Work Measurement - Principle of Industrial Engineering




TAYLOR - NARAYANA RAO PRINCIPLES OF INDUSTRIAL ENGINEERING





Work Measurement


___________________


Principles of Industrial Engineering - Presentation 


by Dr. K.V.S.S. Narayana Rao in the 2017Annual Conference of IISE (Institute of Industrial and Systems Engineering) at Pittsburgh, USA on 23 May 2017

______________________________


______________________________



Taylor on Time Study and Work Measurement


The writer has endeavored in the following pages to describe the system of management introduced by him in the works of the Midvale Steel Company, of Philadelphia, which has been employed by them during the past ten years with the most satisfactory results.

The system consists of three principal elements :

( i ) An elementary rate-fixing department.
( 2 ) The differential rate system of piece-work.
( 3 ) What he believes to be the best method of managing men who work by the day.


Elementary rate-fixing differs from other methods of making piece-work prices in that a careful study is made of the time required to do each of the many elementary operations into which the manufacturing of an establishment may be analyzed or divided. These elementary operations are then classified, recorded, and indexed, and when a piece-work price is wanted for work the job is first divided into its elementary operations, the time required to do each elementary operation is found from the records, and the total time for the job is summed up from these data. While this method seems complicated at the first glance, it is, in fact, far simpler and more effective than the old method of recording the time required to do whole jobs of work, and then, after looking over the records of similar jobs, guessing at the time required for any new piece of work.