OR Case Studies Discussed in Chapter 11.2 of Maynard's Industrial Engineering Handbook, 5th Edition
REFERENCES
Leachman, R. C., R. F. Benson, C. Liu and D. J. Raar, "IMPReSS: An Automated Production-Planning and Delivery-Quotation System at Harris Corporation - Semiconductor Sector," Interfaces, 26:1, pp. 6-37, 1996.
Rigby, B., L. S. Lasdon and A. D. Waren, "The Evolution of Texaco's Blending Systems: From OMEGA to StarBlend," Interfaces, 25:5, pp. 64-83, 1995.
Flanders, S. W. and W. J. Davis, "Scheduling a Flexible Manufacturing System with Tooling Constraints: An Actual Case Study," Interfaces, 25:2, pp. 42-54, 1995.
Subramanian, R., R. P. Scheff, Jr., J. D. Quillinan, D. S. Wiper and R. E. Marsten, "Coldstart: Fleet Assignment at Delta Air Lines,", Interfaces, 24:1, pp. 104-120, 1994.
Kotha, S. K., M. P. Barnum and D. A. Bowen, "KeyCorp Service Excellence Management System," Interfaces, 26:1, pp. 54-74, 1996.
Recent Case Study Papers
Energy Cost Optimization in a Water Supply System Case Study
Daniel F. Moreira and Helena M. Ramos
Journal of Energy
Volume 2013 (2013), Article ID 620698, 9 pages
http://www.hindawi.com/journals/energy/2013/620698/
Cost Minimizing Coal Logistics for Power Plants Considering Transportation Constraints
Ahmet Yucekaya
Industrial Engineering Department, Kadir Has University, istanbul, Turkey
Journal of Traffic and Logistics Engineering, Vol, 1, No. 2 June 2013
http://www.jtle.net/uploadfile/2013/0514/20130514045651963.pdf
No comments:
Post a Comment