Friday, April 28, 2023

X-Axis Industrial Engineering - Y-Axis Multiple Dimensions of Performance Improvement

 28


While effort in industrial engineering is plotted on X-axis, on Y axis we can plot various performance measures improved by industrial engineering. Productivity is one such measure. Unit cost of product is another appropriate measure.


Other measures can be.

Defects

Employee comfort

Accidents

Occupational health problems

Machine availability



Part of 

A to Z of Industrial Engineering - Principles, Methods, Techniques, Tools and Applications

https://nraoiekc.blogspot.com/2018/06/a-to-z-of-industrial-engineering.html


No comments:

Post a Comment