Monday, July 18, 2022

Facilities Industrial Engineering - F.W. Taylor

 

In the paper on piece rate system in which Taylor's productivity improvement was described in good amount of detail first.

74. The careful study of the capabilities of the machines and the analysis of the speeds at which they must run, before differential rates can be fixed which will insure their maximum output, almost invariably result in first indicating and then correcting the defects in their design and in the method of running and caring for them.

75. In the case of the Midvale Steel Company, to which I have already referred, the machine shop was equipped with standard tools furnished by the best makers, and the study of these machines, such as lathes, planers, boring mills, etc., which was made in fixing rates, developed the fact that they were none of them designed and speeded so as to cut steel to the best advantage. As a result, this company has demanded alterations from the standard in almost every machine which they have bought during the past eight years. They have themselves been obliged to superintend the design of many special tools which would not have been thought of had it not been for elementary rate-fixing.

https://nraoiekc.blogspot.com/2018/07/frederick-taylors-piece-rate-system_68.html


Facilities Industrial Engineering









No comments:

Post a Comment