The Challenge
With manufacturing sites across Europe, it was no surprise to learn that Coca-Cola Enterprises (CCE, now CCEP) had many different systems being employed to manage plant performance and were achieving mixed results.
SOLUTION
CCE introduces LineView™ sitewide to instantly and accurately identify the critical area of focus
CCE chose the LineView system as the standard production line monitoring system for their Supply Chain Division. Over three years, LineView has been implemented on every European production line to help increase efficiency and reduce manufacturing costs.
The visual user interface presents actionable information in an easy-to-read format, enabling rapid decision-making and allowing production teams to focus on taking effective action rather than analyzing and interpreting the data.
LineView
Key Benefits:
• Data and AI driven targeted actionable insights
• Seamless integration into existing ERP and MES solutions.
• Automated true causal loss and production monitoring
6-Loss Analysis
Applying 6-Loss Analysis and Theory of Constraints principles, LineView identifies the effect of all downtime on the overall line output without any operator intervention and accurately pinpoints the true cause of productivity loss.
Rigour & Routine for Data Use
To meet the new challenges of the business as they arise and achieve ever-higher levels of performance, Lineview defined the rigor and routines around data use that have driven ongoing, sustainable performance improvement.
Once LineView was installed, the accuracy and availability of information and the potential for real improvement made a giant leap forward. The system has been implemented on more than 70 production lines across Coca-Cola Enterprises.
Site-wide increase in OEE of 20% within 24 months
OEE or Overall Equipment Effectiveness represents the percentage of manufacturing time that is 100% productive. A 1% improvement would itself translate to millions in additional revenue. Coca-Cola Enterprises plants improved their OEE by 20% less than 24 months of LineView™ implementation.
Improvement of 6% across the entire enterprise
Individual sites achieved an impressive 20% increase in OEE, while operations across the wider enterprise achieved a combined 6% improvement in production and distribution. The benefits of LineView™ extend beyond the production halls. We call this the ripple effect of efficiency improvement.
ROI delivered on logistics savings alone
An effective and efficient investment delivers the highest return on investment (ROI) for any business. Lineview delivered ROI for Coca-Cola Enterprises through significant savings in logistics costs. This improvement was driven by an overall increase in yield and consistent quality, leading to a more efficient supply chain and cost savings.
“The power of LineView is in the speed with which teams can identify the real losses to efficiency whilst providing the drill-down necessary for highly effective problem solving.”
Richard Davies
Vice-President Operations,
Coca-Cola Enterprises Ltd.
20%
OEE increase site-wide in 24 months
6%
Improvement across entire enterprise
$$
ROI delivered based on logistics alone