Saturday, July 6, 2024

Productivity Improvement Projects and Case Study Reports - News - 2024

 

Powerplant Productivity Improvement Study: Project Summary. 

UNT Digital Library

26 Jun 2024 — Key findings from the Illinois Powerplant Productivity Improvement Study.

https://digital.library.unt.edu/ark:/67531/metadc1065912/



Heliyon

Volume 10, Issue 1, 15 January 2024, e23585

Productivity improvement through assembly line balancing by using simulation modeling in case of Abay garment industry Gondar

Melkamu Mengistnew Teshome a, Tamrat Yifter Meles b, Chao-Lung Yang a

https://doi.org/10.1016/j.heliyon.2023.e23585

https://www.sciencedirect.com/science/article/pii/S2405844023107936



Turk Patoloji Derg

2024;40(1):27-36. doi: 10.5146/tjpath.2023.01610.

Productivity Improvement in Pathology Laboratories Using Motion and Time Study Techniques

Canan Cinar , Afsun Ezel Esatoglu 

https://pubmed.ncbi.nlm.nih.gov/37747084/




Productivity Improvement in an Automotive Workshop

PDF

by GNG Bruner — Productivity Improvement in an Automotive Workshop through Lean. Manufacturing Methodology.

https://avestia.com/MCM2023_Proceedings/files/paper/ICMIE/ICMIE_145.pdf



How Asahi Kasei Automated Logistics & Shipping?

16 Dec 2023 — Discover how Asahi Kasei Plastics automated logistics and shipping, achieving a 15% productivity improvement. 

https://www.velostics.com/resources/15-warehouse-productivity-improvement-how-asahi-kasei-automated-logistics-shipping-and-receiving-collaboration-and-scheduling



19 Nov 2023 — “Nexon BIW Shop productivity improvement to meet ever rising Customer Demands. Propelling Tata Motors Aspirational Growth”. Bhagwan Bhosale. (BIW Manufacturing).



Heliyon Volume 9, Issue 7, July 2023, e17917

Assembly operation productivity improvement for garment production industry through the integration of lean and work-study, a case study on Bahir Dar textile share company in garment, Bahir Dar, Ethiopia

Mequanent Ewnetu, Yewondwosen Gzate 

https://www.sciencedirect.com/science/article/pii/S2405844023051253



Elimination of Delays and Losses due to Conveyor System

CEMENT PLANT IN EAST INDIA

Application: 1550 MW Power Plant in North India

Customer Concern:

Conveyor 2B, 1200mm BW, plays a vital role in conveying material from wagon tippler to main plant.

The conveyor had excessive spillage at the loading station, frequent damage of impact idlers & return idlers and belt damage both at the center & edges.

Frequent engagement of manpower at conveyor site meant frequent shutdowns which resulted in loss of productivity and huge container demurrage.


Results:

Premature failure of 3 impact idlers in a month was eliminated.

Belt life increased to 18 months from 14 months.

Belt sway reduced from 100mm to 20mm on both the sides of the conveyor.

Monthly accumulation of spillage reduced from 70 tons to 12.5 tons.

Monthly engagement of manpower reduced from 17 man-days to 2.5 mandays.

Premature monthly consumption of return idlers reduced from 5 to 2.

Container demurrage drastically reduced.

Customer made an annual profit 0.96 mn INR.


https://www.tegaindustries.com/case-studies/hosch-total-solution-in-power-plants/


Agricultural Equipment Manufacturing Industry

Production Modeling India case-study 

9 Aug 2023 — Productivity improvement by 67.3%. Manpower reduction by 40.2%. 

https://pmicorp.in/case-study/productivity-improvement-in-agricultural-equipment-manufacturing-industry/



https://www.renoirgroup.com/case_studies/utilities/lean-office-15-productivity-improvement-in-shared-services/












No comments:

Post a Comment