (2013), pp. 398-403



Systematic combination of Lean Management with digitalization to improve production systems on the example of Jidoka 4.0

Jochen Deuse, Uwe Dombrowski, Fabian Nöhring, ...

International Journal of Engineering Business Management

First Published August 25, 2020 Research Article

https://doi.org/10.1177/1847979020951351

https://journals.sagepub.com/doi/full/10.1177/1847979020951351   - Open Access


Meanings   自働化 - Jidoka or Jidouka - Japanese - English


jidoka (自働化)(じどうか jidouka),


Entry Details for 自働化


Definition and Synonyms for 自働化

1. 自動化 高度な技術を用いた手段

Automation the act of implementing the control of equipment with advanced technology

Synonyms: 機械化, 自動化

2. 自動化 自動にする、制御するまたは自動に作動する

Automate make automatic or control or operate automatically

Synonyms: 自動化

3. 自動化 自動制御または操作を達成させるのに使用される装置

Automation equipment used to achieve automatic control or operation

Synonyms: 自動化

4. 自動化 自動的に操作または制御される状態

Automation the condition of being automatically operated or controlled

Synonyms: 自動化

5. 自動化 通常電子ハードウェアを含むこと

Automation usually involving electronic hardware

Synonyms: 機械化, 自動化

https://www.tanoshiijapanese.com/dictionary/entry_details.cfm?entry_id=30456&element_id=41599

kikai (Japanese)

Romanization

kikai

Romaji transcription of きかい


This is the meaning of きかい:


きかい (Japanese)

Noun

きかい

機会: opportunity

機械, 器械: machine

奇怪: strange, mysterious

棋界: the shogi world


https://www.wordsense.eu/kikai/


自動化, 自働化, じどうか

jidōka


Definition:  automation


Related Kanji

自

oneself

動

move, motion, change, confusion, shift, shake

化

change, take the form of, influence, enchant, delude, -ization

働

work, (kokuji)

https://nihongomaster.com/japanese/dictionary/word/30387/jidouka


自働化


Meaning of 自働化 in Japanese

It seems that your search contains the follows:

自  働化


Definition of 自働化

じどうかjidouka  【 自動化 ·自働化 】自動化働 Kanji Details

(n, vs) automation

http://www.romajidesu.com/dictionary/meaning-of-%E8%87%AA%E5%83%8D%E5%8C%96.html



Automation of Operations in Flow Process Chart









MACHINE EFFORT INDUSTRIAL ENGINEERING - Neglected Component of Industrial Engineering of F.W. Taylor.

"Through this lowering of the selling price the whole public, the buyer and user, of the joint product of the labor and machinery have profited by getting what they buy cheaper." - Taylor in Testimony.

Note products of industrial establishments are the joint product of the labor and machinery.

Celebrate the birthday of F.W. Taylor in your Industrial Engineering Department and Company. Share what you are implementing in your company from Taylor's Ideas.


Birthday of F.W. Taylor 20th March. Modern Industrial Engineering March  2026 Issue - Taylor Month of IE - Contribution of F.W. Taylor to Industrial Engineering and Productivity Management - Implemented and Neglected
Access Essays on F.W. Taylor's Writing - Belt Drive Design, Productivity System and Section, Shop Management, Productivity Science of Machining, and Scientific Management



Updated on 14.1.2025, 10.8.2023,  7.10.2021, 20 May 2021,  3 May 2021

Published on 24 April 2021